Month

4 Matching Results

Results open in a new window/tab.

Stamey Construction Company

Caption says, "5-AL-879. Specifications No. 1899. View of finishing and shaping plough designed in the Stamey Construction Company shops and to be used in completing the latter stage of lateral excavation and shaping of side slopes. This plough is designed for 3-foot bottom ditches only."
Date: March 18, 1948
Creator: Vaughan, R. O.
System: The Gateway to Oklahoma History

Siphon and Backfilling Operations

Caption says, "5-AL-873. Specifications No. 1811. View of complete 48" precast pipe siphon and backfilling operations at Station 313+05 on Altus 17.6 Lateral."
Date: March 17, 1948
Creator: Vaughan, R. O.
System: The Gateway to Oklahoma History

Stamey Construction Company

Caption says, "5-AL-880. Specifications No. 1899. View of another of Stamey Construction Company's ploughs in operation on Altus 21.5d Lateral at approximately Station 147+25. This plough is designed for only 4-foot bottom ditches."
Date: March 18, 1948
Creator: Vaughan, R. O.
System: The Gateway to Oklahoma History

Box Siphon

Caption says, "5-AL-874. Specifications No. 1899. View, looking downstream, of 4.5 x 4.5 box siphon under the A. T. & S. F. Railway at Station 40+11 on Altus 21.5 Lateral."
Date: March 17, 1948
Creator: Vaughan, R. O.
System: The Gateway to Oklahoma History