Corrosion Data From the ORNL Purex Pilot Plant Acid Recovery Equipment (open access)

Corrosion Data From the ORNL Purex Pilot Plant Acid Recovery Equipment

From abstract: "This report summarizes the corrosion data obtained for nine construction materials located throughout the ORNL Purex Pilot Plant Acid Recovery Unit during seven hundred hours of operation."
Date: March 25, 1952
Creator: Landry, J. W. & Ullmann, J. W.
System: The UNT Digital Library
Compatibility Tests of Various Materials in Molten Sodium (open access)

Compatibility Tests of Various Materials in Molten Sodium

Several compatibility test of various materials in contact in sodium under 500 psi pressure were conducted for 716 hr at 1500 F. Of the diffusion couples studies, the Inconel-beryllium system showed the largest amount al alloying. The reaction between molybdenum and beryllium resulted in the formation of two compounds, both of which were severely cracked in several areas. The molybdenum-INOR #8, and the INOR #8p type 316 stainless steel interfaces showed little if any alloying.
Date: March 25, 1957
Creator: Carlander, R. & Hoffman, E. E.
System: The UNT Digital Library