Serial/Series Title
States
2 Matching Results
Results open in a new window/tab.
Results:
1 - 2 of
2
Preliminary Design Requirements Argonne Boiling Reactor (ARBOR) Facility
From Introduction: "Descriptions of the functional requirements of the facility, together with preliminary concepts of methods for meeting them, are presented in this prospectus."
Date:
July 15, 1957
Creator:
Fromm, L. W.; Bernsen, S. A.; Bullinger, C. F. & Matousek, J. F.
System:
The UNT Digital Library
Chemical Engineering Division Summary Report for January, February, and March 1957
A fused fluoride process for dissolution of zirconium-uranium fuel alloys is being developed. The alloy is dissolved in an equimolar sodium fluoride-zirconium fluoride melt at 600°C by sparging the system with hydrogen fluoride. The uranium is volatilized from the melt as the hexafluoride by a sparging operation with fluorine or bromine pentafluoride vapor. This product is then decontaminated and purified by fractional distillation.
Date:
July 1957
Creator:
Lawroski, Stephen; Rodger, W. A.; Vogel, R. C. & Munnecke, V. H.
System:
The UNT Digital Library