Nuclear Prototype Power Plant Installation in Merchant Ships (open access)

Nuclear Prototype Power Plant Installation in Merchant Ships

Abstract: This report presents the results of a study performed by the Ford Instrument Company, Division of Sperry Rand Corporation, and its subcontractor, Maryland Shipbuilding & Drydock Company, for the Maritime Administration, U. S. Department of Commerce, under terms of Study Contract No. MA-1893, dated March 11, 1959. The purpose of this study is to evaluate various techniques for pretesting and installing nuclear prototype power plants in merchant ships and develop that technique offering the widest general application using time, cost and safety as essential criteria. Acknowledgement is made for the valuable counsel received from personnel of the American Bureau of Shipping, Isbrandtsen Company, Inc., Maritime Administration, Atomic Energy Commission, and the United States Coast Guard.
Date: March 11, 1959
Creator: Ford Instrument Company
System: The UNT Digital Library
Gas Plated Coatings on Metals and Alloys : Progress Report No. 1 (open access)

Gas Plated Coatings on Metals and Alloys : Progress Report No. 1

The object of this project is to conduct studies on the coating of metals and alloys by the gas plating process. Coatings to be studied consist of chromium on copper; alloys of nickel chromium on copper; molybdenum on stainless steel and Inconel; chromium on stainless steel and Inconel; and tungsten and molybdenum and their carbides on stainless steel and Inconel.
Date: March 11, 1953
Creator: Nack, Herman & Whitacre, John R.
System: The UNT Digital Library