Month

4 Matching Results

Results open in a new window/tab.

Flood Waters

Caption says, "A-852 Flood waters over the Dam in 1935. Photographic copy of small print."
Date: March 31, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Spillway Face

Caption says, "A-849 View showing forms on spillway face of dam and on Block B of the intermediate training wall. Note flashboards on top of old dam in background."
Date: March 31, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Drawing of Model

Caption says, "A-851 Photographic copy of photograph of architect's drawing of model of Altus Dam."
Date: March 31, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Concrete Placing

Caption says, "A-850 First concrete placed in left abutment on left side of diversion channel. Masonry in foreground is upstream face of dam."
Date: March 31, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History