Discharge Forecast Modeling project FY87 progress report, October 1, 1986--September 30, 1987 (open access)

Discharge Forecast Modeling project FY87 progress report, October 1, 1986--September 30, 1987

This project originated as a result of the Strontium-90 Action Plan, a response to the abnormal release of radionuclides that occurred from White Oak Creek (WOC) during late November and early December 1985. Several notable problems became obvious during ORNL`s response to this release: (1) no predetermined criteria existed for the operation of White Oak Dam (WOD) in response to spills, (2) the hydrodynamics of contaminant transport and dispersion within the WOC watershed and downstream were not adequately understood to support requests for modified reservoir releases, and (3) real-time data on streamflow, precipitation, and water quality within the watershed were not readily available in sufficient quantity and usable format. The modeling study was initiated to help address these problems. This report describes FY 87 accomplishments, including: improvements in data acquisition and evaluation; implementation and calibration of a model to forecast discharges of water and contaminants from the WOC watershed; implementation, documentation, and checking of a model to forecast concentrations of contaminants from WOC in the Clinch River; and three field studies that provide essential calibration data. Data from the field studies and user documentation of the Clinch River model are included as appendices to this report.
Date: October 19, 1987
Creator: Borders, D. M.; Hyndman, D. W. & Railsback, S. F.
System: The UNT Digital Library
Discharge Forecast Modeling project FY87 progress report, October 1, 1986--September 30, 1987 (open access)

Discharge Forecast Modeling project FY87 progress report, October 1, 1986--September 30, 1987

This project originated as a result of the Strontium-90 Action Plan, a response to the abnormal release of radionuclides that occurred from White Oak Creek (WOC) during late November and early December 1985. Several notable problems became obvious during ORNL's response to this release: (1) no predetermined criteria existed for the operation of White Oak Dam (WOD) in response to spills, (2) the hydrodynamics of contaminant transport and dispersion within the WOC watershed and downstream were not adequately understood to support requests for modified reservoir releases, and (3) real-time data on streamflow, precipitation, and water quality within the watershed were not readily available in sufficient quantity and usable format. The modeling study was initiated to help address these problems. This report describes FY 87 accomplishments, including: improvements in data acquisition and evaluation; implementation and calibration of a model to forecast discharges of water and contaminants from the WOC watershed; implementation, documentation, and checking of a model to forecast concentrations of contaminants from WOC in the Clinch River; and three field studies that provide essential calibration data. Data from the field studies and user documentation of the Clinch River model are included as appendices to this report.
Date: October 19, 1987
Creator: Borders, D.M.; Hyndman, D.W. & Railsback, S.F.
System: The UNT Digital Library
Report of the New Rings Study Group (open access)

Report of the New Rings Study Group

We have taken the approach here of trying to understand both the feasibility and practicality of varied options for new rings at Fermilab, rather than trying to produce a single detailed design. In other words, this document is not a design report and should not be construed as such. Our perception of the potential needs for new rings (in order of priority) is as follows: Antiproton Storage and/or Recovery: A facility for storing up to 4 x 10/sup 12/ antiprotons is needed. Recovery of antiprotons from the collider becomes a viable option if the luminosity is indeed dominated by emittance dilution rather than beam loss. New or Post-Booster: The goal here would be to inject into the existing Main Ring above transition. Improved performance of the Main Ring would be anticipated. New Main Ring: Advantages would include better emittance preservation, a faster cycle time for antiproton production, and the removal of interference/backgrounds at the B0 and D0 detectors. We discuss in this paper various scenarios based on one or more combinations of the above possibilities. 14 figs., 10 tabs.
Date: October 19, 1987
Creator: Holmes, S.D.; Dugan, G. & Marriner, J.
System: The UNT Digital Library