Serial/Series Title
3 Matching Results
Results open in a new window/tab.
Results:
1 - 3 of
3
Fission-Product Release from UO2
Release of fission products from UO2 with emphasis on fuel elements operated at higher surface temperatures and lower external pressures than those for pressurized-water systems.
Date:
September 13, 1960
Creator:
Cottrell, W. B.; Culver, H. N.; Scott, J. L. & Yarosh, M. M.
System:
The UNT Digital Library
Metallurgy Division Annual Progress Report, July 1, 1960
Report documenting ongoing research and development undertaken by the Metallurgy Division of the Oak Ridge National Laboratory.
Date:
September 30, 1960
Creator:
Oak Ridge National Laboratory. Metallurgy Division.
System:
The UNT Digital Library
Plutonium Recycle Test Reactor Mechanical Seal Pump Operating Experience: September, 1959 Through August, 1960
Report documenting experience gained by operating the spare PRTR Primary Process Pump. This includes descriptions of equipment used, testing procedures, and operating history.
Date:
September 16, 1960
Creator:
Scott, P. A.
System:
The UNT Digital Library