Concrete Placing

Caption says, "A-875 Progress of concrete placing on left abutment adjacent to the diversion channel. Note temporary cofferdam in channel for purpose of retaining a water supply and also for construction of lower stages of canal outlet trashrack structure."
Date: June 25, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Consistency Meter

Caption says, "A-870 The T. L. Smith & Company Consistency Meter as installed at the Altus Project. Rear view."
Date: June 9, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Consistency Meter

Caption says, "A-869 The T. L. Smith & Company Consistency Meter as installed at the Altus Project. Front view."
Date: June 9, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Concrete Cleanup

Caption says, "A-873 Close up view of concrete surface after initial cleanup with air-water jet."
Date: June 15, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Completed Concrete Placing

Caption says, "A-871 Completed concrete placement prior to initial cleanup operations."
Date: June 15, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Concrete Cleanup

Caption says, "A-872 Initial concrete cleanup operations with air-water jet."
Date: June 15, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Progress Picture

Caption says, "A-877 View of the dam taken from the access road on the left abutment showing the progress to date and the outline of the balance of the foundation. Note the level of Lake Altus and the prominence of silt beds at elevation 1510."
Date: June 25, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Progress Picture

Caption says, "A-876 View of right training wall taken from the top of the dam. The wall is approximately 95 percent complete."
Date: June 25, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Concrete Placing

Caption says, "A-874 View of dam taken from right abutment showing the progress on concrete placing to date. The portion of the right abutment in the foreground is being made ready for concrete."
Date: June 25, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Contraction Joint

Caption says, "A-878 View of the main portion of the dam taken from station 3+00 showing the contraction joint at station 4+25. Note the form cut in the center to allow the crane to pass the joint."
Date: June 25, 1943
Creator: Breitenstein, Frank C.