Advanced Reservoir Characterization in the Antelope Shale to Establish the Viability of C02 Enhanced Oil Recovery in California's Monterey Formation Siliceous Shales (open access)

Advanced Reservoir Characterization in the Antelope Shale to Establish the Viability of C02 Enhanced Oil Recovery in California's Monterey Formation Siliceous Shales

The primary objective of this research is to conduct advanced reservoir characterization and modeling studies in the Antelope Shale reservoir. Characterization studies will be used to determine the technical feasibility of implementing a CO2 enhanced oil recovery project in the Antelope Shale in Buena Vista Hills Field. The Buena Vista Hills pilot CO2 project will demonstrate the economic viability and widespread applicability of CO2 flooding in fractured siliceous shale reservoirs of the San Joaquin Valley. The research consists of four primary work processes: Reservoir Matrix and Fluid Characterization; Fracture Characterization; Reservoir Modeling and Simulation; and CO2 Pilot Flood and Evaluation. Work done in these areas is subdivided into two phases or budget periods. The first phase of the project will focus on the application of a variety of advanced reservoir characterization techniques to determine the production characteristics of the Antelope Shale reservoir. Reservoir models based on the results of the characterization work will be used to evaluate how the reservoir will respond to secondary recovery and EOR processes. The second phase of the project will include the implementation and evaluation of an advanced enhanced oil recovery (EOR) pilot in the United Anticline (West Dome) of the Buena Vista Hills Field.
Date: October 24, 1997
Creator: Morea, Michael F.
System: The UNT Digital Library
Antiproton fast ignition for Inertial Confinement Fusion (open access)

Antiproton fast ignition for Inertial Confinement Fusion

With 180MJ/{micro}g, antiprotons offer the highest stored energy per unit mass of any known entity. We investigate the use of antiprotons to promote fast ignition in an ICF capsule and seek high gains with only modest compression of the main fuel. Unlike standard fast ignition where the ignition energy is supplied by an energetic, short pulse laser, the energy here is supplied through the ionization energy deposited when antiprotons annihilate at the center of a compressed fuel capsule. In the first of two candidate fast ignition schemes, the antiproton package is delivered by a low energy external ion beam. In the second, ''autocatalytic'' scheme, the antiprotons are pre-emplaced at the center of the capsule prior to compression. In both schemes, we estimate that {approximately}3x10{sup 13} antiprotons are required to initiate fast ignition in a typical ICF capsule and show that incorporation of a thin, heavy metal shell is desirable to enhance energy deposition in the igniter zone. In addition to obviating the need for a second energetic fast laser and vulnerable final optics, this scheme would achieve central without reliance on laser channeling through halo plasma or houlrahm debris. However, in addition to the unknowns involved in the storage and …
Date: October 24, 1997
Creator: Perkins, L.J.
System: The UNT Digital Library
Audit of environmental monitoring and health physics laboratories at the Savannah River Site (open access)

Audit of environmental monitoring and health physics laboratories at the Savannah River Site

The Environmental Monitoring and Health Physics Laboratories at the Department of Energy`s (Department) Savannah River Site are over 40 years old and are approaching the end of their useful lives. The managing and operating contractor, Westinghouse Savannah River Company (Westinghouse), and the Savannah River Operations Office (Operations Office) proposed to build two new facilities to replace them. We conducted this audit to determine whether the construction of new laboratories was the most cost-effective alternative to accomplish the site`s environmental monitoring and health physics missions.
Date: October 24, 1997
Creator: unknown
System: The UNT Digital Library
Biological Monitoring Program for East Fork Poplar Creek (open access)

Biological Monitoring Program for East Fork Poplar Creek

In May 1985, a National Pollutant Discharge Elimination System (NPDES) permit was issued for the Oak Ridge Y-12 Plant. As a condition of the permit a Biological Monitoring and Abatement Program (BMAP) was developed to demonstrate that the effluent limitations established for the Y- 12 Plant protect the classified uses of the receiving stream (East Fork Poplar Creek; EFPC), in particular, the growth and propagation of aquatic life (Lear et al. 1989). A second objective of the BMAP is to document the ecological effects resulting from the implementation of a water pollution control program designed to eliminate direct discharges of wastewaters to EFPC and to minimize the inadvertent release of pollutants to the environment. Because of the complex nature of the discharges to EFPC and the temporal and spatial variability in the composition of the discharges, a comprehensive, integrated approach to biological monitoring was developed. A new permit was issued to the Y-12 Plant on April 28, 1995 and became effective on July 1, 1995. Biological monitoring continues to be required under the new permit. The BMAP consists of four major tasks that reflect different but complementary approaches to evaluating the effects of the Y-12 Plant discharges on the aquatic …
Date: October 24, 1997
Creator: Adams, S. M.; Ashwood, T. L.; Beaty, T. W. & Brandt, C. C.
System: The UNT Digital Library
Development of an analysis capability for the National Transportation System (open access)

Development of an analysis capability for the National Transportation System

The purpose of this report is to examine the Department of Transportation`s (DOT) National Transportation System (NTS) initiative, to document what has been learned, and to outline a National Transportation Network Analysis Capability (NTNAC) based on a ``TRANSIMS-like`` approach. This study was conducted over a two month period at the end of FY1997. The scope of the effort was carefully defined to accommodate the short time horizon and to provide focus to a very large analytical problem. The objectives were to: (1) define the NTS and the NTS problem; (2) identify problem characteristics; (3) describe an analytical solution based on the TRANSIMS approach; (4) identify data requirements and availability; (5) develop criteria for a scenario to be used in a prototype demonstration; and (6) select a scenario for the prototype demonstration.
Date: October 24, 1997
Creator: Anson, D. & Nelson, R.
System: The UNT Digital Library
The in-situ decontamination of sand and gravel aquifers by chemically enhanced solubilization of multiple-compound DNAPLs with surfactant solutions: Phase 1 -- Laboratory and pilot field-scale testing and Phase 2 -- Solubilization test and partitioning and interwell tracer tests. Final report (open access)

The in-situ decontamination of sand and gravel aquifers by chemically enhanced solubilization of multiple-compound DNAPLs with surfactant solutions: Phase 1 -- Laboratory and pilot field-scale testing and Phase 2 -- Solubilization test and partitioning and interwell tracer tests. Final report

Laboratory, numerical simulation, and field studies have been conducted to assess the potential use of micellar-surfactant solutions to solubilize chlorinated solvents contaminating sand and gravel aquifers. Ninety-nine surfactants were screened for their ability to solubilize trichloroethene (TCE), perchloroethylene (PCE), and carbon tetrachloride (CTET). The field test was conducted in the alluvial aquifer which is located 20 to 30 meters beneath a vapor degreasing operation at Paducah Gaseous Diffusion Plant. This aquifer has become contaminated with TCE due to leakage of perhaps 40,000 liters of TCE, which has generated a plume of dissolved TCE extending throughout an area of approximately 3 km{sup 2} in the aquifer. Most of the TCE is believed to be present in the overlying lacustrine deposits and in the aquifer itself as a dense, non-aqueous phase liquid, or DNAPL. The objective of the field test was to assess the efficacy of the surfactant for in situ TCE solubilization. Although the test demonstrated that sorbitan monooleate was unsuitable as a solubilizer in this aquifer, the single-well test was demonstrated to be a viable method for the in situ testing of surfactants or cosolvents prior to proceeding to full-scale remediation.
Date: October 24, 1997
Creator: unknown
System: The UNT Digital Library
Radio Free Asia (open access)

Radio Free Asia

None
Date: October 24, 1997
Creator: unknown
System: The UNT Digital Library
Radio Free Asia (open access)

Radio Free Asia

None
Date: October 24, 1997
Creator: Epstein, Susan B.
System: The UNT Digital Library
Rapid analysis of hay attributes using NIRS. Final report, Task II alfalfa supply system (open access)

Rapid analysis of hay attributes using NIRS. Final report, Task II alfalfa supply system

This final report provides technical information on the development of a near infrared reflectance spectroscopy (NIRS) system for the analysis of alfalfa hay. The purpose of the system is to provide consistent quality for processing alfalfa stems for fuel and alfalfa leaf meal products for livestock feed. Project tasks were to: (1) develop an NIRS driven analytical system for analysis of alfalfa hay and processed alfalfa products; (2) assist in hiring a qualified NIRS technician and recommend changes in testing equipment necessary to provide accurate analysis; (3) calibrate the NIRS instrument for accurate analyses; and (4) develop prototype equipment and sampling procedures as a first step towards development of a totally automated sampling system that would rapidly sample and record incoming feedstock and outbound product. An accurate hay testing program was developed, along with calibration equations for analyzing alfalfa hay and sun-cured alfalfa pellets. A preliminary leaf steam calibration protocol was also developed. 7 refs., 11 figs., 10 tabs.
Date: October 24, 1997
Creator: unknown
System: The UNT Digital Library
Safety evaluation for packaging (onsite) SERF cask (open access)

Safety evaluation for packaging (onsite) SERF cask

This safety evaluation for packaging (SEP) documents the ability of the Special Environmental Radiometallurgy Facility (SERF) Cask to meet the requirements of WHC-CM-2-14, Hazardous Material Packaging and Shipping, for transfer of Type B quantities (up to highway route controlled quantities) of radioactive material within the 300 Area of the Hanford Site. This document shall be used to ensure that loading, tie down, transport, and unloading of the SERF Cask are performed in accordance with WHC-CM-2-14. This SEP is valid until October 1, 1999. After this date, an update or upgrade to this document is required.
Date: October 24, 1997
Creator: Edwards, W. S.
System: The UNT Digital Library
Tank 241-AP-105, cores 208, 209 and 210, analytical results for the final report (open access)

Tank 241-AP-105, cores 208, 209 and 210, analytical results for the final report

This document is the final laboratory report for Tank 241-AP-105. Push mode core segments were removed from Risers 24 and 28 between July 2, 1997, and July 14, 1997. Segments were received and extruded at 222-S Laboratory. Analyses were performed in accordance with Tank 241-AP-105 Push Mode Core Sampling and Analysis Plan (TSAP) (Hu, 1997) and Tank Safety Screening Data Quality Objective (DQO) (Dukelow, et al., 1995). None of the subsamples submitted for total alpha activity (AT), differential scanning calorimetry (DSC) analysis, or total organic carbon (TOC) analysis exceeded the notification limits as stated in TSAP and DQO. The statistical results of the 95% confidence interval on the mean calculations are provided by the Tank Waste Remediation Systems Technical Basis Group, and are not considered in this report. Appearance and Sample Handling Two cores, each consisting of four segments, were expected from Tank 241-AP-105. Three cores were sampled, and complete cores were not obtained. TSAP states core samples should be transported to the laboratory within three calendar days from the time each segment is removed from the tank. This requirement was not met for all cores. Attachment 1 illustrates subsamples generated in the laboratory for analysis and identifies their sources. …
Date: October 24, 1997
Creator: Nuzum, J. L.
System: The UNT Digital Library
Debris growth sensitivity to launch and cascade rates (open access)

Debris growth sensitivity to launch and cascade rates

Two-component models provide a good description of debris growth from the outset of launch to the present, predictions of future trends, and assessments of their sensitivity. Launch rate reductions produce less than proportional reductions in debris, for reasons that are discussed. The shift of debris to higher altitudes is assessed quantitatively, although the details of the growth are discussed elsewhere.
Date: October 24, 1996
Creator: Canavan, G. H.
System: The UNT Digital Library
Fiber-Optic Sensing Technology (open access)

Fiber-Optic Sensing Technology

This article offers a basic review of fiber-optic sensing technology, or more specifically, fiber-optic sensing technology as applied to the qualitative or quantitative identification of a chemical sample, and how it works,
Date: October 24, 1996
Creator: Milnes, M.; Baylor, L.C. & Bave, S.
System: The UNT Digital Library
Initial single-shell tank retrieval system tank selection (open access)

Initial single-shell tank retrieval system tank selection

The Hanford Federal Facility Agreement and Consent Order (also known as the Tri-Party Agreement), established several milestones associated with the Initial Single-Shell Tank Retrieval System (ISSTRS). It also established that the scope of ISSTRS is the retrieval of a complete tank farm or an equivalent number of tanks. This study selected the single- shell tanks to be included in the ISSTRS work scope. This study determined that the ISSTRS work scope should consist of four tanks located in the A, AX, and C, tank farms. One of the tanks (Tank 241-AX-103) will be a salt cake retrieval demonstration tank. The other three (Tanks 241 -A-1 02, 241 -C-1 03, and 241-C-105) are 100-series tanks containing high interim storage risk, high long-term hazard waste and are assumed not to be leaking.
Date: October 24, 1996
Creator: Grenard, C.E.
System: The UNT Digital Library
National Ignition Facility subsystem design requirements laser auxiliary subsystem SSDR 1.3.5 (open access)

National Ignition Facility subsystem design requirements laser auxiliary subsystem SSDR 1.3.5

This system design requirement document establishes the performance, design, development and test requirements for the NIF Laser Auxiliary Systems. The Laser Auxiliary Systems consist of: a. Gas Cooling System; b. Low conductivity cooling water system; C. Deionized cooling water system; d. Electrical power distribution system. The gas cooling system will be used for cooling the main laser amplifier flashlamps and some smaller quantities will be used for purging Pockels cells and for diode pumps in preamplifier. The low conductivity cooling water system will be used for cooling the capacitor banks. The deionized cooling water system will be used to cool the multi-pass amplifier in the OPG PAM. Electrical power will be required for the OPG systems, Pockels cells, power conditioning, and amplifier support equipment.
Date: October 24, 1996
Creator: Mukherji, S.
System: The UNT Digital Library
National Ignition Facility subsystem design requirements target positioning subsystem SSDR 1.8.2 (open access)

National Ignition Facility subsystem design requirements target positioning subsystem SSDR 1.8.2

This Subsystem Design Requirement document is a development specification that establishes the performance, design, development and test requirements for the target positioner subsystem (WBS 1.8.2) of the NIF Target Experimental System (WBS 1.8).
Date: October 24, 1996
Creator: Pittenger, L.
System: The UNT Digital Library
Statement of basis/proposed plan for the Central Shops Burning/Rubble Pit (631-6G). Revision 1, Final (open access)

Statement of basis/proposed plan for the Central Shops Burning/Rubble Pit (631-6G). Revision 1, Final

The purpose of this plan is to describe the preferred alternative for addressing the Central Shops Burning/Rubble Pit 631-6G (BRP6G) located at SRS, in northwestern Barnwell County, South Carolina and to provide an opportunity for public input into the remedial action selection process. Arsenic, beryllium, iron, and octachloro-dibenzo-p-dioxin isomers (OCDD) concentrations in the pit soil are at levels consistent with those found in the background. Therefore, the only contamination attributable to actions in BRP6G is PCB-1254. After the risk contributions of these chemicals are eliminated, the only remaining risk attributable to the pit soil is from PCB-1254 (about 2 {times} 10{sup {minus}6} via ingestion of vegetables grown on-site). The maximum concentration of PCB-1254 detected in the pit was 0.115 mg/kg, approximately 10% of the residential action level for PCBs of 1 mg/kg. Based on the results of the remedial investigation and the BRA, it is proposed that No Action be performed for the BRP6G. Considering the low levels of residual contamination present principally below 1.2 meters (4 feet) within the pit and the associated risks (about 2 {times} 10{sup {minus}6}) within the lower level of EPA`s target risk range, action is not warranted for this unit.
Date: October 24, 1996
Creator: Palmer, E.
System: The UNT Digital Library
U.C. Berkeley Nuclear Engineering curriculum and research enhancement. Final report for award DE-FG03-94ER-76010 and progress report for award DE-FG03-95NE-38105, February 15, 1993--September 29, 1996 (open access)

U.C. Berkeley Nuclear Engineering curriculum and research enhancement. Final report for award DE-FG03-94ER-76010 and progress report for award DE-FG03-95NE-38105, February 15, 1993--September 29, 1996

This report discusses the progress achieved during the multi-year program for curriculum and research enhancement for the Department of Nuclear Engineering at the University of California, Berkeley. Due to its declining utility for research, six years ago the department decommissioned the TRIGA research reactor, to make the space available for an accelerator-driven rotating target neutron source for fusion studies. The DOE has traditionally supported these university reactors, in part because they provide a vital educational experience for undergraduate students in reactor operations. Thus in 1993 the department was determined to use its DOE award to replace the undergraduate education that the research reactor formerly provided with an equal or superior educational experience. As this progress report indicates, they can now make a compelling argument that the effort has been successful. Students now have the opportunity to spend a full week at the Diablo Canyon Nuclear Power Plant, after spending two weeks full time at Berkeley studying plant operations. The students spend a full day operating the plant using the full-scale simulator, spend a day each individually and in small groups with operations and engineering personnel, and by the end of the week are intimately familiar with the basics of nuclear …
Date: October 24, 1996
Creator: Kastenberg, W. & Peterson, P.F.
System: The UNT Digital Library
90-Day safety screen results and final report for tank 241-B-104 push-mode, cores 88 and 89. Revision 1 (open access)

90-Day safety screen results and final report for tank 241-B-104 push-mode, cores 88 and 89. Revision 1

This document reports the final screen results for tank 241-B-104 Push Mode, Cores 88 and 89
Date: October 24, 1995
Creator: Jo, J.
System: The UNT Digital Library
Documentation of the Oil and Gas Supply Module (OGSM) (open access)

Documentation of the Oil and Gas Supply Module (OGSM)

The purpose of this report is to define the objectives of the Oil and Gas Supply Model (OGSM), to describe the model`s basic approach, and to provide detail on how the model works. This report is intended as a reference document for model analysts, users, and the public. It is prepared in accordance with the Energy Information Administration`s (EIA) legal obligation to provide adequate documentation in support of its statistical and forecast reports (Public Law 93-275, Section 57(b)(2)). Projected production estimates of U.S. crude oil and natural gas are based on supply functions generated endogenously within National Energy Modeling System (NEMS) by the OGSM. OGSM encompasses domestic crude oil and natural gas supply by both conventional and nonconventional recovery techniques. Nonconventional recovery includes enhanced oil recovery (EOR), and unconventional gas recovery (UGR) from tight gas formations, Devonian shale and coalbeds. Crude oil and natural gas projections are further disaggregated by geographic region. OGSM projects U.S. domestic oil and gas supply for six Lower 48 onshore regions, three offshore regions, and Alaska. The general methodology relies on forecasted drilling expenditures and average drilling costs to determine exploratory and developmental drilling levels for each region and fuel type. These projected drilling levels …
Date: October 24, 1995
Creator: unknown
System: The UNT Digital Library
GPHS-RTGs in support of the Cassini Mission. Semi-annual technical progress report, April 3, 1995--October 1, 1995 (open access)

GPHS-RTGs in support of the Cassini Mission. Semi-annual technical progress report, April 3, 1995--October 1, 1995

This document is the April-October 1995 Progress Report on the Cassini RTG Program. Nine tasks are summarized; (1) Spacecraft integration and liason, (2) Engineering support, (3) Safety, (4) Unicouple fabrication, (5) ETG fabrication, assembly, and test, (6) Ground support equipment, (7) RTG shipping and launch support, (8) Design, reviews, and mission applications, and (9) Project management, QA, contract changes, and material acquisitions.
Date: October 24, 1995
Creator: unknown
System: The UNT Digital Library
Isobutanol-methanol mixtures from synthesis gas. Quarterly technical progress report, July 1--September 30, 1995 (open access)

Isobutanol-methanol mixtures from synthesis gas. Quarterly technical progress report, July 1--September 30, 1995

Mechanistic and kinetic studies of methanol and ethanol coupling reactions on Cs/Cu/ZnO and Cu/ZnO/MnO catalysts using isotopically-labeled compounds have confirmed that coupling reactions proceed via intermediate dehydrogenation of alcohols to aldehydes. Ethanol coupling reactions are much faster than those of methanol because ethanol forms a more thermodynamically favored intermediate (acetaldehyde), with aldol condensation pathways kinetically available for chain growth. Cs decreases the rate of formation of aldehydes in alcohol dehydrogenation reaction and inhibits the undesired conversion of methanol and ethanol to synthesis gas (CO/H{sub 2}). Construction and start-up of the Catalytic Microreactor Unit (CMRU) for high pressure isobutanol synthesis studies have been completed. Initial certification runs have reproduced catalytic CO conversion rates on a standard APCI material (Cs/Cu/ZnO/Al{sub 2}O{sub 3}). Condensation of higher alcohols in the transfer lines appears to be responsible for the observed low apparent selectivity to higher alcohols. The design and construction of the Temperature-Programmed Surface Reaction (TPSR) Unit for the study of the adsorption and reaction properties of alcohols and other oxygenates on isobutanol, synthesis catalysts and components is complete. The reduction of CuO powder and of a Cs/Cu/ZnO catalyst were used to certify the apparatus before proceeding with alcohol adsorption and reaction studies.
Date: October 24, 1995
Creator: Eglesia, E.
System: The UNT Digital Library
Preliminary safety analysis report for project 89-GEB-610 Plutonium Finishing Plant instrumentation upgrade. Revision 1 (open access)

Preliminary safety analysis report for project 89-GEB-610 Plutonium Finishing Plant instrumentation upgrade. Revision 1

This document consists of an analysis of the MICON system upgrade. This project shall install a Micon Co. distributed process monitor and control system with Sparc Sun workstation operator interfaces. The Sparc workstations are housed in consoles custom designed to human factors specifications. The distributed control system (DCS) shall have the installed capacity to monitor and control all related instruments and equipment presently connected to the panels in the PFP Power Control Room 321A as listed in the input/output list. This also includes all devices monitored and controlled by the 2736-ZB Allen Bradley programmable logic controller. The system has since assumed the control and monitoring responsibilities for Projects B- 680H ``Low Level Waste Treatment Facility`` and C-031H ``PFP Liquid Effluent Facilities``. Part of the new en`s change area in Building 234-5ZA, Room 712, has been remodeled to house two consoles and one supervisor console. Local control units containing the microprocontrollers and the input/output interface circuit boards shall be wired to the instrumentation and controlled equipment. These units communicate with the Sparc workstations via a redundant data communications highway and shall be strategic, throughout the PFP facility. The DCS has already been purchased from Micon Co., located in Houston Texas, presently …
Date: October 24, 1995
Creator: Huber, T. E.
System: The UNT Digital Library
Program status 4. quarter -- FY 1995: ITER and technology (open access)

Program status 4. quarter -- FY 1995: ITER and technology

A scoping level analysis of heat exhaust for the DEMO divertor strawman design was performed. It was concluded that to reduce the surface heat flux to the divertor, a combination of impurities radiation, compression, and increase in SOL electron density will have to be used. GA completed the preparation on the description of the helium-cooled, lithium breeder and V-alloy/ferritic steel DEMO blanket design focusing on addressing the issues of materials compatibility and reliability of high pressure gas system. Using ferritic steel, a helium Li-breeder design can handle neutron wall loading in the range of 6 to 8 MW/M{sup 2}. With advanced material like V-alloy, neutron wall loading in the range of 9 to 11 MW/m{sup 2} can be handled by similar design. The design of all components for a combline antenna for JFT-2M has been completed. Completion of the fabrication is scheduled for 11/95. The 4in x 4in 110 GHz window was fabricated and delivered to CPI (Varian) for testing. The second DiMES sample with Be/W striped coatings was exposed to four DIII-D plasma shots. Deuterium areal density measurements by W. Wampler of SNL showed the results from Be/W and Mo/V coated DiMES samples. High uptake of about 2x10{sup 17} …
Date: October 24, 1995
Creator: unknown
System: The UNT Digital Library