1000 Gallon Water Tank
Caption says, "5-AL-849. Specifications No. 1811. View of 1000 gallon water tank equipped with Aeoril water heater and circulating pump. This is being utilized by Stigler Construction Company to heat mixing water."
Date:
December 22, 1947
Creator:
Vaughan, R. O.
System:
The Gateway to Oklahoma History
Air Entrained Concrete Markings
Caption says, "5-AL-465. Specifications No. 1179. Completed siphon transition showing air entrained concrete markings. Station 530+50, West Canal."
Date:
December 19, 1946
Creator:
Reynolds, R. M.
System:
The Gateway to Oklahoma History
Altus Canal
Caption says, "5-AL-839. Specifications No. 1374. View of city lake turnout, parshall flume and inlet to 30" siphon, Station 757+70, Altus Canal."
Date:
December 5, 1947
Creator:
George, P. W.
System:
The Gateway to Oklahoma History
Altus Canal
Caption says, "5-AL-458. Specification No. 1374. View of the Altus Canal, looking downstream from Station 926+50."
Date:
December 4, 1945
Creator:
Parker, D. B.
System:
The Gateway to Oklahoma History
Blasting in Rock Cut
Caption says, "A-521 Blast in rock cut, vicinity of Station 64, Santa Fe Railroad relocation, from side of hill south of rock cut. 5000 pounds of powder were used to load 198 holes of an average depth of from 16 feet to 20 feet."
Date:
December 29, 1941
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Byrd Mountain
Caption says, "5-AL-1331. View of heavy compacted earth lining in Main Canal at point of Byrd Mountain, looking downstream from approximately Station 171. Compacted earth is about 4.5 feet thick, with no gravel blanketing. Rock has been dumped along bank to use in ripraping to counteract erosion of bank by wave action."
Date:
December 19, 1950
Creator:
George, P. W.
System:
The Gateway to Oklahoma History
Canal Construction
Caption says, "A-967 Construction of canal outletworks at Altus Dam. Outlet pipes and high pressure gates are embedded in concrete to El. 1522."
Date:
December 20, 1944
Creator:
George, P. W.
System:
The Gateway to Oklahoma History
Carryall Units
Caption says, "A-495 Carryall units in borrow area north of Station No. 587 on Rock Island Railroad relocation."
Date:
December 4, 1941
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Charging Transit Mixer
Caption says, "5-AL-445. Specification No. 1180. Charging transit mixer with cement at the batching plant, Blair, Oklahoma."
Date:
December 4, 1946
Creator:
Parker, D. B.
System:
The Gateway to Oklahoma History
Charging Transit Mixer
Caption says, "5-AL-444. Specification No. 1180. Charging transit mixer with aggregate at the batching plant, Blair, Oklahoma."
Date:
December 4, 1946
Creator:
Parker, D. B.
System:
The Gateway to Oklahoma History
Charging Transit Mixer
Caption says, "5-AL-446. Specification No. 1180. Charging transit mixer with cement at the batching plant, Blair, Oklahoma."
Date:
December 4, 1946
Creator:
Parker, D. B.
System:
The Gateway to Oklahoma History
Charging Transit Mixer
Caption says, "5-AL-443. Specification No. 1180. Charging transit mixer with aggregate at the batching plant, Blair, Oklahoma."
Date:
December 4, 1946
Creator:
Parker, D. B.
System:
The Gateway to Oklahoma History
Compacted Banks of Main Canal
Caption says, "A-972 View of partially completed compacted-earth lining in Main Canal, looking upstream from Station 183+50."
Date:
December 20, 1944
Creator:
George, P. W.
System:
The Gateway to Oklahoma History
Completed Lateral
Caption says, "5-AL-439. Specification No. 1182. View of completed West 10.6 lateral, looking downstream from Station 0+00."
Date:
December 4, 1946
Creator:
Parker, D. B.
System:
The Gateway to Oklahoma History
Completed Lateral Station
Caption says, "5-AL-851. Specifications No. 1811. View of a completed lateral at Station 55-26 on Altus 17.9 lateral."
Date:
December 22, 1947
Creator:
Vaughan, R. O.
System:
The Gateway to Oklahoma History
Completed mixing plants
Wooden buildings which make up the completed mixing and batching cement plants for the Altus Dam project. Caption says, "A-793 View of completed mixing and batching plants. Two steel bins at left are for aggregates and bin on right for pumicite. The 135 ft. conveyor connecting the batching and mixing plant has been covered to protect the cement and pumicite both of which will be batched on the belt at the batching plant. A portion of the aggregate stockpiles is shown in the foreground."
Date:
December 23, 1942
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Completed mixing plants
Wooden structures where the cement is mixed for the Altus dam project. Caption says, "A-794 View of completed batching plant with mixing plant in right background."
Date:
December 23, 1942
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Completion Check
Caption says, "5-AL-472. Specification No. 1374. Completed check except for guard rail, Altus Canal, Station 789+50. This is the first structure completed under Specification No. 1374."
Date:
December 20, 1946
Creator:
Reynolds, R. M.
System:
The Gateway to Oklahoma History
Concrete Culvert
Caption says, "A-508 Culvert on Highway 44 relocation, Station 44. Outlet end of culvert."
Date:
December 9, 1941
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Concrete Culvert
Caption says, "A-507 Telephoto of reinforced 5' x 4' concrete culvert, at Station 45-45, on Santa Fe Railroad relocation. Upstream end."
Date:
December 9, 1941
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Concrete Placing
Caption says, "5-AL-457. Specification 1374. General view showing concrete placing operation on partially completed check at Station 789+50, Altus Canal."
Date:
December 5, 1946
Creator:
Parker, D. B.
System:
The Gateway to Oklahoma History
Concrete Placing
Caption says, "5-AL-840. Specifications No. 1811. View of 18" turnout, lt., Station 10-00 on Ozark 1.5 lateral, after completion of concrete placing."
Date:
December 5, 1947
Creator:
George, P. W.
System:
The Gateway to Oklahoma History
Concrete Placing Operations
Caption says, "5-AL-437. Specification No. 1179. General view showing concrete placing operations in highway siphon barrel at Station 558+69, West Canal."
Date:
December 4, 1946
Creator:
Parker, D. B.
System:
The Gateway to Oklahoma History
Concrete Placing Operations
Caption says, "5-AL-456. Specification No. 1374. General view showing concrete placing operations on partially completed check at Station 789+50, Altus Canal. Portable batching and mixing equipment in background."
Date:
December 5, 1946
Creator:
Parker, D. B.
System:
The Gateway to Oklahoma History