EDOT: a code to calculate charge particle slowing down in a plasma (open access)

EDOT: a code to calculate charge particle slowing down in a plasma

EDOT is a code that calculates the slowing down of a test particle in a Maxwellian plasma utilizing continuous slowing down theory. Both nuclear scattering and reactions are included. The output includes slowing down parameters as well as spectra of knock-on ions and in-flight reaction probabilities. The theory, input, and output for the code are described.
Date: August 5, 1977
Creator: Perkins, S. T.
System: The UNT Digital Library
Separation of Iron and Cobalt on Synthetic Resin (open access)

Separation of Iron and Cobalt on Synthetic Resin

In the separation of mixtures of radioactive iron and cobalt from neutron irradiated targets and in the removal of iron from cobalt targets for cyclotron production of radioiron, it is desirable to have a method superior to extraction from isopropyl ether in efficiency and ease of manipulation. Recent studies by Moore and Kraus on the separation of cobalt and nickel and on the behavior of iron in hydrochloric acid on Dowex-l resin in relation to the selective adsorption of chloride complexes of these elements have suggested the use of resin for the separation of iron and cobalt.
Date: August 5, 1953
Creator: Helwig, H. L.; Ashikawa, J. K.; Clokie, H. & Smith, E. R.
System: The UNT Digital Library
PHASE I SINGLE CELL ELECTROLYZER TEST RESULTS (open access)

PHASE I SINGLE CELL ELECTROLYZER TEST RESULTS

This document reports the results of Phase I Single Cell testing of an SO{sub 2}-Depolarized Water Electrolyzer. Testing was performed primarily during the first quarter of FY 2008 at the Savannah River National Laboratory (SRNL) using an electrolyzer cell designed and built at SRNL. Other facility hardware were also designed and built at SRNL. This test further advances this technology for which work began at SRNL in 2005. This research is valuable in achieving the ultimate goal of an economical hydrogen production process based on the Hybrid Sulfur (HyS) Cycle. The focus of this work was to conduct single cell electrolyzer tests to further develop the technology of SO{sub 2}-depolarized electrolysis as part of the HyS Cycle. The HyS Cycle is a hybrid thermochemical cycle that may be used in conjunction with advanced nuclear reactors or centralized solar receivers to produce hydrogen by water-splitting. Like all other sulfur-based cycles, HyS utilizes the high temperature thermal decomposition of sulfuric acid to produce oxygen and regenerate sulfur dioxide. The unique aspect of HyS is the generation of hydrogen in a water electrolyzer that is operated under conditions where dissolved sulfur dioxide depolarizes the anodic reaction, resulting in substantial voltage reduction. Low cell …
Date: August 5, 2008
Creator: Steimke, J & Timothy Steeper, T
System: The UNT Digital Library
ATWS Transients for the 2400 MWt Gas-Cooled Fast Reactor (open access)

ATWS Transients for the 2400 MWt Gas-Cooled Fast Reactor

Reactivity transients have been analyzed with an updated RELAPS-3D (ver. 2.4.2) system model of the pin core design for the 2400MWt gas-cooled fast reactor (GCFR). Additional reactivity parameters were incorporated in the RELAP5 point-kinetics model to account for reactivity feedbacks due to axial and radial expansion of the core, fuel temperature changes (Doppler effect), and pressure changes (helium density changes). Three reactivity transients without scram were analyzed and the incidents were initiated respectively by reactivity ramp, loss of load, and depressurization. During the course of the analysis the turbine bypass model for the power conversion unit (PCU) was revised to enable a better utilization of forced flow cooling after the PCU is tripped. The analysis of the reactivity transients demonstrates the significant impact of the PCU on system pressure and core flow. Results from the modified turbine bypass model suggest a success path for the GCFR to mitigate reactivity transients without scram.
Date: August 5, 2007
Creator: Cheng, L. Y. & Ludewig, H.
System: The UNT Digital Library
Intelligent Control via Wireless Sensor Networks for Advanced Coal Combustion Systems (open access)

Intelligent Control via Wireless Sensor Networks for Advanced Coal Combustion Systems

Numerical Modeling of Solid Gas Flow, System Identification for purposes of modeling and control, and Wireless Sensor and Actor Network design were pursued as part of this project. Time series input-output data was obtained from NETL's Morgantown CFB facility courtesy of Dr. Lawrence Shadle. It was run through a nonlinear kernel estimator and nonparametric models were obtained for the system. Linear and first-order nonlinear kernels were then utilized to obtain a state-space description of the system. Neural networks were trained that performed better at capturing the plant dynamics. It is possible to use these networks to find a plant model and the inversion of this model can be used to control the system. These models allow one to compare with physics based models whose parameters can then be determined by comparing them against the available data based model. On a parallel track, Dr. Kumar designed an energy-efficient and reliable transport protocol for wireless sensor and actor networks, where the sensors could be different types of wireless sensors used in CFB based coal combustion systems and actors are more powerful wireless nodes to set up a communication network while avoiding the data congestion. Dr. Ahmadi's group studied gas solid flow in …
Date: August 5, 2007
Creator: Behal, Aman; Kumar, Sunil & Ahmadi, Goodarz
System: The UNT Digital Library
Radiological Risk Assessment for King County Wastewater Treatment Division (open access)

Radiological Risk Assessment for King County Wastewater Treatment Division

Staff of the King County Wastewater Treatment Division (WTD) have concern about the aftermath of a radiological dispersion event (RDE) leading to the introduction of significant quantities of radioactive material into the combined sanitary and storm sewer system in King County, Washington. Radioactive material could come from the use of a radiological dispersion device (RDD). RDDs include "dirty bombs" that are not nuclear detonations but are explosives designed to spread radioactive material (National Council on Radiation Protection and Measurements (NCRP) 2001). Radioactive material also could come from deliberate introduction or dispersion of radioactive material into the environment, including waterways and water supply systems. This document develops plausible and/or likely scenarios, including the identification of likely radioactive materials and quantities of those radioactive materials to be involved. These include 60Co, 90Sr, 137Cs, 192Ir, 226Ra, plutonium, and 241Am. Two broad categories of scenarios are considered. The first category includes events that may be suspected from the outset, such as an explosion of a "dirty bomb" in downtown Seattle. The explosion would most likely be heard, but the type of explosion (e.g., sewer methane gas or RDD) may not be immediately known. Emergency first responders must be able to quickly detect the radioisotopes …
Date: August 5, 2005
Creator: Strom, Daniel J.
System: The UNT Digital Library
Energy savings through the use of an improved aluminum reduction-cell cathode. Technical progress report, April 1, 1980-June 30, 1980 (open access)

Energy savings through the use of an improved aluminum reduction-cell cathode. Technical progress report, April 1, 1980-June 30, 1980

Goal is to develop a Hall cell cathode, which will reduce the specific energy consumption of existing commercial cells by 20 to 25%. Basis of the improvement is the utilization of titanium diboride (TiB/sub 2/), a material that is wetted by molten aluminum, as the cell cathode. This provides a stable cathode surface, thereby allowing the cell to be operated at a smaller anode-cathode distance (ACD). Energy savings arise as a result of reduced resistive losses through the cryolite electrolyte. This phase of the program is comprised of three integrated parts: (1) materials characterization, (2) pilot cell testing, and (3) a full-sized cell demonstration. During this quarter emphasis continued on rebuilding the 15KA pilot cell to accommodate a highly sloped electrode system. TiB/sub 2/ cathode materials were received, and construction of cell components and peripheral equipment was completed.
Date: August 5, 1980
Creator: Dorward, R.C. & Payne, J.R.
System: The UNT Digital Library
Strategies for steam handling and H/sub 2/S abatement at geothermal power plants in The Geysers area of northern California (open access)

Strategies for steam handling and H/sub 2/S abatement at geothermal power plants in The Geysers area of northern California

Strict limitations on the emission of H/sub 2/S from new geothermal power plants in The Geysers area of northern California have been imposed by Lake and Northern Sonoma County Air Pollution Control Districts. Lake County, under new source review rules, has stipulated that specific technologies shall be utilized to limit H/sub 2/S emissions to 5 lb/h as a condition for determination of compliance. The status of these technologies as well as other ongoing technology development efforts to conserve steam and abate H/sub 2/S are evaluated. Although projections indicate that it may be possible to meet the 5 lb/h limit, there is no firm assurance of achievement at this time because of the unproven, full-scale performance status of some key technologies specified by the air pollution control districts.
Date: August 5, 1981
Creator: Morris, W.F. & Stephens, F.B.
System: The UNT Digital Library
100-D unit purge (open access)

100-D unit purge

None
Date: August 5, 1945
Creator: Dahlen, P. A.
System: The UNT Digital Library
P Division monthly report, July 1949 (open access)

P Division monthly report, July 1949

The progress report discusses activities of the P Division for the month of July, 1949. The B and F piles operated at 275 megawatts and the D pile at 305 megawatts throughout the month except for outages listed under Area Activities. A total of 57.5 tons of metal, at an average concentration of 363 megawatt days/ton (MWD/ton) was discharged from the piles during the month. This included 41.9 tons of Class V (alpha-rolled, triple-dipped, completely transformed) metal at an average concentration of 397 MWD/ton which was discharged without difficulty. A portion of this material was inspected and appears to be satisfactory for exposures at this concentration.
Date: August 5, 1949
Creator: Lee, Edward P.
System: The UNT Digital Library
Final report for the flow excursion follow-on testing (open access)

Final report for the flow excursion follow-on testing

The purpose of the Mark 22 Flow Excursion Follow-On testing was to investigate the theory that approximately 15% of the flow bypassed the primary flow channels in previous testing, whereas the design called for only a 3% bypass. The results of the follow-on tests clearly confirmed this theory. The testing was performed in two phases. During the first phase, characterization tests performed during the earlier test program were repeated.
Date: August 5, 1992
Creator: Nash, C. A. & Walters, T. W.
System: The UNT Digital Library
Evaluation of HFIR vessel surveillance data and hydro-test conditions (open access)

Evaluation of HFIR vessel surveillance data and hydro-test conditions

None
Date: August 5, 1994
Creator: Cheverton, R. D. & Nanstad, R. K.
System: The UNT Digital Library
A charge distribution analysis instrument for catalysis and material science applications. Third quarterly technical progress report, April 1, 1994--June 30, 1994 (open access)

A charge distribution analysis instrument for catalysis and material science applications. Third quarterly technical progress report, April 1, 1994--June 30, 1994

Key component in the CDA instrument is the differential capacitive force sensor. The CDA instrument has four basic components: OEM analytical balance, flexure point and capacitor plates, gas confinement tower and high-voltage bias electrodes, and the furnace. Phyton is in position to purchase an OEM analytical balance; negotations are underway for obtaining the feedback control circuitry for the differential capacitive force sensor. Progress with the differential capacitive force sensor is reviewed.
Date: August 5, 1994
Creator: Freund, F.
System: The UNT Digital Library
Events of importance for week ending August 3, 1949 (open access)

Events of importance for week ending August 3, 1949

The redox and pile operations are reported on. Construction in 100 (Pile), 200 (Separation), and 300 (Metal Fabrication) areas is described. General work in the Richland commercial areas and on the Southern Railroad connection is also described. Personnel information is disclosed.
Date: August 5, 1949
Creator: Schlemmer, F. C.
System: The UNT Digital Library
Coating of tubealloy slugs (open access)

Coating of tubealloy slugs

None
Date: August 5, 1944
Creator: Boller, E. R.
System: The UNT Digital Library
S Tank Farm SL-119 saltwell piping failure analysis report (open access)

S Tank Farm SL-119 saltwell piping failure analysis report

On January 24, 1992, while pressure testing saltwell line SL-119 in the 241-S Tank Farm, water was observed spraying out of heat trace enclosure. The SL-115, SL-116, SN-215, and SN-216 saltwell lines also recently failed pressure testing because of leaks. This study documents the pertinent facts about the SL-119 line and discusses the cause of the failures. The inspection of the SL-119 failure revealed two through-the-wall holes in the top center of the pipeline. The inspection also strongly suggests that the heat tracing system is directly responsible for causing the SL-119 failure. Poor design of the heat tracing system allowed water to enter, condense, and collect in the electric metallic tubing (EMT) carbon steel conduits. Water flowed to the bottom of the elbow of the conduit and corroded out the elbow. The design also allowed drifting desert sand to enter into the conduit and fall to the bottom (elbow) of the conduit. The sand became wet and aided in the corrosion of the elbow of the conduit. After the EMT conduits corroded though, the water dripped from the corroded ends of the EMT conduits onto the top of the saltwell pipe, corroding the two holes into the top of the …
Date: August 5, 1994
Creator: Carlos, W. C.
System: The UNT Digital Library
A SPICE Model and Electrostatic Field Analysis of the MOS Turn-Off Thyristor (open access)

A SPICE Model and Electrostatic Field Analysis of the MOS Turn-Off Thyristor

This paper presents a circuit model and an electrostatic field analysis with an approximate model of the SDM170HK MOS turn-off thyristor (MTO) fabricated by Silicon Power Corporation. The circuit model consists of five cells, each containing two bipolar junction transistors and three resistors. The turn-off feature of the MTO was simulated by inserting an array of 21 Fairchild FDS6670A MOSFET importable sub-circuit components between the cathode and the turn-on gate. The model was then used to create a four-terminal sub-circuit component representing the MTO that can be readily imported into computer-aided circuit design programs such as PSPICE and Micro-Cap. The generated static I-V characteristics and simulated switching waveforms are shown. The electrostatic field analysis was done for the maximum operating voltage of 4.5 kV using the Ansoft Maxwell 3D field simulator. Electrostatic field magnitudes that exceed the nominal air breakdown threshold of 30 kV/cm were observed surrounding the simulated turn-off gate wire, the turn-off gate ring contact, and the cathode ring contact. The resulting areas of high fields are a concern, as arc track marks have been found on the inner surface of the ceramic insulator near the internal gate connections of a failed device.
Date: August 5, 2002
Creator: Kelly, D. Q.; Mayhall, D. J.; Wilson, M. J. & Lahowe, D. A.
System: The UNT Digital Library
Addressing Problems with Scene-Based Wave Front Sensing (open access)

Addressing Problems with Scene-Based Wave Front Sensing

Scene-Based Wave Front Sensing uses the correlation between successive subimages to determine phase aberrations which blur digital images. Adaptive Optics technology uses deformable mirrors to correct for these phase aberrations and make the images clearer. The correlation between temporal subimages gives tip-tilt information. If these images do not have identical image content, tip-tilt estimations may be incorrect. Motion detection is necessary to help avoid errors initiated by dynamic subimage content. In this document, I will discuss why edge detection fails as a motion detection method on low resolution images and how thresholding the normalized variance of individual pixels is successful for motion detection.
Date: August 5, 2003
Creator: Chan, C
System: The UNT Digital Library
Advanced waste forms research and development. First quarterly report (open access)

Advanced waste forms research and development. First quarterly report

Activities during the last two months are described. A significant portion of time was spent reviewing the literature on the Cs/sub 2/O-Al/sub 2/O/sub 3/-SiO/sub 2/ system, on the use of clays and zeolites for Cs-fixation of aqueous wastes, and on silicate-phosphate apatite structure crystal chemistry. The results from the latest group of compatibility studies (CS-runs) were used to modify the first demonstration supercalcine formulation so that it is more in line with the actual crystalline phase formation. Supercalcine formuation 75-2 is described.
Date: August 5, 1975
Creator: McCarthy, G. J.
System: The UNT Digital Library
IEA Implementing Agreements and Annexes: A Guide for Building Technologies Program Managers (open access)

IEA Implementing Agreements and Annexes: A Guide for Building Technologies Program Managers

This guide presents insights and guidance from DOE’s gathered through longstanding and extensive participation in IEA implementing agreements (IAs) and annexes. Even though DOE has been a key participant in international research activities through the IEA since the 1970s, the experience, knowledge, and institutional memory associated with these activities can be lost or forgotten easily as key DOE managers retire or leave the department. The guide seeks to assemble in a single reference some of the learning that has occurred through participation in IEA IAs as a guide for BTP managers currently responsible for IAs and for those who might consider entering into new IEA activities in the future.
Date: August 5, 2008
Creator: Evans, Meredydd; Meier, Alan & Runci, Paul J.
System: The UNT Digital Library
MAR ASSESSMENTS OF THE HIGH LEVEL WASTE SYSTEM PLAN REVISION 16 (open access)

MAR ASSESSMENTS OF THE HIGH LEVEL WASTE SYSTEM PLAN REVISION 16

High-level waste (HLW) throughput (i.e., the amount of waste processed per unit of time) is primarily a function of two critical parameters: waste loading (WL) and melt rate. For the Defense Waste Processing Facility (DWPF), increasing HLW throughput would significantly reduce the overall mission life cycle costs for the Department of Energy (DOE). Significant increases in waste throughput have been achieved at DWPF since initial radioactive operations began in 1996. Key technical and operational initiatives that supported increased waste throughput included improvements in facility attainment, the Chemical Processing Cell (CPC) flowsheet, process control models and frit formulations. As a result of these key initiatives, DWPF increased WLs from a nominal 28% for Sludge Batch 2 (SB2) to {approx}34 to 38% for SB3 through SB6 while maintaining or slightly improving canister fill times. Although considerable improvements in waste throughput have been obtained, future contractual waste loading targets are nominally 40%, while canister production rates are also expected to increase (to a rate of 325 to 400 canisters per year). Although implementation of bubblers have made a positive impact on increasing melt rate for recent sludge batches targeting WLs in the mid30s, higher WLs will ultimately make the feeds to DWPF more …
Date: August 5, 2011
Creator: Peeler, D. & Edwards, T.
System: The UNT Digital Library
Thinning and rupture of a thin liquid film on a heated surface (open access)

Thinning and rupture of a thin liquid film on a heated surface

Results on the dynamics and stability of thin films are summarized on the following topics: forced dryout, film instabilities on a horizontal plane and on inclined planes, instrumentation, coating flows, and droplet spreading. (DLC)
Date: August 5, 1992
Creator: Bankoff, S. G. & Davis, S. H.
System: The UNT Digital Library
Investigation of the thermal yield from the subsurface explosions. [1 kt source buried at 0. 5, 1. 5 and 3. 0 meters] (open access)

Investigation of the thermal yield from the subsurface explosions. [1 kt source buried at 0. 5, 1. 5 and 3. 0 meters]

The objective of this investigation is to determine the upper limits on the thermal yield of a 1 kt source detonated at shallow depths. Three problems were computed for the depths of burial of 0.5, 1.5, and 3 m. The source is an iron bubble with 30 cm radius and 25 kg of mass. The computation was done on the CEL code. The results show that the relative thermal yield is no more than 6 percent, and that it vanishes at DOB of about 4 m. The computed blast strength is plotted against the range. The results are consistent with the measurements on ''Johnnie Boy'' and ''Jangle-U'', and in good agreement with the RAD9 calculations and the HULL calculations.
Date: August 5, 1976
Creator: Kamegai, M.
System: The UNT Digital Library
Four-D propagation code for high-energy laser beams: a user's manual (open access)

Four-D propagation code for high-energy laser beams: a user's manual

This manual describes the use and structure of the June 30, 1976 version of the Four-D propagation code for high energy laser beams. It provides selected sample output from a typical run and from several debug runs. The Four-D code now includes the important noncoplanar scenario feature. Many problems that required excessive computer time can now be meaningfully simulated as steady-state noncoplanar problems with short run times.
Date: August 5, 1976
Creator: Morris, J. R.
System: The UNT Digital Library