Forms for Bench Flume
Caption says, "A-1033 Erecting forms for transition from outlet bench flume to earth canal section, Station 125+60. Specifications No. 1078, Morrison-Knudsen Co., Inc., contractor."
Date:
May 18, 1945
Creator:
George, P. W.
System:
The Gateway to Oklahoma History
Rock Excavation
Caption says, "A-1031 Contractor's forces excavating rock cut at Station 88 in preparation for construction of inlet bench flume. Specifications No. 1078, river crossing of Main Canal."
Date:
May 18, 1945
Creator:
George, P. W.
System:
The Gateway to Oklahoma History
Bench Flume Construction Progress
Caption says, "A-1032 View showing progress on construction of inlet bench flume for North Fork of Red River crossing of Main Canal, looking upstream at about Station 95+50. Specifications No. 1078."
Date:
May 18, 1945
Creator:
George, P. W.
System:
The Gateway to Oklahoma History
Completed Section of Main Canal
Caption says, "A-1030 Completed section of Main Canal with protective rock blanket lining in place. View taken looking downstream from Station 44."
Date:
May 18, 1945
Creator:
George, P. W.
System:
The Gateway to Oklahoma History
Dam Spillway
Caption says, "A-1028 View of Altus Dam spillways showing progress in construction of radial gate piers on controlled spillway."
Date:
May 18, 1945
Creator:
George, P. W.
System:
The Gateway to Oklahoma History
Excavation of Main Canal
Caption says, "A-1029 Excavation of Main Canal through former site of field office buildings near Altus Dam."