3 Matching Results
Results open in a new window/tab.
Results:
1 - 3 of
3
Plutonium Recycle Test Reactor Mechanical Seal Pump Operating Experience: August 1960 Through November 1962
Report documenting experience gained by operating the spare PRTR Primary Process Pump. This includes descriptions of equipment used, testing procedures, and operating history.
Date:
March 1963
Creator:
Scott, P. A.
System:
The UNT Digital Library
Specifications for Vibrationally Compacted UO2 Nested Tubular Fuel Element (PRTR MARK II-C)
Report describing the vibrationally compacted UO2 nested tubular fuel element, its design specifications, fabrication, and assembly.
Date:
March 1963
Creator:
Milhollen, M. K.
System:
The UNT Digital Library
High Temperature Short-Time, Uranium Carbide-Metal Reactions
Report investigating the compatibility of uranium carbide with tungsten, tantalum, molybdenum, Zircaloy-2, AISI 304L SS, Inconel, Hastelloy F, niobium-1% Zr, and niobium-33% Ta-1% Zr. These pairs were heated together at 1000 C and above for ten minutes.
Date:
March 1963
Creator:
Christensen, J. A.
System:
The UNT Digital Library