2013 Sequestration: Agencies Reduced Some Services and Investments, While Taking Certain Actions to Mitigate Effects (open access)

2013 Sequestration: Agencies Reduced Some Services and Investments, While Taking Certain Actions to Mitigate Effects

A letter report issued by the Government Accountability Office with an abstract that begins "Fiscal year 2013 sequestration reduced or delayed some public services and disrupted some operations in the 23 federal agencies GAO reviewed, even though agencies took actions to minimize the effects. For example, agencies reported that sequestration reduced assistance for education, housing, and nutrition, as well as health and science research and development grants. Agencies also reported delaying investments such as information technology and facilities projects. Some federal services also experienced backlogs and delays as a result of personnel actions including limiting hiring and furloughing employees. However, many of the effects of sequestration could not be quantified or will not be known until future years, if at all, for a number of reasons including the timing of when funds are disbursed (such as grant cycles that start late in the fiscal year), challenges in isolating the effects from other factors, and the lack of currently available performance data for some programs. Moreover, congressional and agency actions mitigated some potential effects by shifting funds to higher priorities while deferring or reducing funding for lower priorities."
Date: March 6, 2014
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
American Samoa and the Commonwealth of the Northern Mariana Islands: Economic Indicators Since Minimum Wage Increases Began (open access)

American Samoa and the Commonwealth of the Northern Mariana Islands: Economic Indicators Since Minimum Wage Increases Began

A letter report issued by the Government Accountability Office with an abstract that begins "American Samoa employment and earnings have decreased since 2007, but employment increased slightly from 2011 to 2012. Since 2005, the American Samoa economy has had a flat or declining real gross domestic product (GDP)."
Date: March 31, 2014
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Architect of the Capitol: Incorporating All Leading Practices Could Improve Accuracy and Credibility of Projects' Cost Estimates (open access)

Architect of the Capitol: Incorporating All Leading Practices Could Improve Accuracy and Credibility of Projects' Cost Estimates

A letter report issued by the Government Accountability Office with an abstract that begins "GAO's Cost Estimating and Assessment Guide (Cost Guide) defines 12 leading practices that are associated with four characteristics—comprehensive, well documented, accurate , and credible —that are important to developing high-quality, reliable project-cost estimates. Using the Cost Guide , GAO determined that the Architect of the Capitol's (AOC) cost-estimating guidance conforms to leading practices for developing estimates that are, in general, comprehensive and well-documented . However, AOC's guidance does not substantially conform to leading practices related to developing cost estimates that are accurate and credible . For example, pertaining to the credible characteristic, AOC's guidance does not require determining the confidence level of estimates or quantifying the extent to which a project's costs could vary due to changes in key assumptions. GAO found the strengths and weaknesses of AOC's guidance generally reflected in the cost estimates for AOC's Cannon House Office Building's (Cannon Building) renewal project ($753 million) and Capitol Dome's restoration project ($125 million)."
Date: March 25, 2014
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Arizona Border Surveillance Technology Plan: Additional Actions Needed to Strengthen Management and Assess Effectiveness (open access)

Arizona Border Surveillance Technology Plan: Additional Actions Needed to Strengthen Management and Assess Effectiveness

A letter report issued by the Government Accountability Office with an abstract that begins "The Department of Homeland Security's (DHS) U.S. Customs and Border Protection's (CBP) schedules and Life-cycle Cost Estimates for the Arizona Border Surveillance Technology Plan (the Plan) reflect some, but not all, best practices. Scheduling best practices are summarized into four characteristics of reliable schedules—comprehensive, well constructed, credible, and controlled (i.e., schedules are periodically updated and progress is monitored). GAO assessed CBP's schedules as of March 2013 for the three highest-cost programs that represent 97 percent of the Plan's estimated cost. GAO found that schedules for two of the programs at least partially met each characteristic (i.e., satisfied about half of the criterion), and the schedule for the other program at least minimally met each characteristic (i.e., satisfied a small portion of the criterion), as shown in the table below. For example, the schedule for one of the Plan's programs partially met the characteristic of being credible in that CBP had performed a schedule risk analysis for the program, but the risk analysis was not based on any connection between risks and specific activities. For another program, the schedule minimally met the characteristic of being controlled in …
Date: March 3, 2014
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Canceled DOD Programs: DOD Needs to Better Use Available Guidance and Manage Reusable Assets (open access)

Canceled DOD Programs: DOD Needs to Better Use Available Guidance and Manage Reusable Assets

A letter report issued by the Government Accountability Office with an abstract that begins "Cancellation of a major Department of Defense (DOD) weapon program can have broad effects. Cancellation of one program can affect the schedules or budgets for related programs as well as the industrial base and local economies. For example, the cancellation of one program has impacted the schedule for the Army's network modernization efforts. DOD stakeholders can provide input to program officials on the potential effects of a cancellation."
Date: March 27, 2014
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Capital Financing: Alternative Approaches to Budgeting for Federal Real Property (open access)

Capital Financing: Alternative Approaches to Budgeting for Federal Real Property

A letter report issued by the Government Accountability Office with an abstract that begins "Officials at four selected agencies—the General Services Administration (GSA), U.S. Department of Agriculture (USDA), the Department of Veterans Affairs (VA), and the Department of the Interior (Interior)—experienced challenges receiving full upfront funding for federal real property projects through the annual appropriations process. For example, due to budget constraints, GSA acquired one property between 2008 and 2012. In addition, GSA has been unable to access funding to complete renovations in Interior's headquarters building due to obligation limitations in the GSA-administered Federal Buildings Fund (FBF). The FBF, which is the primary funding source for operating and capital costs associated with federal space, held an unobligated carryover balance of $4.7 billion at the end of fiscal year 2013 as a result of congressional limits on obligations. Officials noted that authority to retain proceeds provides a key incentive to initiate disposals, as agencies without this authority must request upfront funding for disposal costs while resulting proceeds are paid to the Department of the Treasury. Nonetheless, officials at selected agencies with the authority to retain disposal proceeds cited barriers to disposals, such as poor market demand, historical status or necessary remediation."
Date: March 12, 2014
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Countering Overseas Threats: Gaps in State Department Management of Security Training May Increase Risk to U.S. Personnel (open access)

Countering Overseas Threats: Gaps in State Department Management of Security Training May Increase Risk to U.S. Personnel

A letter report issued by the Government Accountability Office with an abstract that begins "Using data from multiple sources, GAO determined that 675 of 708 Department of State (State) personnel and all 143 U.S. Agency for International Development (USAID) personnel on assignments longer than 6 months (assigned personnel) in the designated high-threat countries on March 31, 2013, were in compliance with the Foreign Affairs Counter Threat (FACT) training requirement. GAO found that the remaining 33 State assigned personnel on such assignments had not complied with the mandatory requirement. For State and USAID personnel on temporary duty of 6 months or less (short-term TDY personnel), GAO was unable to assess compliance because of gaps in State's data. State does not systematically maintain data on the universe of U.S. personnel on short-term TDY status to designated high-threat countries who were required to complete FACT training. This is because State lacks a mechanism for identifying those who are subject to the training requirement. These data gaps prevent State or an independent reviewer from assessing compliance with the FACT training requirement among short-term TDY personnel. According to Standards for Internal Control in the Federal Government , program managers need operating information to determine whether …
Date: March 10, 2014
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Defense Acquisitions: Assessments of Selected Weapon Programs (open access)

Defense Acquisitions: Assessments of Selected Weapon Programs

A letter report issued by the Government Accountability Office with an abstract that begins "Over the past year, the overall size of DOD's major defense acquisition program portfolio decreased, from 85 programs to 80, while the estimated cost has increased by $14.1 billion. The average time to deliver initial capability to the warfighter also increased by 2 months. The slight cost increase can be attributed to the addition of one program, the Evolved Expendable Launch Vehicle. This furthers a trend for decreased portfolio size seen for the past three years. Although the overall cost of the 2013 portfolio increased, 50 of the 80 programs decreased costs, and 64 percent of programs increased their buying power. There are still some programs that have performed poorly, both over the past year and in the longer term. Fifty-five percent of the current portfolio funding has been appropriated, leaving approximately $682 billion needed for future funding. About forty-five percent of this remaining funding represents cost growth from initial estimates, a clear indicator that DOD needs to do more to control cost growth."
Date: March 31, 2014
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Defense Health Care: Acquisition Process for TRICARE's Third Generation of Managed Care Support Contracts (open access)

Defense Health Care: Acquisition Process for TRICARE's Third Generation of Managed Care Support Contracts

A letter report issued by the Government Accountability Office with an abstract that begins "The TRICARE Management Activity (TMA) within the Department of Defense (DOD) used the acquisition process prescribed by federal regulations to acquire health care services for the TRICARE Program through the third generation of TRICARE's managed care support contracts (MCSC). This process included a three-phased contract award process outlined in the figure below."
Date: March 7, 2014
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
DHS Asset Forfeiture: Additional Actions Could Help Strengthen Controls over Equitable Sharing (open access)

DHS Asset Forfeiture: Additional Actions Could Help Strengthen Controls over Equitable Sharing

A letter report issued by the Government Accountability Office with an abstract that begins "From fiscal years 2003 through 2013, Department of Homeland Security (DHS) components that participate in the Treasury Forfeiture Fund—U.S. Immigration and Customs Enforcement (ICE), the U.S. Secret Service (USSS), U.S. Customs and Border Protection (CBP), and the U.S. Coast Guard (USCG)—contributed approximately $3.6 billion in revenues to the fund and obligated about $2.6 billion from the fund for forfeiture-related activities. These obligations included, among other things, approximately $1.2 billion that DHS components shared with state, local, federal, and foreign law enforcement agencies that participated in forfeiture efforts. Also, during this period, DHS components used about $348 million from the fund to support various law enforcement activities and projects, such as the construction of Border Patrol facilities along the southwest border."
Date: March 28, 2014
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Electronic Health Record Programs: Participation Has Increased, but Action Needed to Achieve Goals, Including Improved Quality of Care (open access)

Electronic Health Record Programs: Participation Has Increased, but Action Needed to Achieve Goals, Including Improved Quality of Care

A letter report issued by the Government Accountability Office with an abstract that begins "Based on the number of providers awarded incentive payments, participation in the Department of Health and Human Services' (HHS) Medicare and Medicaid Electronic Health Record (EHR) programs increased substantially from their first year in 2011 to 2012. For hospitals, participation increased from 45 percent of those eligible for 2011 to 64 percent of those eligible for 2012. For professionals, such as physicians, participation increased from 21 percent of those eligible for 2011 to 48 percent of those eligible for 2012. While increases occurred, a substantial percentage of providers that participated in 2011 did not participate in 2012. Officials who oversee the programs at the Centers for Medicare & Medicaid Services (CMS) noted there could be several reasons for this, such as challenges in demonstrating meaningful use, and are monitoring the issue. Various program changes make future participation difficult to estimate. For example, increased stringency of requirements for the programs' second phase beginning in 2014—Stage 2—may slow participation, while the introduction of penalties in 2015 for some providers may motivate participation."
Date: March 6, 2014
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Electronic Health Records: HHS Strategy to Address Information Exchange Challenges Lacks Specific Prioritized Actions and Milestones (open access)

Electronic Health Records: HHS Strategy to Address Information Exchange Challenges Lacks Specific Prioritized Actions and Milestones

A letter report issued by the Government Accountability Office with an abstract that begins "Providers and stakeholders GAO interviewed in four states with ongoing electronic health information exchange efforts cited key challenges to exchange, in particular, issues related to insufficient standards, concerns about how privacy rules can vary among states, difficulties in matching patients to their records, and costs associated with exchange. Officials from the Centers for Medicare & Medicaid Services (CMS) and the Office of the National Coordinator for Health Information Technology (ONC)—agencies within the Department of Health and Human Services (HHS)—noted that they have several ongoing programs and initiatives to help address some aspects of these key challenges, but concerns in these areas continue to exist. For example, several providers GAO interviewed said that they have difficulty exchanging certain types of health information due to insufficient health data standards. Although HHS has begun to address insufficiencies in standards through its Medicare and Medicaid Electronic Health Record (EHR) programs, such as through the introduction of new 2014 standards for certified EHR technology, it is unclear whether its efforts will lead to widespread improvements in electronic health information exchange. In addition, providers GAO interviewed reported challenges covering costs associated with …
Date: March 24, 2014
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
F-35 Joint Strike Fighter: Problems Completing Software Testing May Hinder Delivery of Expected Warfighting Capabilities (open access)

F-35 Joint Strike Fighter: Problems Completing Software Testing May Hinder Delivery of Expected Warfighting Capabilities

A letter report issued by the Government Accountability Office with an abstract that begins "Delays in developmental flight testing of the F-35's critical software may hinder delivery of the warfighting capabilities the military services expect. F-35 developmental flight testing comprises two key areas: mission systems and flight sciences. Mission systems testing verifies that the software-intensive systems that provide critical warfighting capabilities function properly and meet requirements, while flight sciences testing verifies the aircraft's basic flying capabilities. Challenges in development and testing of mission systems software continued through 2013, due largely to delays in software delivery, limited capability in the software when delivered, and the need to fix problems and retest multiple software versions. The Director of Operational Test and Evaluation (DOT&E) predicts delivery of warfighting capabilities could be delayed by as much as 13 months. Delays of this magnitude will likely limit the warfighting capabilities that are delivered to support the military services' initial operational capabilities—the first of which is scheduled for July 2015—and at this time it is not clear what those specific capabilities will be because testing is still ongoing. In addition, delays could increase the already significant concurrency between testing and aircraft procurement and result in additional …
Date: March 24, 2014
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Federal Contracting: Noncompetitive Contracts Based on Urgency Need Additional Oversight (open access)

Federal Contracting: Noncompetitive Contracts Based on Urgency Need Additional Oversight

A letter report issued by the Government Accountability Office with an abstract that begins "The Departments of Defense (DOD) and State and the U.S. Agency for International Development (USAID) used the urgency exception to a limited extent, but the reliability of some federal procurement data elements is questionable. For fiscal years 2010 through 2012, obligations reported under urgent noncompetitive contracts ranged from less than 1 percent to about 12 percent of all noncompetitive contract obligations. During that time, DOD obligated $12.5 billion noncompetitively to procure goods and services using the urgency exception, while State and USAID obligated $582 million and about $20 million respectively, almost exclusively to procure services. Among the items procured were personal armor, guard services and communications equipment to support missions in Afghanistan and Iraq. GAO found coding errors that raise concerns about the reliability of federal procurement data on the use of the urgency exception. Nearly half—28 of the 62 contracts in GAO's sample—were incorrectly coded as having used the urgency exception when they did not. GAO found that 20 of the 28 miscoded contracts were awarded using procedures that are more simple and separate from the requirements related to the use of the urgency exception. …
Date: March 26, 2014
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Federal Facility Security: Additional Actions Needed to Help Agencies Comply with Risk Assessment Methodology Standards (open access)

Federal Facility Security: Additional Actions Needed to Help Agencies Comply with Risk Assessment Methodology Standards

A letter report issued by the Government Accountability Office with an abstract that begins "Three of the nine selected agencies' risk assessment methodologies that GAO reviewed—the Department of Energy (DOE), the Department of Justice (DOJ), and the Department of State (State)—fully align with the Interagency Security Committee's (ISC) risk assessment standards, but six do not—the Department of the Interior (DOI), the Department of Veterans Affairs (VA), the Federal Protective Service (FPS), the Federal Emergency Management Agency (FEMA), the Nuclear Regulatory Commission (NRC), and the Office of Personnel Management (OPM). As a result, these six agencies may not have a complete understanding of the risks facing approximately 52,000 federal facilities and may be less able to allocate security resources cost-effectively at the individual facility level or across the agencies' facility portfolios. ISC's The Risk Management Process for Federal Facilities ( RMP ) standard requires that agencies' facility risk assessment methodologies must (1) consider all of the undesirable events identified in the RMP as possible risks to federal facilities, and (2) assess the threat, consequences, and vulnerability to specific undesirable events. Six of the nine agencies' methodologies GAO reviewed do not align with ISC's standards because the methodologies do not (1) consider …
Date: March 5, 2014
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Federal Rulemaking: Regulatory Review Processes Could Be Enhanced (open access)

Federal Rulemaking: Regulatory Review Processes Could Be Enhanced

A letter report issued by the Government Accountability Office with an abstract that begins "In 2007, GAO found that agencies had conducted more retrospective reviews of the costs and benefits of existing regulation than was readily apparent, especially to the public. Requirements in statutes or executive directives were sometimes the impetus for reviews, but agencies more often conducted these retrospective reviews based on their own discretionary authorities. Agencies reported that discretionary reviews more often generated actions, such as amending regulations or changes to guidance. GAO also found that multiple factors, such as data limitations and lack of transparency, impeded agencies' reviews. GAO made 7 recommendations in 2007 to improve the effectiveness and transparency of retrospective regulatory reviews. Among GAO's recommendations were: minimum standards for documenting and reporting completed review results; including public input as a factor in regulatory review decisions; and consideration of how agencies will measure the performance of new regulations. In 2011 and 2012, the administration issued new directives to agencies on how they should plan and conduct analyses of existing regulations that addressed each of GAO's recommendations."
Date: March 11, 2014
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Federal Student Loans: Better Oversight Could Improve Defaulted Loan Rehabilitation (open access)

Federal Student Loans: Better Oversight Could Improve Defaulted Loan Rehabilitation

A letter report issued by the Government Accountability Office with an abstract that begins "The Department of Education (Education) relies on collection agencies to assist borrowers in rehabilitating defaulted student loans, which allows borrowers who make nine on-time monthly payments within 10 months to have the default removed from their credit reports. Education works with 22 collection agencies to locate borrowers and explain repayment options, including rehabilitation. From fiscal years 2011 to 2013, Education collected about $9 billion on over 1.5 million loans through rehabilitation, most of which was recovered by collection agencies."
Date: March 6, 2014
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Financial Audit: Federal Deposit Insurance Corporation Funds' 2013 and 2012 Financial Statements (open access)

Financial Audit: Federal Deposit Insurance Corporation Funds' 2013 and 2012 Financial Statements

A letter report issued by the Government Accountability Office with an abstract that begins "In GAO's opinion, the Federal Deposit Insurance Corporation (FDIC) fairly presented, in all material respects, the 2013 and 2012 financial statements for the two funds it administers—the Deposit Insurance Fund (DIF) and the FSLIC Resolution Fund (FRF). Also, in GAO's opinion, FDIC maintained, in all material respects, effective internal control over financial reporting relevant to the DIF and to the FRF as of December 31, 2013. Further, GAO did not find any reportable instances of noncompliance with provisions of applicable laws, regulations, contracts, and grant agreements it tested."
Date: March 13, 2014
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
International Food Aid: Better Agency Collaboration Needed to Assess and Improve Emergency Food Aid Procurement System (open access)

International Food Aid: Better Agency Collaboration Needed to Assess and Improve Emergency Food Aid Procurement System

A letter report issued by the Government Accountability Office with an abstract that begins "Although the U.S. Department of Agriculture (USDA) and U.S. Agency for International Development (USAID) jointly manage international emergency food aid procurement, the agencies disagree about the usefulness of the Web Based Supply Chain Management system (WBSCM) to manage the entire process. WBSCM had significant deficiencies when it was implemented in April 2011, which led USAID to discontinue using it to procure ocean freight for bulk commodities, manage prepositioned or stockpiled commodity inventory, and track food aid shipments. For example, WBSCM was slow and time consuming to use and its process to procure ocean freight for bulk commodities was not compatible with USAID's process to negotiate contracts with ocean freight vendors. USDA currently uses WBSCM to procure food aid commodities, while USAID procures ocean freight using other systems not connected to WBSCM. Since March 2012, USDA has made changes to WBSCM, and USDA officials assert that these changes address some of the problems that led to USAID's decision to discontinue use of the system."
Date: March 26, 2014
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
International Food Aid: Prepositioning Speeds Delivery of Emergency Aid, but Additional Monitoring of Time Frames and Costs Is Needed (open access)

International Food Aid: Prepositioning Speeds Delivery of Emergency Aid, but Additional Monitoring of Time Frames and Costs Is Needed

A letter report issued by the Government Accountability Office with an abstract that begins "The U.S. Agency for International Development (USAID) reduces the average delivery time frame for emergency food aid by prepositioning food domestically—that is, in warehouses in the United States—and overseas. GAO estimates that compared with USAID's standard shipping process, which can take several months, prepositioning food aid shortened delivery time frames by an average of almost a month for shipments to the World Food Program (WFP). GAO also estimates that prepositioning shortened delivery time frames by an average of more than 2 months for other organizations—“cooperating sponsors”—that receive USAID grants. In addition, USAID reduces delivery time frames when it diverts shipments en route to overseas prepositioning warehouses to areas with immediate needs. For all cooperating sponsors, GAO estimates that diversions saved, on average, about 2 months."
Date: March 5, 2014
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Joint Professional Military Education: Opportunities Exist for Greater Oversight and Coordination of Associated Research Institutions (open access)

Joint Professional Military Education: Opportunities Exist for Greater Oversight and Coordination of Associated Research Institutions

A letter report issued by the Government Accountability Office with an abstract that begins "Joint Professional Military Education (JPME) research institutions, particularly at the National Defense University, experienced growth in number, funding, and size in terms of staffing levels from fiscal year (FY) 2007 through FY 2011, but the number of institutions as well as funding and staffing levels declined over the past 2 years. For example, total funding for JPME research institutions increased from $30.8 million in FY 2007 to $47.7 million in FY 2011, but subsequently decreased to $40.6 million in FY 2013. GAO identified several factors that contributed to these institutions' growth, including increases in funding provided by outside organizations for research and the creation of new research institutions. Department of Defense (DOD) officials reported that DOD-wide budget reductions, including the effects of sequestration, contributed to decreases in the number, size, and funding for JPME research institutions."
Date: March 10, 2014
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Major Automated Information Systems: Selected Defense Programs Need to Implement Key Acquisition Practices (open access)

Major Automated Information Systems: Selected Defense Programs Need to Implement Key Acquisition Practices

A letter report issued by the Government Accountability Office with an abstract that begins "Of the 15 selected Department of Defense (DOD) major automated information system (MAIS) programs, 13 had cost information available (2 did not, due to revisions to requirements and changes in scope). Of these 13 programs, 11 experienced changes in their cost estimates, including 7 that experienced increases ranging from 4 to 2,233 percent and 4 that experienced decreases ranging from 4 to 86 percent. Two programs remained unchanged in their cost goals. Additionally, of 14 programs that had schedule information available (1 did not due to revisions to requirements), 13 experienced schedule changes—including 12 that had slippages ranging from a few months to 6 years, and 1 that accelerated its schedule. One program remained on schedule. Further, of 11 programs that had system performance data available, 3 programs met their system performance targets, while 8 did not fully meet their targets."
Date: March 27, 2014
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Manufacturing Extension Partnership: Most Federal Spending Directly Supports Work with Manufacturers, but Distribution Could Be Improved (open access)

Manufacturing Extension Partnership: Most Federal Spending Directly Supports Work with Manufacturers, but Distribution Could Be Improved

A letter report issued by the Government Accountability Office with an abstract that begins "Of the approximately $608 million spent by the Department of Commerce's (Commerce) National Institute of Standards and Technology (NIST) in fiscal years 2009 through 2013 on the Manufacturing Extension Partnership (MEP) program, NIST used most of the funds to directly support MEP centers. Specifically, NIST spent about $495 million on awards to centers and spent the rest on contracts, staff, agency-wide overhead charges, and other items, some of which NIST considered direct support and some of which NIST considered administrative spending. Although NIST is not required to track, and has not historically tracked, administrative spending, NIST officials told GAO the agency developed definitions of direct support and administrative spending in fiscal year 2013 in response to congressional interest, then conducted an analysis of fiscal year 2013 federal MEP program spending using those definitions. NIST defines direct support spending as spending that directly supports the MEP center system's work with manufacturing firms, such as awards to centers or contracts to train MEP center staff on how to quickly assess innovative ideas for new products. NIST considers all other spending to be administrative, including spending on performance evaluations …
Date: March 27, 2014
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Maritime Infrastructure: Key Issues Related to Commercial Activity in the U.S. Arctic over the Next Decade (open access)

Maritime Infrastructure: Key Issues Related to Commercial Activity in the U.S. Arctic over the Next Decade

A letter report issued by the Government Accountability Office with an abstract that begins "Commercial U.S. Arctic maritime activities are expected to be limited for the next 10 years, according to industry representatives, due to a variety of factors. Interviews with industry representatives highlighted a variety of general challenges related to operating in the Arctic, such as geography, extreme weather, and hard-to-predict ice floes. Industry-specific factors were also cited as contributing to limited commercial activity. For example, shipping companies noted higher costs with Arctic transit; cruise industry groups noted a lack of demand for Arctic cruises from the mainstream cruise-consumer base, and oil companies last drilled offshore exploratory wells in the U.S. Arctic in 2012."
Date: March 19, 2014
Creator: United States. Government Accountability Office.
System: The UNT Digital Library