WPA Laborer Drilling

Caption says, "A-35 Altus Project. W. P. A. laborer plug drilling a large granite rock which will be broken into smaller sections to be faced for use in the construction of the Lugert Dam. A large rock in the back ground has been drilled previously."
Date: December 19, 1940
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Laborers Working in Rock Cut

Caption says, "A-514 Laborers at work in rock cut, Station 62-50 on Santa Fe Railroad relocation."
Date: December 19, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Lima Shovel on Haul Road

Caption says, "A-511 Lima shovel on Haul road, Station 69, on Santa Fe Railroad relocation."
Date: December 19, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Rock Cut in Santa Fe Railroad Relocation

Caption says, "A-515 Looking east from Station 61-50, in rock cut on Santa Fe Railroad relocation."
Date: December 19, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Stakes set for Rock Drilling

Caption says, "A-512 Stakes set for rock drilling at Station 66-50, on Santa Fe relocation."
Date: December 19, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Air Entrained Concrete Markings

Caption says, "5-AL-465. Specifications No. 1179. Completed siphon transition showing air entrained concrete markings. Station 530+50, West Canal."
Date: December 19, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

Concrete Placing Operations

Caption says, "5-AL-464. Specifications No. 1133. Concrete placing operations for bridge deck. Station 486+88, Altus Canal."
Date: December 19, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

Inlet Transition

Caption says, "5-AL-462. Specifications No. 1180. Inlet transition of siphon under railroad showing finished wing walls. Altus 9.9 lateral. Station 216+21."
Date: December 19, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

Method for Mixing Concrete

Caption says, "5-AL-463. Specifications No. 1133. Method used to heat concrete mixer in cold weather to maintain proper temperature of concrete used for bridge deck. Station 486+88, Altus Canal."
Date: December 19, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

State Highway 9

Caption says, "5-AL-846. Specifications No. 1510. View of State Highway No. 9 bridge over reservior after contract for raising it above high water elevation had been completed."
Date: December 19, 1947
Creator: George, P. W.
System: The Gateway to Oklahoma History

Timber Farm Bridge

Caption says, "5-AL-847. Specifications No. 1426. View of short section of completed Drain "C", taken looking upstream from near Station 194. Timber farm bridge is at Station 200."
Date: December 19, 1947
Creator: George, P. W.
System: The Gateway to Oklahoma History

Byrd Mountain

Caption says, "5-AL-1331. View of heavy compacted earth lining in Main Canal at point of Byrd Mountain, looking downstream from approximately Station 171. Compacted earth is about 4.5 feet thick, with no gravel blanketing. Rock has been dumped along bank to use in ripraping to counteract erosion of bank by wave action."
Date: December 19, 1950
Creator: George, P. W.
System: The Gateway to Oklahoma History