Monthly record report, Research and Engineering Operation N-Reactor Department (open access)

Monthly record report, Research and Engineering Operation N-Reactor Department

A status report is given for the N Reactor. Brief summaries are included for the following technical activities: Co-product physics studies; Target melting calculations; Critical mass parameters; Stack flooding calculations; Co-product metal handling; Co-producer demonstration test; Thermal hydraulics; Primary cooling system supply characteristics; Fringe tube orificing; Fuel tube power split; Simulated driver-target test; Fuel element failure evaluation; 1.96% Integral-target production test; Conversion ratio tests; Fuel examination facility; Process tube monitoring; Corrosion monitoring; I-131 concentrations in river influent following ruptures; and Production of Np-237 and Pu-238 in the N Reactor.
Date: July 31, 1965
Creator: Leverett, M. C.
System: The UNT Digital Library