Resource Type

Month

2 Matching Results

Results open in a new window/tab.

Argon Storage Dewar Initial Fill (open access)

Argon Storage Dewar Initial Fill

The argon storage dewar at the D0 Assembly Hall was filled with approximately 3100 gallons of high purity liquid argon for the first time on December 3,1990. The oxygen analyzer and high voltage test cell both indicated an oxygen impurity level between 0.4 and 0.5 ppm which is acceptable. The condenser and insulated piping sizing appears to be correct for a fill rate of a couple of hours. Insulation is required around the inlet to this piping in order to reduce the amount of filling time significantly. The graph of the level indication vs. volume of the dewar should be changed to reflect the apparent 5.2-5.4 in. offset. Another data point may be required to narrow this number down further. A majority of the time spent to fill the vessel was associated with the testing of the liquid-this time will shorten as we gain experience. Subsequent deliveries should be ordered to initiate as early in the morning as possible, this appears to be nearly an all day effort. The argon checked prior to delivery by us indicated that it was acceptable. The analysis of the argon purity that Linde provides us is merely a check that the liquid meets our …
Date: March 21, 1991
Creator: Dixon, K.
System: The UNT Digital Library
CC Operating Procedures (open access)

CC Operating Procedures

None
Date: March 21, 1991
Creator: Dixon, K.
System: The UNT Digital Library