Checked Baggage Screening: TSA Has Deployed Optimal Systems at the Majority of TSA-Regulated Airports, but Could Strengthen Cost Estimates (open access)

Checked Baggage Screening: TSA Has Deployed Optimal Systems at the Majority of TSA-Regulated Airports, but Could Strengthen Cost Estimates

A letter report issued by the Government Accountability Office with an abstract that begins "The Transportation Security Administration’s (TSA) Electronic Baggage Screening Program (EBSP) reports that 76 percent of the airports (337 of 446) the agency regulates for security have a mix of in-line and stand-alone baggage screening configurations that best meet airport needs (i.e., optimal systems). However, only 36 percent (10 of 28) of the nation’s larger airports—based on factors such as the total number of takeoffs and landings annually—have complete optimal systems. This is because the larger airports generally need more complex in-line systems and often require a significant amount of airport infrastructure modification and construction. In August 2011, TSA shifted its focus from installing optimal baggage screening systems to replacing aging machines (recapitalization). However, TSA plans to continue to optimize systems during many of its recapitalization projects."
Date: April 27, 2012
Creator: United States. Government Accountability Office.
Object Type: Report
System: The UNT Digital Library
Bureau of the Public Debt: Areas for Improvement in Information Systems Controls (open access)

Bureau of the Public Debt: Areas for Improvement in Information Systems Controls

Correspondence issued by the Government Accountability Office with an abstract that begins "In connection with fulfilling our requirement to audit the financial statements of the U.S. government, we audited and reported on the Schedules of Federal Debt Managed by the Bureau of the Public Debt (BPD) for the fiscal years ended September 30, 2010 and 2009. As part of these audits, we performed a review of information systems controls over key BPD financial systems. As we reported in connection with our audit of the Schedules of Federal Debt for the fiscal years ended September 30, 2010 and 2009, we concluded that BPD maintained, in all material respects, effective internal control over financial reporting relevant to the Schedule of Federal Debt as of September 30, 2010, that provided reasonable assurance that misstatements, losses, or noncompliance material in relation to the Schedule of Federal Debt would be prevented, or detected and corrected on a timely basis. However, we identified information systems deficiencies affecting internal control over financial reporting, which, while we do not consider them to be collectively either a material weakness or significant deficiency, nevertheless warrant BPD management's attention and action. This report presents the control deficiencies we identified during our …
Date: April 27, 2011
Creator: United States. Government Accountability Office.
Object Type: Text
System: The UNT Digital Library
Multiple U.S. Agencies Provided Billions of Dollars to Train and Equip Foreign Police Forces (open access)

Multiple U.S. Agencies Provided Billions of Dollars to Train and Equip Foreign Police Forces

Correspondence issued by the Government Accountability Office with an abstract that begins "Over the past few years, the United States has increased its emphasis on training and equipping foreign police as a means of supporting a wide range of U.S. foreign-policy goals, including countering terrorists overseas and stopping the flow of narcotics to the United States. Funding for these activities has increased significantly since we last reported on these issues in 1992. In response to congressional request, this report provides estimates of the funding the U.S. government provided for activities to train and equip foreign police, hereafter referred to as "police assistance," during fiscal year 2009. We defined "police" as all law-enforcement units or personnel with arrest, investigative, or interdiction authorities."
Date: April 27, 2011
Creator: United States. Government Accountability Office.
Object Type: Text
System: The UNT Digital Library
Coast Guard: Civil Rights Directorate's Action Plans to Improve Its Operations Could Be Strengthened by Implementing Several Aspects of Project Planning and Implementation Practices (open access)

Coast Guard: Civil Rights Directorate's Action Plans to Improve Its Operations Could Be Strengthened by Implementing Several Aspects of Project Planning and Implementation Practices

Testimony issued by the Government Accountability Office with an abstract that begins "Allegations of management weaknesses, unsecured personal information, and employee dissatisfaction have been made against U.S. Coast Guard's Civil Rights Directorate (CRD). To address these allegations, the Director of CRD commissioned an external review of civil rights operations. In February 2009, the review made 53 recommendations to improve the civil rights operations. CRD developed action plans to address these recommendations. As requested, GAO reviewed (1) how Coast Guard's action plans align with EEOC's elements of a model equal employment opportunity program (2) how Coast Guard developed and reviewed its action plans, and (3) the extent to which Coast Guard's action plans align with generally accepted project management practices. To conduct this work GAO reviewed documentation from CRD, EEOC, internal control standards, and literature on project management. We also interviewed CRD officials."
Date: April 27, 2010
Creator: United States. Government Accountability Office.
Object Type: Text
System: The UNT Digital Library
Environmental Satellites: Strategy Needed to Sustain Critical Climate and Space Weather Measurements (open access)

Environmental Satellites: Strategy Needed to Sustain Critical Climate and Space Weather Measurements

A letter report issued by the Government Accountability Office with an abstract that begins "Environmental satellites provide data on the earth and its space environment that are used for forecasting the weather, measuring variations in climate over time, and predicting space weather. In planning for the next generation of these satellites, federal agencies originally sought to fulfill weather, climate, and space weather requirements. However, in 2006, federal agencies restructured two key satellite acquisitions, the National Polar-orbiting Operational Environmental Satellite System (NPOESS) and the Geostationary Operational Environmental Satellite-R series (GOES-R). This involved removing key climate and space weather instruments. GAO was asked to (1) assess plans for restoring the capabilities that were removed from the two key satellite acquisitions, (2) evaluate federal efforts to establish a strategy for the long-term provision of satellite-provided climate data, and (3) evaluate federal efforts to establish a strategy for the longterm provision of satellite-provided space weather data. To do so, GAO analyzed agency plans and reports."
Date: April 27, 2010
Creator: United States. Government Accountability Office.
Object Type: Report
System: The UNT Digital Library
Social Security Disability: Management of Disability Claims Workload Will Require Comprehensive Planning (open access)

Social Security Disability: Management of Disability Claims Workload Will Require Comprehensive Planning

Testimony issued by the Government Accountability Office with an abstract that begins "For years, the Social Security Administration (SSA) has been challenged to manage its large disability claims workload. Difficulties in making timely and accurate decisions have contributed to backlogs accumulating at different levels of the claims process. These backlogs have occurred most often at the hearings level, the level at which initial claims that were denied are appealed and await a hearing before an administrative law judge. Claimants often experienced long waits for a decision on their claim because of this backlog. In May 2007, SSA released a plan designed to eliminate its hearings-level backlog. GAO was subsequently asked by Congress to evaluate this plan and issued a report in September 2009 (GAO-09-398). This testimony discusses SSA's backlog reduction plan and the challenges the agency faces in managing its overall claims workload. It draws primarily from GAO's September 2009 report as well as from SSA's Fiscal Year 2009 Performance and Accountability Report, its Annual Performance Plan for Fiscal Year 2011 and Revised Final Performance Plan for Fiscal Year 2010, its fiscal year 2011 budget request documents, and recent reports issued by SSA's Office of the Inspector General (OIG)."
Date: April 27, 2010
Creator: United States. Government Accountability Office.
Object Type: Text
System: The UNT Digital Library
Troubled Asset Relief Program: Update of Government Assistance Provided to AIG (open access)

Troubled Asset Relief Program: Update of Government Assistance Provided to AIG

A letter report issued by the Government Accountability Office with an abstract that begins "Assistance provided by the Department of the Treasury (Treasury) under the Troubled Asset Relief Program (TARP) and the Board of Governors of the Federal Reserve System (Federal Reserve) to American International Group, Inc. (AIG)--a holding company that, through its subsidiaries, is engaged in a broad range of insurance and insurance-related activities in the United States and abroad--represents one of the federal government's largest investments in a private sector institution since the financial crisis began in 2008. Treasury and the Federal Reserve provided assistance to AIG in September 2008 that was restructured in November 2008 and March 2009. As part of GAO's statutorily mandated oversight of TARP, this report updates the risk and repayment indicators GAO originally reported in September 2009 (GAO-09-975). Specifically in this report, GAO discusses (1) trends in AIG's financial condition, (2) trends in the unwinding of AIG Financial Products (AIGFP), (3) the financial condition of AIG's insurance companies, and (4) the status of AIG's repayment of its federal assistance. To update the indicators, GAO primarily used data as of December 31, 2009, and more current publicly available information; reviewed rating agencies' reports; identified …
Date: April 27, 2010
Creator: United States. Government Accountability Office.
Object Type: Report
System: The UNT Digital Library
2010 Census: Census Bureau Should Refine Recruiting and Hiring Efforts and Enhance Training of Temporary Field Staff (open access)

2010 Census: Census Bureau Should Refine Recruiting and Hiring Efforts and Enhance Training of Temporary Field Staff

A letter report issued by the Government Accountability Office with an abstract that begins "The success of the 2010 Census depends, in part, upon the U.S. Census Bureau's (Bureau) ability to recruit, hire, and train over half a million temporary workers at peak. Under the Comptroller General's authority, GAO reviewed the extent that the Bureau's (1) recruiting and hiring processes for these staff are consistent with selected human capital principles and (2) training delivery and content take into account known challenges. To answer these questions, GAO analyzed relevant reports and past recommendations to select principles for evaluating these activities, reviewed related Bureau documents, observed the 2006 Census Test in South Dakota and Texas, and interviewed Bureau officials."
Date: April 27, 2007
Creator: United States. Government Accountability Office.
Object Type: Report
System: The UNT Digital Library
Defense Inventory: Opportunities Exist to Save Billions by Reducing Air Force's Unneeded Spare Parts Inventory (open access)

Defense Inventory: Opportunities Exist to Save Billions by Reducing Air Force's Unneeded Spare Parts Inventory

A letter report issued by the Government Accountability Office with an abstract that begins "At a time when U.S. military forces and their equipment are in high demand, effective management of the Department of Defense's (DOD) inventory is critical to ensure that the warfighter has the right items at the right time. The Air Force is the largest contributor to DOD's total on-hand inventory on the basis of inventory value. Under the statutory authority of the Comptroller General to conduct evaluations on his own initiative, GAO determined the extent to which (1) the Air Force's on-order and on-hand inventory reflect the amount of inventory needed to support required inventory levels from fiscal years 2002 through 2005, and (2) the Air Force had shortages in its inventory needed to support required levels during this period. To address these objectives GAO analyzed Air Force secondary inventory data (spare parts such as engines and guided missiles) from fiscal years 2002 through 2005."
Date: April 27, 2007
Creator: United States. Government Accountability Office.
Object Type: Report
System: The UNT Digital Library
DHS Privacy Office: Progress Made but Challenges Remain in Notifying and Reporting to the Public (open access)

DHS Privacy Office: Progress Made but Challenges Remain in Notifying and Reporting to the Public

A letter report issued by the Government Accountability Office with an abstract that begins "The Department of Homeland Security (DHS) Privacy Office was established with the appointment of the first Chief Privacy Officer in April 2003, as required by the Homeland Security Act of 2002. The Privacy Office's major responsibilities include: (1) reviewing and approving privacy impact assessments (PIA)--analyses of how personal information is managed in a federal system, (2) integrating privacy considerations into DHS decision making, (3) ensuring compliance with the Privacy Act of 1974, and (4) preparing and issuing annual reports and reports on key privacy concerns. GAO's objective was to examine progress made by the Privacy Office in carrying out its statutory responsibilities. GAO did this by comparing statutory requirements with Privacy Office processes, documents, and activities."
Date: April 27, 2007
Creator: United States. Government Accountability Office.
Object Type: Report
System: The UNT Digital Library
Immigration Benefits: Sixteenth Report Required by the Haitian Refugee Immigration Fairness Act of 1998 (open access)

Immigration Benefits: Sixteenth Report Required by the Haitian Refugee Immigration Fairness Act of 1998

Correspondence issued by the Government Accountability Office with an abstract that begins "This report responds to certain requirements of the Haitian Refugee Immigration Fairness Act (HRIFA) of 1998 that authorized certain Haitian nationals and their dependents to apply to adjust their status to lawful permanent residence. Section 902 (k) of the act requires the Comptroller General to report every 6 months on the number of Haitian nationals who have applied and been approved to adjust their status to lawful permanent residence. The reports are to contain a breakdown of the number of Haitians who applied and the number who were approved as asylum applicants, parolees, children without parents, orphaned children, or abandoned children; or as the eligible dependents of these applicants, including spouses, children, and unmarried sons or daughters. Reports are to be provided until all applications have been finally adjudicated. This is GAO's sixteenth report."
Date: April 27, 2007
Creator: United States. Government Accountability Office.
Object Type: Text
System: The UNT Digital Library
Information Technology: DHS Needs to Fully Define and Implement Policies and Procedures for Effectively Managing Investments (open access)

Information Technology: DHS Needs to Fully Define and Implement Policies and Procedures for Effectively Managing Investments

A letter report issued by the Government Accountability Office with an abstract that begins "The Department of Homeland Security (DHS) relies extensively on information technology (IT) to carry out its mission. For fiscal year 2008, DHS requested about $4 billion--the third largest planned IT expenditure among federal departments. Given the size and significance of DHS's IT investments, GAO's objectives were to determine whether DHS (1) has established the management structure and associated policies and procedures needed to effectively manage these investments and (2) is implementing key practices needed to effectively control them. GAO used its IT Investment Management (ITIM) framework and associated methodology to address these objectives, focusing on the framework's stages related to the investment management provisions of the Clinger-Cohen Act."
Date: April 27, 2007
Creator: United States. Government Accountability Office.
Object Type: Report
System: The UNT Digital Library
Information Technology: Immigration and Customs Enforcement Needs to Fully Address Significant Infrastructure Modernization Program Management Weaknesses (open access)

Information Technology: Immigration and Customs Enforcement Needs to Fully Address Significant Infrastructure Modernization Program Management Weaknesses

A letter report issued by the Government Accountability Office with an abstract that begins "The Department of Homeland Security (DHS) fiscal year 2006 appropriations act provided $40.15 million for the Immigration and Customs Enforcement's (ICE) program to modernize its information technology (IT) infrastructure. As mandated by the appropriations act, the department is to develop and submit for approval an expenditure plan for the program, referred to as "Atlas," that satisfies certain legislative conditions, including a review by GAO. In performing its review of the Atlas plan, GAO (1) determined whether the plan satisfies certain legislative conditions and (2) provided other observations about the plan and management of the program. To do this, GAO analyzed the fiscal year 2006 Atlas expenditure plan and supporting documents against the legislative conditions, federal requirements, and related best practices. GAO also interviewed relevant DHS officials."
Date: April 27, 2007
Creator: United States. Government Accountability Office.
Object Type: Report
System: The UNT Digital Library
Polar-Orbiting Operational Environmental Satellites: Restructuring Is Under Way, but Technical Challenges and Risks Remain (open access)

Polar-Orbiting Operational Environmental Satellites: Restructuring Is Under Way, but Technical Challenges and Risks Remain

A letter report issued by the Government Accountability Office with an abstract that begins "The National Polar-orbiting Operational Environmental Satellite System (NPOESS) is a tri-agency acquisition--managed by the Departments of Commerce and Defense and the National Aeronautics and Space Administration--which experienced escalating costs, schedule delays, and technical difficulties. These factors led to a June 2006 decision to restructure the program thereby decreasing the program's complexity, increasing its estimated cost to $12.5 billion, and delaying the first two satellites by 3 to 5 years. GAO was asked to (1) assess progress in restructuring the acquisition, (2) evaluate progress in establishing an effective management structure, (3) assess the reliability of the cost and schedule estimate, and (4) identify the status and key risks facing the program's major segments. To do so, GAO analyzed program and contractor data, attended program reviews, and interviewed program officials"
Date: April 27, 2007
Creator: United States. Government Accountability Office.
Object Type: Report
System: The UNT Digital Library
Veterans Benefits Administration: Progress Made in Long-Term Effort to Replace Benefits Payment System, but Challenges Persist (open access)

Veterans Benefits Administration: Progress Made in Long-Term Effort to Replace Benefits Payment System, but Challenges Persist

A letter report issued by the Government Accountability Office with an abstract that begins "Since 1996, the Veterans Benefit Administration (VBA) has been working on an initiative to replace its aging system for paying compensation and pension benefits. In 2005, concerned about the slow pace of development, VBA contracted with the Software Engineering Institute (SEI) for an independent evaluation of the project, known as the Veterans Service Network (VETSNET). SEI advised VBA to continue working on the project at a reduced pace while addressing management and organization weaknesses that it determined had hampered the project's progress. GAO was requested to determine to what extent the VETSNET project has followed the course of action recommended by SEI and describe the project's current status. To perform its review, GAO analyzed project documentation, conducted site visits, and interviewed key program officials."
Date: April 27, 2007
Creator: United States. Government Accountability Office.
Object Type: Report
System: The UNT Digital Library
Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of April 27, 2006 (open access)

Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of April 27, 2006

Testimony issued by the Government Accountability Office with an abstract that begins "This testimony focuses on the Architect of the Capitol's progress in achieving selected project milestones and in managing the project's schedule since Congress's March 15, 2006, hearing on the project. As part of this discussion, we will address a number of key challenges and risks that continue to face the project, as well as actions AOC has taken or plans to take to address these risks. In addition, we will discuss the status of the project's costs and funding."
Date: April 27, 2006
Creator: United States. Government Accountability Office.
Object Type: Text
System: The UNT Digital Library
Contract Management: Increased Use of Alaska Native Corporations' Special 8(a) Provisions Calls for Tailored Oversight (open access)

Contract Management: Increased Use of Alaska Native Corporations' Special 8(a) Provisions Calls for Tailored Oversight

A letter report issued by the Government Accountability Office with an abstract that begins "Alaska Native corporations (ANC) were created to settle land claims with Alaska Natives and foster economic development. In 1986, legislation passed that allowed ANCs to participate in the Small Business Administration's (SBA) 8(a) program. Since then, Congress has extended special procurement advantages to 8(a) ANC firms, such as the ability to win sole-source contracts for any dollar amount. This report identifies (1) trends in the government's 8(a) contracting with ANC firms, (2) the reasons agencies have awarded 8(a) sole-source contracts to ANC firms and the facts and circumstances behind some of these contracts, and (3) how ANCs are using the 8(a) program. GAO also evaluated SBA's oversight of 8(a) ANC firms."
Date: April 27, 2006
Creator: United States. Government Accountability Office.
Object Type: Report
System: The UNT Digital Library
Gas Pipeline Safety: Preliminary Observations on the Implementation of the Integrity Management Program (open access)

Gas Pipeline Safety: Preliminary Observations on the Implementation of the Integrity Management Program

Testimony issued by the Government Accountability Office with an abstract that begins "About a dozen people are killed or injured in natural gas transmission pipeline incidents each year. In an effort to improve upon this safety record, the Pipeline Safety Improvement Act of 2002 requires that operators assess pipeline segments in about 20,000 miles of highly populated or frequented areas for safety risks, such as corrosion, welding defects, or incorrect operation. Half of these baseline assessments must be done by December 2007, and the remainder by December 2012. Operators must then repair or replace any defective pipelines, and reassess these pipeline segments for corrosion damage at least every 7 years. The Pipeline and Hazardous Materials Safety Administration (PHMSA) administers this program, called gas integrity management. This testimony is based on ongoing work for this Subcommittee and for other committees, as required by the 2002 act. The testimony provides preliminary results on the safety effects of (1) PHMSA's gas integrity management program and (2) the requirement that operators reassess their natural gas pipelines at least every 7 years. It also discusses how PHMSA has acted to strengthen its enforcement program in response to recommendations GAO made in 2004. GAO expects to …
Date: April 27, 2006
Creator: United States. Government Accountability Office.
Object Type: Text
System: The UNT Digital Library
Internal Revenue Service: Assessment of the Interim Results of the 2006 Filing Season and Fiscal Year 2007 Budget Request (open access)

Internal Revenue Service: Assessment of the Interim Results of the 2006 Filing Season and Fiscal Year 2007 Budget Request

Testimony issued by the Government Accountability Office with an abstract that begins "The Internal Revenue Service's (IRS) filing season performance affects tens of millions of taxpayers who expect timely refunds and accurate answers to their tax questions. IRS's budget request is a planning tool showing how it intends to provide taxpayer service and enforce the tax laws in 2007. It is also the first in a series of annual steps that will determine whether IRS meets its new long-term goals of increasing tax compliance and reducing taxpayers' acceptance of cheating on their taxes. Tax law enforcement remains on GAO's list of high-risk federal programs, in part, because of the persistence of a large tax gap. IRS recently estimated the gross tax gap, the difference between what taxpayers owe and what they voluntarily pay, to be $345 billion for 2001. GAO assessed (1) IRS's interim 2006 filing season performance; (2) the budget request; and (3) how the budget helps IRS achieve its longterm goals. GAO compared performance and the requested budget to previous years."
Date: April 27, 2006
Creator: United States. Government Accountability Office.
Object Type: Text
System: The UNT Digital Library
Military Pay: Hundreds of Battle-Injured GWOT Soldiers Have Struggled to Resolve Military Debts (open access)

Military Pay: Hundreds of Battle-Injured GWOT Soldiers Have Struggled to Resolve Military Debts

A letter report issued by the Government Accountability Office with an abstract that begins "As part of the Committee on Government Reform's continuing focus on pay and financial issues affecting Army soldiers deployed in the Global War on Terrorism (GWOT), the requesters were concerned that battle-injured soldiers were not only battling the broken military pay system, but faced blemishes on their credit reports and pursuit by collection agencies from referrals of their Army debts. GAO was asked to determine (1) the extent of debt of separated battle-injured soldiers and deceased Army soldiers who served in the GWOT, (2) the impact of DOD debt collection action on separated battle-injured and deceased soldiers and their families, and (3) ways that Congress could make the process for collecting these debts more soldier friendly."
Date: April 27, 2006
Creator: United States. Government Accountability Office.
Object Type: Report
System: The UNT Digital Library
Military Pay: Inadequate Controls for Stopping Overpayments of Hostile Fire and Hardship Duty Pay to Over 200 Sick or Injured Army National Guard and Army Reserve Soldiers Assigned to Fort Bragg (open access)

Military Pay: Inadequate Controls for Stopping Overpayments of Hostile Fire and Hardship Duty Pay to Over 200 Sick or Injured Army National Guard and Army Reserve Soldiers Assigned to Fort Bragg

Correspondence issued by the Government Accountability Office with an abstract that begins "Over the past several years, we have reported on significant pay problems experienced by mobilized Army National Guard and Army Reserve (Army Guard and Reserve) soldiers in the wake of the September 11, 2001, terrorist attack. These reports included examples of hundreds of soldiers receiving inaccurate and untimely payroll payments due to a paper-intensive, error-prone pay process and the lack of integrated pay and personnel systems. In response to our reports, the Department of Defense (DOD) has taken some action to improve controls designed to pay Army Guard and Reserve soldiers accurately and on time, especially those who had become sick or injured in the line of duty. This report responds to a Congressional request that we investigate the allegation that 37 Army Guard and Reserve soldiers assigned to the Medical Retention Processing Unit (MRPU) at Fort Bragg, North Carolina, were overpaid for hostile fire and hardship duty pay while in an outpatient status. Our objectives were to determine (1) whether the allegations were true, and if so, whether the pay issues were more widespread at Fort Bragg and (2) the key causes of the overpayments and the …
Date: April 27, 2006
Creator: United States. Government Accountability Office.
Object Type: Text
System: The UNT Digital Library
Military Pay: Military Debts Present Significant Hardships to Hundreds of Sick and Injured GWOT Soldiers (open access)

Military Pay: Military Debts Present Significant Hardships to Hundreds of Sick and Injured GWOT Soldiers

Testimony issued by the Government Accountability Office with an abstract that begins "In light of GAO's past four reports and testimonies on Army military pay and travel pay for soldiers who have served in the Global War on Terrorism (GWOT), GAO was asked to determine if weaknesses in Army processes for initiating and terminating active duty pay might result in erroneous payments and debt, including (1) overpayments to soldiers in the Fort Brag Medical Retention Processing Unit (MRPU)--1 of 23 MRPUs--and (2) overpayments and other errors that resulted in debt collection action against battle-injured soldiers who were released from active duty. GAO also was asked to develop case studies to illustrate the effects of these problems on soldiers and their families and to determine ways that Congress could make the debt collection process more soldier friendly."
Date: April 27, 2006
Creator: United States. Government Accountability Office.
Object Type: Text
System: The UNT Digital Library
NASA's Deep Space Network: Current Management Structure Is Not Conducive to Effectively Matching Resources with Future Requirements (open access)

NASA's Deep Space Network: Current Management Structure Is Not Conducive to Effectively Matching Resources with Future Requirements

A letter report issued by the Government Accountability Office with an abstract that begins "The President's Vision for Space Exploration calls for human and robotic missions to the Moon, Mars, and beyond. In response, over the next two decades, NASA may spend $100 billion on new technologies and facilities that will require reliable ground communications to achieve those missions. Presently, that communications capability is provided by NASA's Deep Space Network--a system of antennas located at three sites around the world. However, the Network faces challenges that may hinder its provision of current and future mission support. This report discusses (1) the significant operational challenges faced by the Deep Space Network and (2) the extent to which NASA is integrating the Network into its future communications plans."
Date: April 27, 2006
Creator: United States. Government Accountability Office.
Object Type: Report
System: The UNT Digital Library
Natural Resources: Woody Biomass Users' Experiences Provide Insights for Ongoing Government Efforts to Promote Its Use (open access)

Natural Resources: Woody Biomass Users' Experiences Provide Insights for Ongoing Government Efforts to Promote Its Use

Testimony issued by the Government Accountability Office with an abstract that begins "The federal government is placing greater emphasis on thinning vegetation on public lands to reduce the risk of wildland fire. To help defray the cost of thinning efforts, it also is seeking to stimulate a market for the resulting material, including the smaller trees, limbs, and brush--referred to as woody biomass--that traditionally have had little or no commercial value. As GAO has reported in the past, the increased use of woody biomass faces obstacles, including the high cost of harvesting and transporting it and an unpredictable supply in some locations. Nevertheless, some entities, such as schools and businesses, are utilizing the material, potentially offering insights for broadening its use. GAO agreed to (1) identify key factors facilitating the use of woody biomass among selected users, (2) identify challenges these users have faced in using woody biomass, and (3) discuss any insights that these findings may offer for promoting greater use of woody biomass. This testimony is based on GAO's report Natural Resources: Woody Biomass Users' Experiences Offer Insights for Government Efforts Aimed at Promoting Its Use (GAO-06-336)."