175 Matching Results

Results open in a new window/tab.

Aggregate Concrete

Caption says, "A-629 Mix No. 13, 14, and 15, left to right. Maximum size aggregate concrete. Twenty-eight days old."
Date: March 13, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Reclamation Camp Mess Hall

Caption says, "A-662 Mess hall in Reclamation Camp. 175 men were fed here at its peak load."
Date: March 28, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Guy Brisco on Fordson Tractor

Caption says, "A-71 Official Photograph. Guy Brisco, an N.Y.A student of the Altus Junior College, operating a Fordson tractor during breaking ground operations on the experimental plot one mile north of the city of Altus,"
Date: March 10, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Planting Irish Potatoes

Caption says, "5-AL-1117. Crops. Planting Irish potatoes with a 2-row planter."
Date: March 7, 1949
Creator: George, P. W.
System: The Gateway to Oklahoma History

Pannell Construction

Caption says, "5-AL-877. Specifications No. 1987. View of first concrete placing operations by Pannell Construction Company in a drop at Station 9+65 on Ozark 4.6 Lateral."
Date: March 17, 1948
Creator: Vaughan, R. O.
System: The Gateway to Oklahoma History

Panorama 1 of 4

Caption says, "A-638 East Dike, section C from rock point west of Section A. Panorama No. 1 of 4."
Date: March 23, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Panorama 2 of 4

Caption says, "A-639 East Dike, sections C and B. Panorama No. 2 of 4."
Date: March 23, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Panorama 4 of 4

Caption says, "A-641 East Dike, section A looking east. Panorama No. 4 of 4."
Date: March 23, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Panorama 3 of 4

Caption says, "A-640 East Dike, section B. Panorama No. 3 of 4."
Date: March 23, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Outlet End

Caption says, "5-AL-108. Specifications No. 1085. Outlet end of siphon under county road northeast of Blair, Station 235-87 of Altus Canal."
Date: March 13, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

North Fork Red River Bridge

Caption says, "5-AL-519. Specifications No. 1510. General view looking east across the North Fork of the Red River. Scene shows completed one-way bridge (left) which will be used while State Highway No. 9 bridge (at right) is being elevated."
Date: March 5, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

Mr. Wesley Holtz

Caption says, "A-835 Mr. Wesley Holtz holding a new vibrator to be tried out on the concrete to be placed in the dam."
Date: March 2, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Masonry

Caption says, "A-1000 View showing progress on masonry walls of canal outlet gatehouse and placing of concrete in Main Canal check."
Date: March 19, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

CRI&P Railway Bridge

Caption says, "5-AL-535. Specifications No. 1510. View taken from east end of C R I & P railway bridge, looking downstream shwoing height of water in the North Fork of the Red River. Location: Crossing of State Hghway No. 9 and North Fork of the Red River Near Granite, Oklahoma. Left portion of two print panorama.
Date: March 18, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

CRI&P Railway Bridge

Caption says, "5-AL-536. Specifications No. 1510. View taken from east end of C R I & P railway bridge, looking downstream showing height of water in the North Fork of the Red River. Location: Crossing of State Highway No. 9 and North Fork of the Red River near Granite, Oklahoma. Right portion of a two print panorama."
Date: March 18, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

CRI&P Railway Bridge

Caption says, "5-AL-537. Specifications No. 1510. View taken from the west end of the C R I & P railway bridge, looking downstream showing present height of water in the North Fork of the Red River. Location: Crossing of State Highway No. 9 and the North Fork of the Red River near Granite, Oklahoma."
Date: March 18, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

Combination Culvert

Caption says, "5-AL-538. Specifications 1179. General view looking upstream, showing initial construction on outlet transition of combination culvert, check and wasteway, Station 9-28, West Canal."
Date: March 18, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

Combination Culvert

Caption says, "5-AL-539. Specifications 1179. General view looking upstream, showing initial construction on outlet transition of combination culvert, check and wasteway, Station 9-28, West Canal."
Date: March 18, 1947
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

Altus Canal

Caption says, "5-AL-107. Specifications No. 1085. View of Altus Canal taken looking downstream from Station 250-00, east of Blair."
Date: March 13, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

Altus Canal

Caption says, " 5-AL-109. Specifications No. 1085. View showing back of left outlet wing wall of siphon, Staion 235-87 of Altus Canal.
Date: March 13, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

Altus Canal

Caption says, " 5-AL-110. Specifications No. 1085. View of concrete placing operations on left inlet wing wall of siphon, Altus Canal Station 235-87."
Date: March 13, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

Completed Check Drop

Caption says, "5-AL-105 Specifications No. 1085. Completed check drop on Altus Canal at Station 371+00."
Date: March 13, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

Completed Pipe Turnout

Caption says, "5-AL-106 Specifications No. 1085. Completed 36-inch concrete pipe turnout from Altus Canal at Station 267+94 for delivery to Altus 4.8 Lateral."
Date: March 13, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

Close up of Tire Repair

Close of a tire being repaired for the Altus highway and railroad relocation project. Caption says, "A-660 Tire Repair. A view of the boot after being bolted in place and ready for the tube. Note the smooth appearance of the bolt heads on the inside of the tire. Thus far there has been no trouble resulting from contact of the tube with these bolt heads."
Date: March 28, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History