435 Matching Results

Results open in a new window/tab.

Borrow Area South of Hicks Mountain

Caption says, "Altus Project - Altus, Oklahoma. Dikes, Lugert - No. A-200 Borrow Area No. 2 from top of rock butte south side of Hicks Mountain."
Date: July 16, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Canal Crossing Under Construction

Caption says, "A-725 A view of the completed barrel of the Main Canal Crossing under the A.T. & S.F. Railroad relocation. Forms are being set preparatory to shaping the banks for the transition walls."
Date: July 1, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Canal Outlet

Caption says, "A-889 View of completed first stage construction of canal outlet trashrack structure. Note one set of concrete stop logs in place bringing reservoir level to El. 1516."
Date: July 31, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Carryall Securing Material

Caption says, "Altus Project - Altus, Oklahoma. Dikes, Lugert - No. A-203 Carryall securing material in Borrow Area No. 2 for backfill in cutoff trench."
Date: July 16, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Carryalls Getting Material

Caption says, "Altus Project - Altus, Oklahoma. Dikes, Lugert - No. A-202 Carryalls getting material in Borrow Area No. 2 for cutoff trench."
Date: July 16, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Combining on Mrs. Jones Land

Caption says, "A-2 Altus Project. Combining beardless black hull wheat on property owned by Mrs. Jones, Section 25, T. 4N. , R. 21W. , one and one-half miles west of Blair, Oklahoma. The land was summer fallowed by the renter, Mr. R. B. Pepper of Granite, Oklahoma, Rt. # 1. Previous to summer fallowing the land yielded 12 bushels to the acre. After summer fallowing the yield was increased to 18 bushels per acre."
Date: July 22, 1940
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Complete Well System

Caption says, "Altus Project - Altus, Oklahoma. Dikes, Lugert - No. .A-163 Complete well point system in operation. A compressor unit on east embankment supplies air for ejectors."
Date: July 11, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Completed North Dike and Abandoned CCC Camp

Caption says, "A-722 View of the completed north dike taken from the south abutment. Portions of the abandoned CCC Camp on the right is in the reservoir area."
Date: July 1, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Concrete Curing Test

Caption says, "Altus Project - Altus, Oklahoma. Lake Altus and Vicinity - Field Laboratory - No. A-216 Comparative concrete curing test: Hunt Process curing (cylinders hanging from iron pipe); wet burlap curing in lower part of picture."
Date: July 21, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Concrete Curing Test

Caption says, "Altus Project - Altus, Oklahoma. Lake Altus and Vicinity - Field Laboratory - No. A-217 Comparative concrete curing test: Hunt Process curing and wet burlap curing. Showing details of tests and application of curing compound."
Date: July 21, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Concrete Placing

Caption says, "A-884 Concrete placing activities on right abutment. Concrete buckets are lifted from trucks near the downstream face."
Date: July 22, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Concrete Placing

Caption says, "A-888 General view showing progress of concrete placing during month of July 1943. View taken from access road on right abutment."
Date: July 26, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Concrete Plants

Caption says, "A-883 View of concrete mixing and batching plants. Cement storage house on the right. Note 13 c.y. Euclid trucks being used to haul two 2-c.y. concrete buckets from plant to dam."
Date: July 22, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Construction Equipment Moving Dirt

Construction equipment moving dirt on the abutment for the Altus highway and railroad relocation project. Caption says, "A-739 View along top of Santa Fe Dike from abutment at east end of dike."
Date: July 31, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Crews Hand Tamping

Caption says, "Altus Project - Altus, Oklahoma. Dikes, Lugert - No. A-222 Hand tamping in cutoff trench, Station 43, Lugert Dike."
Date: July 21, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Cucumbers

Caption says, "A-299 Cucumber, long green variety. No production record. End of second week of picking, irrigated plot was producing 3 to 1 over non-irrigated plot."
Date: July 2, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Cutoff Trench

Caption says, "Altus Project - Altus, Oklahoma. Dikes, Lugert - No. A-144 Looking south to end of cut-off trench. Trench is filled and lifts compacted from here to south end."
Date: July 7, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Cutoff Trench

Caption says, "Altus Project - Altus, Oklahoma. Dikes, Lugert - No. A-157 Looking north from east embankment of cutoff trench."
Date: July 1, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Cutoff Trench

Caption says, "Altus Project - Altus, Oklahoma. Dikes, Lugert - No. A-156 Looking south from top of east embankment of cutoff trench."
Date: July 1, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Cutoff Trench and Dike

Caption says, "Altus Project - Altus, Oklahoma. Dikes, Lugert - No. A-198 View of cutoff trench and dike area from rock point north of dike."
Date: July 16, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Cutoff Trench Excavated

Caption says, "Altus Project - Altus, Oklahoma. Dikes, Lugert - No. A-147 North end of dike showing cut-off trench excavated into rock."
Date: July 7, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Cutoff Trench Progress

Caption says, "Altus Project - Altus, Oklahoma. Dikes, Lugert - No. A-178 Looking north along cutoff trench showing progress in placing backfill."
Date: July 12, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Cutoff Trench with Hercules Pump

Caption says, "Altus Project - Altus, Oklahoma. Dikes, Lugert - No. A-146 Cut-off trench partially pumped out by a four-inch Hercules pump."
Date: July 7, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Cyclone Wreckage

Caption says, "A-711 Copy of photograph of wreckage after the cyclone at Lugert, Oklahoma, April 27, 1912."
Date: July 2, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History