Condensate System. Section II. Fifth Core I, Seed 1. Test Results DL-S-105 (open access)

Condensate System. Section II. Fifth Core I, Seed 1. Test Results DL-S-105

The purpose of the test was to fill the condensate storage tank and the Condensate System and obtain satisfactory preliminary operation. The components of the Condensate System performed adequately and satisfactorily with the exception of fill control valve (M9-VI). This valve (M9-VI) is not used in the current operation procedure.
Date: December 8, 1959
Creator: unknown
System: The UNT Digital Library
An Investigation of Scaling of Zirconium at Elevated Temperatures : Quarterly Status Report No. 10; Sept. 2, 1955 to Dec. 2, 1955 (open access)

An Investigation of Scaling of Zirconium at Elevated Temperatures : Quarterly Status Report No. 10; Sept. 2, 1955 to Dec. 2, 1955

As previously reported, zirconium undergoes large dimensional increases after scaling in air in a critical temperature range, 700 degree-1050 degree C. This finding was observed with specimens of a constant thickness (0;062 in.) To study the thickness effect, a number of specimens ranging in thickness from 0.020 to 0.200 in. were scaled in air at a temperature (900 degree C) where the growth is a maximum for a given time. Both cold rolled iodine sheet and forged iodide bar stock were used. to determine the effect of orientation, specimens from the forged bar were obtained such that the scaling surface was either parallel to or perpendicular to the long axis of the bar.
Date: December 8, 1955
Creator: Barrett, Charles A.; Evans, E. B. & Baldwin, W. M., Jr.
System: The UNT Digital Library
Nuclear Instrumentation Operation During Plant Operation. Section I. First Performance. Core I, Seed 1. Test Results DL-S-309, RNI-41 (open access)

Nuclear Instrumentation Operation During Plant Operation. Section I. First Performance. Core I, Seed 1. Test Results DL-S-309, RNI-41

The purpose of the test was to evaluate the operation of the Nuclear Instrumentation Power Range Amplifier during start up. While the station was operating at a gross load of 16.5 megawatts, a variation of 0, 8.5, 2.7 and 4.4 existed between the compensated ion chamber currents (CIC) and the test currents for channels A, B, C and D respectively. The off site modifications to channel C power range amplifier did not cause the ion chamber current and test current to be the same at 16.5 megawatts gross power. The modifications to channel C were made to correct for this deficiency.
Date: December 8, 1959
Creator: unknown
System: The UNT Digital Library
Study of Factors Influencing Ductility of Iron-Aluminum Alloys. Monthly Letter Report No. 8, 15 March 1959 to 15 March 1960 (open access)

Study of Factors Influencing Ductility of Iron-Aluminum Alloys. Monthly Letter Report No. 8, 15 March 1959 to 15 March 1960

Studies are being made on the effects of variation of aluminum content, heat treatment, surface preparation, and other metallurgical factors on the room temperature ductility of Al-- Fe alloys. It is estimated that approximately 65 percent of the proposed research has been completed over the first eight and one-half months of the contract period.
Date: December 8, 1959
Creator: Perkins, Frank C. & Nachman, J. F. (Joseph F.)
System: The UNT Digital Library