Resource Type
Serial/Series Title
Decade
Month
Language
178 Matching Results
Results open in a new window/tab.
CRI&P Railway Bridge
Caption says, "5-AL-537. Specifications No. 1510. View taken from the west end of the C R I & P railway bridge, looking downstream showing present height of water in the North Fork of the Red River. Location: Crossing of State Highway No. 9 and the North Fork of the Red River near Granite, Oklahoma."
Date:
March 18, 1947
Creator:
Parker, D. B.
Object Type:
Photograph
System:
The Gateway to Oklahoma History
Water and Overflow
Caption says, 5-AL-540. Specifications No. 1510. Composite panorama made from 5-AL-535 and 5-AL-536, showing present height of water and overflow of the North Fork of the Red River where the river and State Highway No. 9 cross near Granite, Oklahoma."
Date:
March 18, 1947
Creator:
Parker, D. B.
Object Type:
Photograph
System:
The Gateway to Oklahoma History
Temporary One-Way Highway Bridge
Caption says, "5-AL-522. Specifications No. 1510. General view looking west of completed temporary one-way highway bridge. Guards will be on duty to control traffic over the one-way structure during the time necessary to raise the present State Highway No. 9 bridge."
Date:
March 5, 1947
Creator:
Parker, D. B.
Object Type:
Photograph
System:
The Gateway to Oklahoma History
CRI&P Railway Bridge
Caption says, "5-AL-521. Specifications No. 1510. Temporary railway trestle (foreground) converted for use as a highway detour bridge where State Highway No. 9 crosses the North Fork of the Red River near Granite, Oklahoma. View also shows relative elevation of C R I & P railroad bridge on which construction has been completed."
Date:
March 5, 1947
Creator:
Parker, D. B.
Object Type:
Photograph
System:
The Gateway to Oklahoma History
North Fork Red River Bridge
Caption says, "5-AL-519. Specifications No. 1510. General view looking east across the North Fork of the Red River. Scene shows completed one-way bridge (left) which will be used while State Highway No. 9 bridge (at right) is being elevated."
Date:
March 5, 1947
Creator:
Parker, D. B.
Object Type:
Photograph
System:
The Gateway to Oklahoma History
CRI&P Railway Bridge
Caption says, "5-AL-520. Specifications No. 1510. General view looking west of elevated C R I & P railway bridge (right) temporary trestle in center which has been converted for use as a one-way highway bridge while State Highway No. 9 bridge (far left) is being elevated."
Date:
March 5, 1947
Creator:
Parker, D. B.
Object Type:
Photograph
System:
The Gateway to Oklahoma History
Wasteway and Siphon Spillway
Caption says, "5-AL-523. Specifications No. 1374. View of inside forms and reinforcement steel in place for siphon spillway portion of combination culvert, wasteway, and siphon spillway at Station 776-95, Altus Canal."
Date:
March 5, 1947
Creator:
Parker, D. B.
Object Type:
Photograph
System:
The Gateway to Oklahoma History
Backfilling Operations
Caption says, "5-AL-525. Specifications no. 1374. General view showing backfilling operations on inlet end of siphon at Station 971-26, Altus Canal."
Date:
March 5, 1947
Creator:
Parker, D. B.
Object Type:
Photograph
System:
The Gateway to Oklahoma History
Backfilling Operations
Caption says, "5-AL-524. Specifications No. 1374. Backfilling operations on inlet end of siphon at Station 971-26, Altus Canal."
Date:
March 5, 1947
Creator:
Parker, D. B.
Object Type:
Photograph
System:
The Gateway to Oklahoma History
Concrete Work Completed
Caption says, "-AL-531. Specifications No. 1180. Check at Station 431-75, Altus 9.9 Lateral, with concrete work completed."
Date:
March 5, 1947
Creator:
Parker, D. B.
Object Type:
Photograph
System:
The Gateway to Oklahoma History
Drainage
Caption says, "5-AL-532. Specifications No. 1180, outlet end of No. 9 turnout at Station 431-51, Altus 9.9 lateral."
Date:
March 5, 1947
Creator:
Parker, D. B.
Object Type:
Photograph
System:
The Gateway to Oklahoma History
Combination Culvert
Caption says, "5-AL-538. Specifications 1179. General view looking upstream, showing initial construction on outlet transition of combination culvert, check and wasteway, Station 9-28, West Canal."
Date:
March 18, 1947
Creator:
Parker, D. B.
Object Type:
Photograph
System:
The Gateway to Oklahoma History
Combination Culvert
Caption says, "5-AL-539. Specifications 1179. General view looking upstream, showing initial construction on outlet transition of combination culvert, check and wasteway, Station 9-28, West Canal."
Date:
March 18, 1947
Creator:
Parker, D. B.
Object Type:
Photograph
System:
The Gateway to Oklahoma History
Completed Inlet
Caption says, "5-AL-527. Specifications No. 1179. Completed inlet of siphon at Station 1-85.17, West Canal."
Date:
March 5, 1947
Creator:
Parker, D. B.
Object Type:
Photograph
System:
The Gateway to Oklahoma History
Chattin Ditcher Excavating
Caption says, "5-AL-528. Specifications No. 1133. Three-quarter front view of Chattin Ditcher excavating Altus 4.1a lateral at Station 11-00."
Date:
March 5, 1947
Creator:
Parker, D. B.
Object Type:
Photograph
System:
The Gateway to Oklahoma History
Chattin Ditcher Excavating
Caption says, "5-AL-529. Specifications No. 1133. Rear view of Chattin Ditcher excavating Altus 4.1a lateral at Station 11-00."
Date:
March 5, 1947
Creator:
Parker, D. B.
Object Type:
Photograph
System:
The Gateway to Oklahoma History
Backfilling
Caption says, "5-AL-526. Specifications No. 1133. View looking downstream from Station 411-00, showing backfilling of overexcavated portion of Altus Canal."
Date:
March 5, 1947
Creator:
Parker, D. B.
Object Type:
Photograph
System:
The Gateway to Oklahoma History
Completed Canal Section
Caption says, "5-AL-530. Specifications No. 1133. View of completed section of the Altus Canal, looking downstream from Station 594-00."
Date:
March 5, 1947
Creator:
Parker, D. B.
Object Type:
Photograph
System:
The Gateway to Oklahoma History
Raised Bridge
Caption says, "A-997 Truss spans of C.R.I. & P. Ry. bridge across upper part of reservoir raised to final height, an average lift of 13 ft. 7-3/8 in., preparatory to building up concrete piers."
Date:
March 18, 1945
Creator:
George, P. W.
Object Type:
Photograph
System:
The Gateway to Oklahoma History
Siphon After Being Flooded
Caption says, "A-995 Specifications 1078, North Fork of Red River Crossing. View showing condition of siphon at Station 99+80 after being flooded by water and sand during intense rain of March 10, 1945. Reinforcing bars and lumber in foreground have been partly covered by silt."
Date:
March 12, 1945
Creator:
George, P. W.
Object Type:
Photograph
System:
The Gateway to Oklahoma History
Sand in Siphon After Rain Runoff
Caption says, "A-996 Sand deposited in barrel of siphon by runoff from rain of March 10, 1945. View taken looking toward Station 99+80 from near Station 112."
Date:
March 12, 1945
Creator:
George, P. W.
Object Type:
Photograph
System:
The Gateway to Oklahoma History
Ten Feet of Storm Water in Main Canal
Caption says, "A-994 Water from storm runoff standing ten feet deep in Main Canal after intense rain of March 10, 1945. View taken looking north from near south end of canal."
Date:
March 12, 1945
Creator:
George, P. W.
Object Type:
Photograph
System:
The Gateway to Oklahoma History
Completed Canal Bank
Caption says, "A-1001 Completed canal bank along highway between Stations 170 and 173 of Main Canal."
Date:
March 19, 1945
Creator:
George, P. W.
Object Type:
Photograph
System:
The Gateway to Oklahoma History
Masonry
Caption says, "A-1000 View showing progress on masonry walls of canal outlet gatehouse and placing of concrete in Main Canal check."
Date:
March 19, 1945
Creator:
George, P. W.
Object Type:
Photograph
System:
The Gateway to Oklahoma History