Resource Type

980 Matching Results

Results open in a new window/tab.

Electronics progress report, April 1--30, 1949 (open access)

Electronics progress report, April 1--30, 1949

Prospectus` of Band Pass Amplifiers for Proportional Counters and Instrumentation for the Study of the Electrodeposition Potential of Radioactive Elements have been submitted for review and approval. An error was found in calculations for the band pass amplifier discussed in Group 9 of the Electronics Progress Report,MLM-306, March 1--31, 1949, on the Cathode-Follower Probe. New calculations have been made and a band pass filter constructed to match the new values. Work on the cathode-follower circuit for coupling a Boron-wall tube to its linear amplifier indicated that the limit to the sharpness of a pulse which could be achieved was possibly caused by poor amplitude versus frequency response of the linear amplifier. To check this theory, modifications were made on an existing scaler which resulted in a frequency response flat up to 4.5 megacycles. Plans are being made to improve the amplitude versus frequency of the higher frequencies. The response curve shows a slightly rising characteristic at 4.5 megacycles and an attenuation at 7 megacycles. Construction of the rf generator has been resumed in an effort to deliver the finished product to Group 4 by approximately May 6, 1949. The meter circuit will measure relative rf output voltage instead of absolute …
Date: December 31, 1949
Creator: Heyd, J. W. & Ohmart, P. E.
System: The UNT Digital Library
Electronics progress report, March 1--31, 1949 (open access)

Electronics progress report, March 1--31, 1949

With the completion of tests of the prototype cathode-follower, it was decided to produce three more models. These have been constructed and pass the same pulse as that of the prototype. Drawings are being made of these units. By the time these units had been completed, the amplifier of the scaler was modified so that its frequency response was essentially flat up to 4.5 megacycles. Using this amplifier and the cathode-follower, a study of the pulse shapes was made and four different pulse shapes were found to be obtainable. A band pass network between the B-wall tube and the input of the cathode-follower provided a very substantial improvement over the shunt peaking network with a band pass of 1.8 to 6.5 megacycles and provided clean, uniform pulses. Plans are being made to experiment with a filter of narrower band pass, which, if satisfactory, will produce greater amplitude. When the final band pass has been determined, a combination of shunt peaking and band pass networks should provide a net gain of 30% in amplitude. The result of this research is to provide an immediate improvement in resolution loss and a possibility of realizing a still lower minimum resolving time when the …
Date: December 31, 1949
Creator: Heyd, J. W. & Ohmart, P. E.
System: The UNT Digital Library
Instrumental analysis progress report, June 1--30, 1949 (open access)

Instrumental analysis progress report, June 1--30, 1949

Several bismuth compounds have been submitted by E. Orban for examination by x-ray diffraction. The sample of polonium in contact with platinum mentioned in the May progress report was received and identified tentatively from its x-ray diffraction pattern as PtPo{sub 2}. Calibration of the Perkin-Elmer infrared spectrophotometer has been completed and a preliminary study of the infrared absorption of NiCO{sub 4} made. Data showing the spectral purity obtainable on three ultraviolet-visible spectrophotometers have been completed. The emission spectrum of a sample of volatile impurity from the operations process has been obtained.
Date: December 31, 1949
Creator: Timma, D.L.
System: The UNT Digital Library
Production research progress report, March 1--31, 1949 (open access)

Production research progress report, March 1--31, 1949

A study has been made of the time and temperature required to anneal Teflon and Fluorothene. It has been found that, by proper annealing, the strains my be removed and cold-flow prevented. The disk stopcocks prepared with annealed plastics have not developed leaks on standing. A description is given of the modified slug-dissolver heating unit which has been installed in the Bismuth-II Process Line. Work has been continued on the absorption spectra of bismuth in hydrochloric acid solutions. Two methods have been described for the interpretation of absorption spectra data. The transmission curve of the Evelyn colorimeter filters have been measured on the Cary recording spectrophotometer. The resulting curves should aid in the selection of the proper filter for a given calorimetric analyses. A brief outline for the proposed method of decontaminating platinum has been presented.
Date: December 31, 1949
Creator: Payne, J.H. Jr.
System: The UNT Digital Library
Recovery of uranium and plutonium from Redox off-standard aqueous waste streams (open access)

Recovery of uranium and plutonium from Redox off-standard aqueous waste streams

In the operation of countercurrent extraction columns as in the Redox process, it is possible, and probable, that from unexpected behaviour of a column, operator error, colloid formation, etc., there will result from time to time excessive losses of uranium and plutonium in the overall process. These losses will naturally accumulate in the waste streams, particularly in the aqueous waste streams. If the loss is excessively high, and such lost material can be recovered by some additional method, then if economical and within reason, the recovered materials ran be returned to a ISF column for further processing. The objective of this work has been to develop such a method to recover uranium and plutonium from such off-standard waste streams in a form whereby the uranium send plutonium can be returned to the process line and subsequently purified and separated.
Date: December 31, 1949
Creator: Holm, C. H. & Matheson, A. R.
System: The UNT Digital Library
Nomograms for Obtaining the Compound Composition of Hydrated Limes from the Oxide Analysis (open access)

Nomograms for Obtaining the Compound Composition of Hydrated Limes from the Oxide Analysis

Report with two nomograms presented for rapidly obtaining the compound composition of hydrated limes from the oxide analysis. The general nomogram can be applied to any commercial hydrated lime and gives values accurate to within 0.3 percent while the special nomogram is applicable only to regularly hydrated and highly hydrated dolomitic limes and is accurate to within 0.1 percent.
Date: December 30, 1949
Creator: Levin, Ernest M.
System: The UNT Digital Library
Trip Report, December 16--21, 1949 (open access)

Trip Report, December 16--21, 1949

December 16--20, 1949 were spent in inspection of the equipment of the Naval Pilot Channel Test Rig at the Oak Ridge pile, observation of its maintenance and use, and in discussions with the test operating personnel, and members of the H.P. and pile operating divisions. December 21 was spent at the Argonne National Laboratories, Naval Reactor Division, in inspection of the test rig under construction for use at the H pile. Dr. Etherington requested that I express their desire to arrange that an Argonne scientist be at Hanford with the test rig to act in an advisory capacity, for consultation, and to prepare such reports to Argonne as they may need to call for as the test progresses.
Date: December 30, 1949
Creator: Snoeberger, D. F.
System: The UNT Digital Library
EXPERIMENTAL FACILITIES PROVIDED IN THE MATERIALS TESTING REACTOR. Preliminary Report (open access)

EXPERIMENTAL FACILITIES PROVIDED IN THE MATERIALS TESTING REACTOR. Preliminary Report

None
Date: December 29, 1949
Creator: Winkleblack, R.K.
System: The UNT Digital Library
A PreliminaryReport on the Mechanism of the Decomposition ofDiacetyl Peroxide in Acetic Acid (open access)

A PreliminaryReport on the Mechanism of the Decomposition ofDiacetyl Peroxide in Acetic Acid

The decomposition of diacetyl peroxide in acetic acid-2-C{sup 14} has been studied, The activity of the products in general confirmed the mechanism of the reaction as proposed by Kharasch and Gladstone, The presence and distribution of activity in the methyl acetate produced in this reaction is not explained by the previously proposed mechanism. There was no appreciable exchange of acetic acid and diacetyl peroxide under the conditions of the reaction. Essentially no exchange of methyl acetate and acetic acid was observed when those reagents mere heated at 100 for five hours.
Date: December 29, 1949
Creator: Fry, A.J.; Tolbert, B.M. & Calvin, Melvin
System: The UNT Digital Library
Homogeneous Reactor Preliminary Process Design Report (open access)

Homogeneous Reactor Preliminary Process Design Report

"The following report is meant to serve a two fold purpose. First, it is the quarterly report of the homogeneous reactor project for the Technical Division of Oak Ridge National Laboratory. Secondly, it is a description and general feasibility discussion of a 200-1000 K.W. pilot model, homogeneous reactor."
Date: December 28, 1949
Creator: Graham, C. B.; Secoy, C. H.; Spiewak, Irving; Taylor, E. H.; Weinberg, Alvin Martin, 1915-2006; Winters, C. E. et al.
System: The UNT Digital Library
Correlation of pressure drop data isothermal flow through standard process tube assembly (open access)

Correlation of pressure drop data isothermal flow through standard process tube assembly

The experimental data presented in HDC-1255 for the pressure drops through the various portions of a standard process tube assembly for isothermal flow are correlated in this report. Data include orifice sizes up to 0.310 inches. The equations have been adapted for the calculation of pressure drops or flow rates for clean tubes in pile operation. A systematic procedure is outlined for determining the pressure drops through each portion of the tube assembly. A method is presented for calculating the flow rate through a process tube from header pressure and panellit age readings.
Date: December 27, 1949
Creator: Sege, C. A.
System: The UNT Digital Library
Trip report: Argonne National Lab., Naval Reactor Division, December 12--13, 1949 (open access)

Trip report: Argonne National Lab., Naval Reactor Division, December 12--13, 1949

This trip was spent in conferences with H. Etherington, A. Amroni, Geo. Anderson, and L.W. Fromm; and in inspection of components now being built for the Navy Test Rig which is to be installed at H Pile. Mr. Anderson believes that the entire assembly will arrive at Hanford between January 16 and 23, 1950. Much has yet to be designed and built, however. Also, certain incompatibilities with the H Pile were pointed out, and will be altered.
Date: December 27, 1949
Creator: Lambert, J. B.
System: The UNT Digital Library
Radioactive contamination in the environs of the Hanford Works for the period January, February, March 1949 (open access)

Radioactive contamination in the environs of the Hanford Works for the period January, February, March 1949

This report summarizes in somewhat more detail than the monthly H.I. Environs reports the extent and magnitude of the radioactive contamination detected in the environs of the Hanford Works. Radioactive contamination resulting from the operation of the Hanford Works as well as that found occurring in natural quantities is included. This belated report is being issued merely for the records to serve as a composite summary of measurements already reported in the monthly H.I. Environs reports and covers the quarterly period January, February, and March, 1949.
Date: December 23, 1949
Creator: Singlevich, W. & Paas, H.J.
System: The UNT Digital Library
Ditching Investigation of a 1/18-Scale Model of the North American B-45 Airplane (open access)

Ditching Investigation of a 1/18-Scale Model of the North American B-45 Airplane

An investigation of a 1/18-scale dynamically similar model of the North American B-45 airplane was made to observe the ditching behavior and determine the proper landing technique to be used in an emergency water landing. Various conditions of damage were simulated to determine the behavior which probably would occur in a full-scale ditching. The behavior of the model was determined from high-speed motion-picture records, time-history acceleration records, and visual observations. It was concluded that the airplane should be ditched at the maximum nose-high attitude with the landing flaps full down for minimum landing speed. During the ditching, the nose-wheel and bomb-bay doors probably will be torn away and the rear of the fuselage flooded. A violent dive will very likely occur. Longitudinal decelerations of approximately 5g and vertical accelerations of approximately -6g (including gravity) will be experienced near the pilots' compartment. Ditching braces installed in the bomb bay will tend to improve the behavior slightly but will be torn away along with the bomb-bay doors. A hydroflap installed ahead of the nose-wheel doors will eliminate the dive and failure of the nose-wheel doors, and substantially reduce the motions and accelerations.
Date: December 22, 1949
Creator: Fisher, Lloyd J. & Thompson, William C.
System: The UNT Digital Library
Theoretical antisymmetric span loading for wings of arbitrary plan form at subsonic speeds (open access)

Theoretical antisymmetric span loading for wings of arbitrary plan form at subsonic speeds

A simplified lifting-surface theory that includes effects of compressibility and spanwise variation of section lift-curve slope is used to provide charts with which antisymmetric loading due to arbitrary antisymmetric angle of attack can be found for wings having symmetric plan forms with a constant spanwise sweep angle of the quarter-chord line. Consideration is given to the flexible wing in roll. Aerodynamic characteristics due to rolling, deflected ailerons, and sideslip of wings with dihedral are considered. Solutions are presented for straight-tapered wings for a range of swept plan forms.
Date: December 22, 1949
Creator: DeYoung, John
System: The UNT Digital Library
Effects of wing flexibility and variable air lift upon wing bending moment during landing impacts of a small seaplane (open access)

Effects of wing flexibility and variable air lift upon wing bending moment during landing impacts of a small seaplane

From Summary: "A smooth-water-landing investigation was conducted with a small seaplane to obtain experimental wing-bending-moment time histories together with time histories of the various parameters necessary for the prediction of wing bending moments during hydrodynamic forcing functions. The experimental results were compared with calculated results which include inertia-load effects and the effects of air-load variation during impact. The responses of the fundamental mode were calculated with the use of the measured hydrodynamic forcing functions. From these responses, the wing bending moments due to the hydrodynamic load were calculated according to the procedure given in R.M. No. 2221. The comparison of the time histories of the experimental and calculated wing bending moments showed good agreement both in phase relationship of the oscillations and in numerical values."
Date: December 21, 1949
Creator: Merten, Kenneth F. & Beck, Edgar B.
System: The UNT Digital Library
The Densities of Tributyl Phosphate - Carbon Tetrachloride Solutions Containing Uranium and Nitric Acid (open access)

The Densities of Tributyl Phosphate - Carbon Tetrachloride Solutions Containing Uranium and Nitric Acid

The following report provides the analysis of a large number of unreported data--taken during a study described in report HW-15230--containing density values obtained for solutions of uranium and nitric acid in tributyl phosphate-carbon tetrachloride solutions.
Date: December 20, 1949
Creator: Moore, Robert Lee
System: The UNT Digital Library
Flight Test of the Aerojet 7KS-6000 T-27 Jato Rocket Motor (open access)

Flight Test of the Aerojet 7KS-6000 T-27 Jato Rocket Motor

"A flight test of the Aero jet Engineering Corporation's 7KS-6000 T-27 Jato rocket motor was conducted at the Langley Pilotless Aircraft Research Station at Wallops Island, Va, to determine the flight performance characteristics of the motor. The flight test imposed an absolute longitudinal acceleration of 9.8 g upon the rocket motor at 2.8 seconds after launching. The total impulse developed by the motor was 43,400 pound-seconds, and the thrusting time was 7.58 seconds" (p. 1).
Date: December 20, 1949
Creator: Bond, Aleck C. & Thibodaux, Joseph G., Jr.
System: The UNT Digital Library
A Free-Flight Technique for Measuring Damping in Roll by Use of Rocket-Powered Models and Some Initial Results for Rectangular Wings (open access)

A Free-Flight Technique for Measuring Damping in Roll by Use of Rocket-Powered Models and Some Initial Results for Rectangular Wings

Report presenting a simplified method for obtaining free-flight measurements of damping in roll through the use of rocket-powered models. Initial configurations have been tested for a range of Mach numbers. Results regarding the rolling velocity with two different airfoil sections and damping-in-roll coefficient are provided.
Date: December 20, 1949
Creator: Edmondson, James L. & Sanders, E. Claude, Jr.
System: The UNT Digital Library
Level and Leak Indicators (open access)

Level and Leak Indicators

The following report provides results taken from a sodium level indicator developed at Sacandaga using electrical resistance as the principle.
Date: December 20, 1949
Creator: Vandenberg, L. B.
System: The UNT Digital Library
Refrigeration System Used in Mercury Isotope Collections (open access)

Refrigeration System Used in Mercury Isotope Collections

From introduction: During 1948, the Isotope Research and Production Division undertook to obtain small quantities of nearly pure mercury isotopes by electromagnetic isotope separation. The possible use of a mercury isotope of even-numbered mass to establish an international standard of length required an isotopic purity greater than 99 per cent. It, became apparent that this degree of separation could only be achieved by preventing random diffusion of un-ionized mercury which otherwise would contaminate the isotope collectors.
Date: December 19, 1949
Creator: Duncan, F. R. & Cobb, W. G.
System: The UNT Digital Library
Spontaneous Fission of 48 (open access)

Spontaneous Fission of 48

Report discussing an experiment to reinvestigate the spontaneous fission of 48 (Pu-238) in an effort to determine a more accurate value for the spontaneous fission constant that was found in a previous experiment.
Date: December 19, 1949
Creator: Jungerman, John A.
System: The UNT Digital Library
Comparison of Effectiveness of Coordinated Turns and Level Sideslips for Correcting Lateral Displacement During Landing Approaches (open access)

Comparison of Effectiveness of Coordinated Turns and Level Sideslips for Correcting Lateral Displacement During Landing Approaches

Memorandum presenting a calculation of the amount of possible correction for coordinated turns with limited bank angle and level sideslips for a large transport airplane, the C-54D. The results indicate that for all instances from the end of the runway, coordinated turns are the more effective maneuver.
Date: December 15, 1949
Creator: Faber, Stanley
System: The UNT Digital Library
STUDIES OF THE ALUMINUM-URANIUM ALLOYING REACTION (open access)

STUDIES OF THE ALUMINUM-URANIUM ALLOYING REACTION

None
Date: December 15, 1949
Creator: Bareis, D W
System: The UNT Digital Library