Causes of damage to tube 1794-C (open access)

Causes of damage to tube 1794-C

Tube 1794-C was removed from the pile as a leaker on July 15, 1954. The tube had been in-pile since startup and had contained a charge of 32 ``C`` metal slugs just prior to discharge. The tube was slit and examined at the 105-DR underwater viewing facility by Pile Coolant Studies tube examination personnel. A report is made of the examination of tube 1794-C which revealed areas of severe pitting damage. This damage was apparently caused by cocked slugs abrading the tube. The attack was great enough to cause perforation of the tube at about 27 feet from the rear Van Stone flange. Examination of the slugs showed that a considerable number had been cocked. Evidence of severe tube scarring and rib grooves was found on the slugs. Strikingly similar examples of pitting and grooving were observed on flow laboratory minitubes and slugs exposed in high velocity water. It is concluded that the damage observed both in- and ex- pile was caused by the chattering of misaligned low density slugs in a high velocity stream. If the number of in-pile occurrences of this attack becomes excessive it is recommended that the water flow rate in tubes containing ``C`` metal slugs …
Date: August 19, 1954
Creator: Wilson, C. D.
System: The UNT Digital Library
Control of ground contamination (open access)

Control of ground contamination

Portions of the Hanford Reservation in 1954 had significant particulate contamination from the Redox process. This paper is about the methods used to decontaminate the Reservation. The two methods are decontamination and access control. A general description of the ideas and benefits of each method is given. (MB)
Date: August 19, 1954
Creator: Parker, H. M.
System: The UNT Digital Library
Essential material flow sheet of precipitation separations process (open access)

Essential material flow sheet of precipitation separations process

This report describes the direct essential material requirements for processing a standard run through the precipitation separations process in effect on August 1, 1954. Flow sheet conditions are based on a starting maximum batch size of 300 grams of product at a uranium irradiation level of 215 MWD/ton. The essential material requirements are those used to process with 2.5 grams of Bismuth per liter in Extraction, First Decontamination Cycle volumes at 56% of the September 1, 1946 standard, and Second Decontamination Cycle through the Lanthanum Fluoride Product Precipitation volumes at 49% of this standard.
Date: August 19, 1954
Creator: Browne, W. G. & Murray, H. W.
System: The UNT Digital Library
Production test 221-T-18 scavenging of first-cycle waste (open access)

Production test 221-T-18 scavenging of first-cycle waste

The objective of this test is to establish that scavenging of first-cycle wastes in the Bismuth Phosphate Plant will give a supernatant liquor, after the precipitate settles, that may be routinely cribbed. This test will also perform the functions: establish an effective scavenging procedure, shakedown the pH monitor, and train operational personnel. This document discusses test procedures and results.
Date: August 19, 1954
Creator: Schmidt, W.C. & Stedwell, M.J.
System: The UNT Digital Library
Thermal Utilization Measurement (open access)

Thermal Utilization Measurement

None
Date: August 19, 1954
Creator: Price, G A
System: The UNT Digital Library