Automatic Mass Spectrometer for Isotopic Analysis of Lithium (open access)

Automatic Mass Spectrometer for Isotopic Analysis of Lithium

Report discussing an improvement program on lithium mass spectrometers.
Date: March 15, 1962
Creator: McBryde, W. T. & Gammon, E. F.
System: The UNT Digital Library
Hazards Report for SM-1 Core II With the SM-1 Core II With the Silver-Cadmium-Indium Control Rod Absorber Section (open access)

Hazards Report for SM-1 Core II With the SM-1 Core II With the Silver-Cadmium-Indium Control Rod Absorber Section

Abstract: In the March-April 1962 shutdown of SM-1 Core II, the SM-28 element will be re-inserted in SM-1 Core II and an SM-1 Core I element will be removed. An SM-1 Core II europium absorber will be replaced by a Ag-Cd-In absorber, and surveillance specimens will be inserted above the core support structure. Analysis of these changes concludes that re-insertion of the SM-2B stationary element and insertion of surveillance specimens do not affect hazards potential previously defined for SM-1. Replacement of the europium absorber by the Ag-Cd-In absorber will have negligible effect on reactivity control worth of the rod. The absorber meat section is encapsulated to prevent exposure of silver alloy to the primary coolant; postulated release of silver due to a cladding defect, after 2 years irradiation in SM-1, would not cause a hazard such as to restrict access to the vapor container. Possibility of steam formation in the air gap between the absorber core and cladding, causing a cladding failure, is remote. Deformation of the absorber section sufficient to cause the rod to stick, would not impair the ability of the other rods to shut down the reactor safely.
Date: March 15, 1962
Creator: Stephenson, L. D.
System: The UNT Digital Library
Specifications for Swaged UO2 19-Rod Cluster, PRTR Fuel Element Mark 1 (open access)

Specifications for Swaged UO2 19-Rod Cluster, PRTR Fuel Element Mark 1

Specifications including detail dimension, materials, fabrication steps, acceptance criteria, and final assembly steps for the swaged uranium dioxide, 19-rod cluster Plutonium Recycle Test Reactor fuel element.
Date: March 15, 1960
Creator: Millhollen, M. K.
System: The UNT Digital Library
Zero Power Experiments for the SM-1 Core II : Task XV (open access)

Zero Power Experiments for the SM-1 Core II : Task XV

Abstract: An element by element reactivity check for SM-1 Core II fuel elements and control rod absorber sections was performed and the burnable nuclear poison loading in the SM-1 Core II stationary fuel elements was established. An approach to criticality of the SM-1 Core II was performed by the inverse multiplication method and the critical rod bank position obtained as a function of fuel loading up to the full SM-1 Core II loading. Maximum and minimum core reactivity measurements were obtained by selective loading of stationary fuel elements and the total "excess K" for the core established. Power distribution measurements in the region of the core-reflector interface and the fuel-absorber interface in the control rod assemblies were performed. The effectiveness of europium flux suppressors in the top of control rod fuel elements and the power peaking in stationary elements adjacent to water gaps in control rod assemblies were measured. Survey measurements established the worth of spiking cold clean SM-1 cores with SM-2 elements, and of water holes in the SM-1 core which might be utilized as flux traps for materials irradiation.
Date: March 15, 1960
Creator: Robinson, R. A.; Weiss, S. H.; McCool, W. J. & Schrader, E. W.
System: The UNT Digital Library