Collection
Serial/Series Title
Month
1 Matching Results
Results open in a new window/tab.
Results:
1 - 1 of
1
Design Study Report for TARGET: A 1000-Mw(e) High-Temperature Gas-Cooled Reactor
Introduction: The scope of work for the contract stated that General Atomic was to undertake a preliminary design study and related exploratory development program for a 1000-Mw(e), advanced, gas-cooled reactor.
Date:
November 1964
Creator:
General Dynamics Corporation. General Atomic Division. John Jay Hopkins Laboratory for Pure and Applied Science
System:
The UNT Digital Library