Pagosa Springs geothermal project. Final technical report (open access)

Pagosa Springs geothermal project. Final technical report

This booklet discusses some ideas and methods for using Colorado geothermal energy. A project installed in Pagosa Springs, which consists of a pipeline laid down 8th street with service to residences retrofitted to geothermal space heating, is described. (ACR)
Date: October 19, 1984
Creator: unknown
System: The UNT Digital Library
Follow-up inspection of the Formerly Utilized Sites Remedial-Action Program (open access)

Follow-up inspection of the Formerly Utilized Sites Remedial-Action Program

Corrective actions had been taken in four of the six areas of concern that were addressed in the 1982 report. The remaining two areas are summarized as follows: Certification of Remedial Actions. We found, in the initial inspection, that FUSRAP properties were not being certified as decontaminated in a timely manner following remedial action. This problem has not yet been resolved. The Assistant Secretary for Nuclear Energy acknowledged that the certification process is lengthy but maintained that progress was being made. The Assistant Secretary stated that attempts will be made to speed up the process; and Permanent Waste Disposal. The lack of permanent repositories for FUSRAP wastes continues to be a major issue. The Assistant Secretary for Nuclear Energy indicated to us that meetings are being held with state and congressional representatives to impress on them the need for locating disposal sites for FUSRAP wastes in their states.
Date: October 19, 1983
Creator: unknown
System: The UNT Digital Library
Discharge Forecast Modeling project FY87 progress report, October 1, 1986--September 30, 1987 (open access)

Discharge Forecast Modeling project FY87 progress report, October 1, 1986--September 30, 1987

This project originated as a result of the Strontium-90 Action Plan, a response to the abnormal release of radionuclides that occurred from White Oak Creek (WOC) during late November and early December 1985. Several notable problems became obvious during ORNL's response to this release: (1) no predetermined criteria existed for the operation of White Oak Dam (WOD) in response to spills, (2) the hydrodynamics of contaminant transport and dispersion within the WOC watershed and downstream were not adequately understood to support requests for modified reservoir releases, and (3) real-time data on streamflow, precipitation, and water quality within the watershed were not readily available in sufficient quantity and usable format. The modeling study was initiated to help address these problems. This report describes FY 87 accomplishments, including: improvements in data acquisition and evaluation; implementation and calibration of a model to forecast discharges of water and contaminants from the WOC watershed; implementation, documentation, and checking of a model to forecast concentrations of contaminants from WOC in the Clinch River; and three field studies that provide essential calibration data. Data from the field studies and user documentation of the Clinch River model are included as appendices to this report.
Date: October 19, 1987
Creator: Borders, D.M.; Hyndman, D.W. & Railsback, S.F.
System: The UNT Digital Library
Report of the New Rings Study Group (open access)

Report of the New Rings Study Group

We have taken the approach here of trying to understand both the feasibility and practicality of varied options for new rings at Fermilab, rather than trying to produce a single detailed design. In other words, this document is not a design report and should not be construed as such. Our perception of the potential needs for new rings (in order of priority) is as follows: Antiproton Storage and/or Recovery: A facility for storing up to 4 x 10/sup 12/ antiprotons is needed. Recovery of antiprotons from the collider becomes a viable option if the luminosity is indeed dominated by emittance dilution rather than beam loss. New or Post-Booster: The goal here would be to inject into the existing Main Ring above transition. Improved performance of the Main Ring would be anticipated. New Main Ring: Advantages would include better emittance preservation, a faster cycle time for antiproton production, and the removal of interference/backgrounds at the B0 and D0 detectors. We discuss in this paper various scenarios based on one or more combinations of the above possibilities. 14 figs., 10 tabs.
Date: October 19, 1987
Creator: Holmes, S.D.; Dugan, G. & Marriner, J.
System: The UNT Digital Library
Preliminary studies of an infrared free-electron laser oscillator at the ATF(BNL) (open access)

Preliminary studies of an infrared free-electron laser oscillator at the ATF(BNL)

In this report, I present results of a theoretical 1-D model discussed by G. Dattoli, A. Reniere and myself. The validity of a steady-state analysis is discussed and some estimates are given of the effects introduced by the ''lethargy'' of the laser pulse due to the finite length of the e/sup /minus// pulse. Also, I present analytical expressions for the laser pulse in terms of supermodes (wave-packets of cavity modes), their evolution, physical width as well as the associated frequency spectrum. Next, I present results obtained with a 3-D code for the single pass, small-signal gain. In the appendix, I summarize the symbols used in this report. 2 refs., 6 figs., 3 tabs.
Date: October 19, 1988
Creator: Gallardo, J.C.
System: The UNT Digital Library
3-D numerical analysis of a high-gain free-electron laser (open access)

3-D numerical analysis of a high-gain free-electron laser

We present a novel approach to the 3-dimensional high-gain free- electron laser amplifier problem. The method allows us to write the laser field as an integral equation which can be efficiently and accurately evaluated on a small computer. The model is general enough to allow the inclusion of various initial electron beam distributions to study the gain reduction mechanism and its dependence on the physical parameters. 16 refs., 8 figs., 1 tab.
Date: October 19, 1988
Creator: Gallardo, J.C.
System: The UNT Digital Library
Demonstration of in-tank sludge processing: Part 2, Effect of processing on radionuclides (open access)

Demonstration of in-tank sludge processing: Part 2, Effect of processing on radionuclides

The scope and cost of the Defense Waste Processing Facility have been significantly reduced by adding in-tank sludge processing to the process flowsheet. A demonstration of in-tank processing was recently completed and the achievement of the major goals described in a previous memo. This memo describes the effect of in-tank sludge processing on the radionuclides in the waste. This memo will also identify those areas that will require further work both before and during the next scheduled in-tank sludge processing batch.
Date: October 19, 1983
Creator: Eibling, R. E. & Hamm, B. A.
System: The UNT Digital Library
Determination of yield strength (Y/sup 0/) for ballistically impacted cylinders of beryllium (open access)

Determination of yield strength (Y/sup 0/) for ballistically impacted cylinders of beryllium

Two Be materials were added to the table of projectile materials. The resulting Y/sup 0/ values varied from 0.0062 to 0.0101. 8 figures, 1 table. (DLC)
Date: October 19, 1982
Creator: Honodel, C. A.
System: The UNT Digital Library
Discharge Forecast Modeling project FY87 progress report, October 1, 1986--September 30, 1987 (open access)

Discharge Forecast Modeling project FY87 progress report, October 1, 1986--September 30, 1987

This project originated as a result of the Strontium-90 Action Plan, a response to the abnormal release of radionuclides that occurred from White Oak Creek (WOC) during late November and early December 1985. Several notable problems became obvious during ORNL`s response to this release: (1) no predetermined criteria existed for the operation of White Oak Dam (WOD) in response to spills, (2) the hydrodynamics of contaminant transport and dispersion within the WOC watershed and downstream were not adequately understood to support requests for modified reservoir releases, and (3) real-time data on streamflow, precipitation, and water quality within the watershed were not readily available in sufficient quantity and usable format. The modeling study was initiated to help address these problems. This report describes FY 87 accomplishments, including: improvements in data acquisition and evaluation; implementation and calibration of a model to forecast discharges of water and contaminants from the WOC watershed; implementation, documentation, and checking of a model to forecast concentrations of contaminants from WOC in the Clinch River; and three field studies that provide essential calibration data. Data from the field studies and user documentation of the Clinch River model are included as appendices to this report.
Date: October 19, 1987
Creator: Borders, D. M.; Hyndman, D. W. & Railsback, S. F.
System: The UNT Digital Library
Persian Gulf and the War Powers Debate: Issue Summary and Review of Events (open access)

Persian Gulf and the War Powers Debate: Issue Summary and Review of Events

"This issue brief tracks chronologically the events in the Gulf with particular reference to major U.S. policy statements and actions relevant to the War Powers Resolution" (p. iii).
Date: October 19, 1987
Creator: Mark, Clyde R.
System: The UNT Digital Library