Resource Type

3 Matching Results

Results open in a new window/tab.

LOFT CIS analysis 4''-IW-179-AB outside containment penetration S-58B (open access)

LOFT CIS analysis 4''-IW-179-AB outside containment penetration S-58B

A stress analysis was performed on the 4''-IW-179-AB pipe system outside containment penetration S-5B. Deadweight, thermal expansion, and seismic loads were considered. The results indicate that this piping will meet ASME Section III, Class 2 requirements.
Date: August 18, 1978
Creator: Morton, D.K.
System: The UNT Digital Library
LOFT CIS analysis line 2''-LS-120-AB outside containment penetration S-1A (open access)

LOFT CIS analysis line 2''-LS-120-AB outside containment penetration S-1A

Line 2''-LS-120-AB outside containment penetration S-1A was analyzed to ASME Section III, Subsection NC (Class 2) criteria. The line is part of the LOFT Containment Isolation System. The model considered the line from the penetration outward through the second isolation valve. Results of the analysis show that this section of the line meets Class 2 requirements without modification.
Date: August 18, 1978
Creator: Pierce, A.T.
System: The UNT Digital Library
LOFT CIS analysis: 24'' H and V Duct outside penetration S-12A (open access)

LOFT CIS analysis: 24'' H and V Duct outside penetration S-12A

The 24'' H and V Duct and related piping outside the LOFT containment and connected to containment penetration S-12A were analyzed to ASME Section III, Subsection NC (Class 2) criteria. The duct is part of the Containment Isolation System. The model considered the duct from the containment O.D. outward through the second isolation valve. Results of this analysis show that this section of the line will meet Class 2 requirements without modification.
Date: August 18, 1978
Creator: Pierce, A.T.
System: The UNT Digital Library