Texas Attorney General Opinion: WW-1280 (open access)

Texas Attorney General Opinion: WW-1280

Document issued by the Office of the Attorney General of Texas in Austin, Texas, providing an interpretation of Texas law. It provides the opinion of the Texas Attorney General, Will Wilson, regarding a legal question submitted for clarification: Whether tax refund may be made on special fuel delivered by the user thereof into the fuel supply tank of a motor vehicle, under the provisions of Chap. 10 of Title 122A, Taxation-General.
Date: March 23, 1962
Creator: Texas. Attorney-General's Office.
Object Type: Text
System: The Portal to Texas History
Texas Attorney General Opinion: WW-1284 (open access)

Texas Attorney General Opinion: WW-1284

Document issued by the Office of the Attorney General of Texas in Austin, Texas, providing an interpretation of Texas law. It provides the opinion of the Texas Attorney General, Will Wilson, regarding a legal question submitted for clarification: Whether the Commissioner's Court of Jefferson County has the authority to retain legal counsel to defend certain members of a Grand Jury in cases brought against them under the stated facts.
Date: March 23, 1962
Creator: Texas. Attorney-General's Office.
Object Type: Text
System: The Portal to Texas History
Supplementary instructions and specifications for preparation of overbore fuel, PT-IP-381-A-FP (open access)

Supplementary instructions and specifications for preparation of overbore fuel, PT-IP-381-A-FP

Overbore fuel for charging under the proposed Plant Improvement Program is fabricated according to the standard ``F`` process with a few exceptions. Due to the size and weight of individual components and cores, it was necessary to modify the process and change several of the process times to produce a fuel of equal or better quality than standard production. The additions and modifications to the standard lead-dip fuel element manufacturing process are required for production of Model CVIN fuel elements and are discussed in this report.
Date: March 23, 1962
Creator: Strand, C. A.
Object Type: Report
System: The UNT Digital Library
SM-1 Reactor Vessel Closure Stud Investigation (open access)

SM-1 Reactor Vessel Closure Stud Investigation

Abstract: This report presents metallurgical .analyses and corrosion tests conducted to determine :causes of failure of two SM- 1 reactor vessel studs due to fracture in the threaded areas, after 23 months' operation (March 1959). Conclusions of corrosion tests are: (1) failure of the studs was caused by stress corrosion cracking, (2) contributing factors to failure of the studs were improper control of heat treatment of the studs and absence of treatment for stress relief after thread grinding operation.
Date: March 23, 1962
Creator: Reali, D. L.
Object Type: Report
System: The UNT Digital Library