Mitigation and Monitoring Plan for Impacted Wetlands at the Gunnison Umtra Project Site, Gunnison, Colorado. Revision 1 (open access)

Mitigation and Monitoring Plan for Impacted Wetlands at the Gunnison Umtra Project Site, Gunnison, Colorado. Revision 1

The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site`s contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. The 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b).
Date: December 1994
Creator: unknown
System: The UNT Digital Library