Counties
11 Matching Results
Results open in a new window/tab.
Results:
1 - 11 of
11
Main Canal Progress
Caption says, "A-954 View of progress of work on Main Canal siphon and bench flume under specifications 1078, taken from about station 115. Contractor's shop and office buildings are seen to the left."
Date:
October 20, 1944
Creator:
George, P. W.
System:
The Gateway to Oklahoma History
Main Canal Excavation
Caption says, "A-952 Excavation for the Main Canal about station 170. The shovel is operating at approximately water surface elevation."
Date:
October 20, 1944
Creator:
George, P. W.
System:
The Gateway to Oklahoma History
Dam Spillway
Caption says, "A-950 View of spillway section of Altus Dam. Elevation of uncontrolled spillway is 1559 and of controlled spillway is 1537. The balance of the concrete in the controlled spillway awaits completion of the work on the C.R.I. & P. Ry. reconstruction."
Date:
October 20, 1944
Creator:
George, P. W.
System:
The Gateway to Oklahoma History
Main Canal Excavation
Caption says, "A-948 Excavation of Main Canal through heavy clay formation engulfing huge boulders. Shovel is taking first cut down to top grade of canal bank."
Date:
September 20, 1944
Creator:
George, P. W.
System:
The Gateway to Oklahoma History
Compacting Canal
Caption says, "A-946 Looking north from Station 86+00, Main Canal, showing final embankment being compacted. Note compaction of canal permieter in background."
Date:
September 20, 1944
Creator:
George, P. W.
System:
The Gateway to Oklahoma History
Highway 44 and Main Canal Bridge
Caption says, "A-953 Progress on Highway No. 44 crossing over the Main Canal. The bridge deck is complete and fabrication of guard rail and posts is in progress."
Date:
October 20, 1944
Creator:
George, P. W.
System:
The Gateway to Oklahoma History
Concrete Placing
Caption says, "A-945 Close-up view of concrete placing on controlled spillway. Dump truck has been removed and space is being filled by direct dumping from bucket."
Date:
September 20, 1944
Creator:
George, P. W.
System:
The Gateway to Oklahoma History
Highway 44 and Main Canal Bridge
Caption says, "A-949 Form work in progress on beams and deck for concrete bridge on Highway No. 44 crossing, Station 59+36, Main Canal."
Date:
September 20, 1944
Creator:
George, P. W.
System:
The Gateway to Oklahoma History
Section of Canal
Caption says, "A-947 Looking toward Station 125+60, outlet end of bench flume, in lined section of canal built through sand hills. This section was not completed at the time the photograph was taken."
Date:
September 20, 1944
Creator:
George, P. W.
System:
The Gateway to Oklahoma History
Concrete Placing
Caption says, "A-944 Method of concrete placing on controlled spillway. Concrete bucket is dumped into Ford 2 c.y. dump truck which transports and places concrete in 20-inch lift. Note completed uncontrolled spillway and piers 1, 2, and 3 on right."
Date:
September 20, 1944
Creator:
George, P. W.
System:
The Gateway to Oklahoma History
Installing Canal Pipes
Caption says, "A-951 Installing the canal outlet pipes and the bellmouth castings in Altus Dam. Excavation for the stilling basin is 95 percent complete."
Date:
October 20, 1944
Creator:
George, P. W.
System:
The Gateway to Oklahoma History