Energy Reception And Transfer In Photosynthesis (open access)

Energy Reception And Transfer In Photosynthesis

The basic information about the path of carbon in photosynthesis is reviewed, together with the methods that were used to discover it. This has led to the knowledge of what is required of the photochemical reaction in the form of chemical species. Attention is then directed to the structure of the photochemical apparatus itself insofar as it is viewable by electron microscopy, and some principles of ordered structure are devised for the types of molecules to be found in the chloroplasts. From the combination of these, a structure for the grana lamella is suggested and a mode of function proposed. Experimental test for this mode of function is underway; one method is to examine photoproduced unpaired electrons. This is discussed.
Date: September 23, 1958
Creator: Calvin, Melvin, 1911-1997
System: The UNT Digital Library
Measuring Reactor Neutron Spectra with Threshold Detectors (open access)

Measuring Reactor Neutron Spectra with Threshold Detectors

The use of threshold detector foils to measure the external neutron spectrum of two reactors is described. The foils employed are Pu236 to measure the total fast flux, U238 for the region above 1.5 Mev, S32 above 2.5 Mev, and Au197 for thermal neutrons. Scintillation counters ae used to determine the activity induce din the detectors. The foil-counting system is calibrated by used a Cockcroft-Walton accelerator as a fast neutron source. The results indicate a fission type spectrum at each reactor.
Date: September 23, 1960
Creator: Grader, Roderick J.
System: The UNT Digital Library
A Method for Preparing Large Tungsten-Copper Pieces (open access)

A Method for Preparing Large Tungsten-Copper Pieces

Abstract: "This report includes details of the procedure along with the die and equipment descriptions for preparing tungsten copper alloy pieces."
Date: September 23, 1946
Creator: Hirsch, Harold
System: The UNT Digital Library
Staffing Experience for Operation of the Plutonium Recycle Test Reactor (open access)

Staffing Experience for Operation of the Plutonium Recycle Test Reactor

The Plutonium Recycle Test Reactor is a research and development tool supporting the Plutonium Recycle Program and the research activities at Hanford. The present organization directly associated with the PRTR is composed of Operating, Technical Assistance, Maintenance, and Engineering Groups. Liaison with research groups utilizing PRTR facilities is accomplished through the Technical Assistance Group. the other three groups serve the PRTR in the manner suggest by the group name. This paper limits its interest to the staffing experience of the Operating Group.
Date: September 23, 1963
Creator: Koberg, D. R.
System: The UNT Digital Library
Continuous injection processing (open access)

Continuous injection processing

From introduction: "In this report we consider a few non-adiabatic processes. The types to be discussed will be limited because of two reasons: first, complete descriptions are available for some processes; second, as time goes on alternative injection methods undoubtedly will be discovered, so this list must necessarily be incomplete."
Date: September 23, 1955
Creator: Linlor, William I., 1915-
System: The UNT Digital Library
Radiation Chemistry of Ammonia Synthesis of Hydrazine (open access)

Radiation Chemistry of Ammonia Synthesis of Hydrazine

The radiation chemistry of ammonia, pure or with various additives, was studied by Co60 gamma radiation. The kinetics of aniline formation by the irradiation of homogeneous benzene-ammonia mixtures was determined together with the kinetics of hydrazine formation in the case of pure ammonia. The effects of dose, intensity, temperature, and specific additives were determined.
Date: September 23, 1963
Creator: Puig, J. R. & Schwarz, E.
System: The UNT Digital Library
A Program of Two-Phase Flow Investigation Quarterly Report: Second Quarterly Report, July-September, 1963 (open access)

A Program of Two-Phase Flow Investigation Quarterly Report: Second Quarterly Report, July-September, 1963

Task A: Modification and Preparation of Experimental Facility. With the exception of the insulation of modified components, the experimental facility is complete. Insulation will be completed by the end of September. the system has been charged with Refrigerant-22 and preliminary loop performance tests have been completed without the test sections.. Task B: Design and Construction of Test Sections. The stainless steel test section has been prepared complete with end flanges and pressure tap locations. Wall thickness tolerances have been ultrasonically checked. Test section inlet and discharge assemblies are being completed and the whole assembly will be ready for installation by the end of September. Glass sections from the same drawn length which will make up the final test sections have been received for pressure tests. The final coated sections and the associated inlet and discharge fittings will be ready for assembly by the end of September. The above sections were ordered after complete preliminary tests defined the properties required of these test sections. Task C: Design and Construction of Test Stand: The mechanical design and drafting of the structural components and drive system is complete. The electrical control system for the platform orientation has been constructed and two modes of …
Date: September 23, 1963
Creator: Staub, F. W. & Zuber, N.
System: The UNT Digital Library
Procedures for the Separation of Products Resulting From Bombardment of Heavy Elements (open access)

Procedures for the Separation of Products Resulting From Bombardment of Heavy Elements

Technical report that attempts to bring together the various chemical procedures which proved most useful in studying the results of cyclotron bombardment or small scale neutron bombardments of heavy element targets. The report is limited to the elements of the "actinide", or second rare earth series, starting with thorium and including the newly discovered elements of atomic number 95 and 96. Every attempt is made to include all details necessary so this report can serve as a practical laboratory guide. The report covers separation problems, time factors, and dealing with dangerously radioactive targets.
Date: September 23, 1946
Creator: Thompson, Roy
System: The UNT Digital Library
Use of the DD2 Amplifier with the RIDL 200-and 400-Channel Analyzers (open access)

Use of the DD2 Amplifier with the RIDL 200-and 400-Channel Analyzers

The use of the DD^3 amplifier with the RIDL 200- and 400-channel analyzers has been found advantageous for certain applications. In order to use the DD2, certain modifications to the input circuits of the Analog-to Digital Converter Unit are necessary. In addition, the modifications improved the linearity of the analyzer in the low channels. Using the analyzer with the RIDL Type 30-7 Scintillation Pulse Amplifier, it was noted that non-linearity of as much as 5 or 6 channels was present below channel 20. With the modifications made and with the use of the DD2, this non-linearity has been reduced to less than 1/2 channel.
Date: September 23, 1960
Creator: Todd, H. A. & Smiddle, R. D.