Serial/Series Title
Month
Day
1 Matching Results
Results open in a new window/tab.
Results:
1 - 1 of
1
Geologic and Wireline Summaries from Fiscal Year 2002 ILAW Boreholes
Four boreholes were drilled at the Immobilized Low-Activity Waste Disposal Site in April 2002. Three were completed as groundwater monitoring wells. This report documents the results of the drilling and data collected from the drilling.
Date:
September 30, 2002
Creator:
Reidel, Steve P. & Ho, Anita M.
System:
The UNT Digital Library