Resource Type

378 Matching Results

Results open in a new window/tab.

HIVELITE propellant characterization (open access)

HIVELITE propellant characterization

None
Date: March 14, 1975
Creator: Finger, M. & Hayes, B.
System: The UNT Digital Library
Programmable control system for scanning cylindrical parts (open access)

Programmable control system for scanning cylindrical parts

None
Date: March 14, 1975
Creator: Neal, R. E.
System: The UNT Digital Library
LITHIUM HYDRIDE PROPERTIES (open access)

LITHIUM HYDRIDE PROPERTIES

A tabulation is presented of values for selected properties of lithium hydride. (M.C.G.)
Date: March 14, 1961
Creator: Welch, F.H.
System: The UNT Digital Library
Kilowatt Isotope Power System: component test procedure for the ground demonstration system jet condenser focusing. 77-KIPS-59. Revision A (open access)

Kilowatt Isotope Power System: component test procedure for the ground demonstration system jet condenser focusing. 77-KIPS-59. Revision A

This test procedure (No. 404A) provides a detailed description of the verification methods which shall be used in the development program to be conducted on the Kilowatt Isotope Power System (KIPS) Jet Condenser to fulfill the requirements of the Ground Demonstration Test Plan, Section 6.4. This is a revision of Test Procedure No. 404.
Date: March 14, 1978
Creator: unknown
System: The UNT Digital Library
Radiochemical Processing-Off-Site Transportation and Ultimate Storage Problems (open access)

Radiochemical Processing-Off-Site Transportation and Ultimate Storage Problems

Safe and economic methods of handling radioactive materials off-site are required for the successful operation of nuclear chemical plants. These occasions arise in the shipment of spent fuel, radioactive, isotopes, and liquid wastes. An unsolved problem exists in the development of techniques and sites for the final disposal of waste products. (auth)
Date: March 14, 1962
Creator: Blomeke, J. O. & Shappert, L. B.
System: The UNT Digital Library
Large area silicon sheet by EFG. Annual progress report, October 1, 1978-September 30, 1979 (open access)

Large area silicon sheet by EFG. Annual progress report, October 1, 1978-September 30, 1979

The progress which has been made in 1978/1979 to evolve systems designs for growth stations which produce multiple silicon ribbons by the EFG process is reported. This progress culminated in the demonstration of five ribbon multiple growth in May 1979 and in recent advances toward improved electronic quality of ribbons grown from these machines. These advances were made in large measure by studies in which the composition of the gas environment around the meniscus area was varied. By introducing gases such as CO/sub 2/, CO, and CH/sub 4/ into this region, reproducible increases in diffusion length and cell performance have been realized, with the best large area (5 cm x 10 cm) cells exceeding 11% (AM1) efficiency.
Date: March 14, 1980
Creator: unknown
System: The UNT Digital Library
OTEC cold water pipe design for problems caused by vortex-excited oscillations (open access)

OTEC cold water pipe design for problems caused by vortex-excited oscillations

Vortex-excited oscillations of marine structures result in reduced fatigue life, large hydrodynamic forces and induced stresses, and sometimes lead to structural damage and to diestructive failures. The cold water pipe of an OTEC plant is nominally a bluff, flexible cylinder with a large aspect ratio (L/D = length/diameter), and is likely to be susceptible to resonant vortex-excited oscillations. The objective of this report is to survey recent results pertaining to the vortex-excited oscillations of structures in general and to consider the application of these findings to the design of the OTEC cold water pipe. Practical design calculations are given as examples throughout the various sections of the report. This report is limited in scope to the problems of vortex shedding from bluff, flexible structures in steady currents and the resulting vortex-excited oscillations. The effects of flow non-uniformities, surface roughness of the cylinder, and inclination to the incident flow are considered in addition to the case of a smooth cyliner in a uniform stream. Emphasis is placed upon design procedures, hydrodynamic coefficients applicable in practice, and the specification of structural response parameters relevant to the OTEC cold water pipe. There are important problems associated with in shedding of vortices from cylinders …
Date: March 14, 1980
Creator: Griffin, O. M.
System: The UNT Digital Library
Concentrations of dissolved methane (CH sub 4 ) and nitrogen (N sub 2 ) in groundwaters from the Hanford Site, Washington (open access)

Concentrations of dissolved methane (CH sub 4 ) and nitrogen (N sub 2 ) in groundwaters from the Hanford Site, Washington

This document reports all available dissolved gas concentration data for groundwaters from the Hanford Site as of June 1985. Details of the computational procedures required to reduce data obtained from the field measurements made by the Basalt Waste Isolation Project are provided in the appendix. Most measured values for methane concentration from reference repository boreholes are in the range of from 350 to 700 mg/L for the Cohassett flow top. Because of the uncertainties associated with these measurements, it is currently recommended that a conservative methane concentration of 1200 mg/L (methane saturated) in groundwater be considered the most reasonable upper-bounding value. 16 refs., 2 figs., 2 tabs.
Date: March 14, 1986
Creator: Early, T.O.
System: The UNT Digital Library
Portable Mercury Vapor Detector (open access)

Portable Mercury Vapor Detector

From abstract: "This report describes a functional mercury vapor detector which is a portable, self-contained, survey instrument, and had a minimum range from zero to two-tenths milligram of mercury per cubic meter of air."
Date: March 14, 1958
Creator: McMurray, C. S. & Redmond, J. W.
System: The UNT Digital Library
Homeland Security: Voluntary Initiatives Are Under Way at Chemical Facilities, but the Extent of Security Preparedness Is Unknown (open access)

Homeland Security: Voluntary Initiatives Are Under Way at Chemical Facilities, but the Extent of Security Preparedness Is Unknown

A letter report issued by the General Accounting Office with an abstract that begins "The events of September 11, 2001, triggered a national re-examination of the security of thousands of industrial facilities that use or store hazardous chemicals in quantities that could potentially put large numbers of Americans at risk of serious injury or death in the event of a terrorist-caused chemical release. GAO was asked to examine (1) available information on the threats and risks from terrorism faced by U.S. chemical facilities; (2) federal requirements for security preparedness and safety at facilities; (3) actions taken by federal agencies to assess the vulnerability of the industry; and (4) voluntary actions the chemical industry has taken to address security preparedness, and the challenges it faces in protecting its assets and operations."
Date: March 14, 2003
Creator: United States. General Accounting Office.
System: The UNT Digital Library
Governmentwide Purchase Cards: Actions Needed to Strengthen Internal Controls to Reduce Fraudulent, Improper, and Abusive Purchases (open access)

Governmentwide Purchase Cards: Actions Needed to Strengthen Internal Controls to Reduce Fraudulent, Improper, and Abusive Purchases

A letter report issued by the Government Accountability Office with an abstract that begins "Over the past several years, GAO has issued numerous reports and testimonies on internal control breakdowns in certain individual agencies' purchase card programs. In light of these findings, GAO was asked to analyze purchase card transactions governmentwide to (1) determine whether internal control weaknesses existed in the government purchase card program and (2) if so, identify examples of fraudulent, improper, and abusive activity. GAO used statistical sampling to systematically test internal controls and data mining procedures to identify fraudulent, improper, and abusive activity. GAO's work was not designed to determine the overall extent of fraudulent, improper, or abusive transactions."
Date: March 14, 2008
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Lead In Tap Water: CDC Public Health Communications Need Improvement (open access)

Lead In Tap Water: CDC Public Health Communications Need Improvement

A letter report issued by the Government Accountability Office with an abstract that begins "In February 2004, the Centers for Disease Control and Prevention (CDC) was asked to assess the effects of elevated lead levels in tap water on Washington, D.C., residents. In April 2004, CDC published the results. However, an inaccurate statement and incomplete descriptions of the limitations of the analyses resulted in confusion about CDC's intended message. GAO was asked to examine (1) CDC's actions to clarify its published results and communicate current knowledge about the contribution of lead in tap water to elevated blood lead levels (BLL) in children and (2) CDC's changes to its procedures to improve the clarity of the information in its public health communications. GAO reviewed CDC communication policies and procedures and interviewed CDC officials."
Date: March 14, 2011
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Puerto Rico: Characteristics of the Island's Maritime Trade and Potential Effects of Modifying the Jones Act (open access)

Puerto Rico: Characteristics of the Island's Maritime Trade and Potential Effects of Modifying the Jones Act

A letter report issued by the Government Accountability Office with an abstract that begins "Jones Act requirements have resulted in a discrete shipping market between Puerto Rico and the United States. Most of the cargo shipped between the United States and Puerto Rico is carried by four Jones Act carriers that provide dedicated, scheduled weekly service using containerships and container barges. Although some vessels are operating beyond their expected useful service life, many have been reconstructed or refurbished. Jones Act dry and liquid bulkcargo vessels also operate in the market, although some shippers report that qualified bulk-cargo vessels may not always be available to meet their needs. Cargo moving between Puerto Rico and foreign destinations is carried by numerous foreign-flag vessels, often with greater capacity, and typically as part of longer global trade routes. Freight rates are determined by a number of factors, including the supply of vessels and consumer demand in the market, as well as costs that carriers face to operate, some of which (e.g., crew costs) are affected by Jones Act requirements. The average freight rates of the four major Jones Act carriers in this market were lower in 2010 than they were in 2006, which was …
Date: March 14, 2013
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Tactical Aircraft: DOD Should Reconsider Decision to Increase F/A-22 Production Rates While Development Risks Continue (open access)

Tactical Aircraft: DOD Should Reconsider Decision to Increase F/A-22 Production Rates While Development Risks Continue

A letter report issued by the General Accounting Office with an abstract that begins "The Air Force is developing the F/A-22 aircraft to fly at higher speeds for longer distances, be less detectable, and improve the pilot's awareness of the surrounding situation. The F/A-22 will replace the Air Force's existing fleet of F-15 aircraft. Over the past several years the program has experienced significant cost overruns and schedule delays. Congress mandated that GAO assess the development program and determine whether the Air Force is meeting key performance, schedule, and cost goals. GAO also assessed the implications of the progress of the development program on production."
Date: March 14, 2003
Creator: United States. General Accounting Office.
System: The UNT Digital Library
Information Technology: Customs Automated Commercial Environment Program Progressing, but Need for Management Improvements Continues (open access)

Information Technology: Customs Automated Commercial Environment Program Progressing, but Need for Management Improvements Continues

A letter report issued by the Government Accountability Office with an abstract that begins "The Department of Homeland Security (DHS) is conducting a multiyear, multibillion-dollar acquisition of a new trade processing system, planned to support the movement of legitimate imports and exports and strengthen border security. By congressional mandate, plans for expenditure of appropriated funds on this system, the Automated Commercial Environment (ACE), must meet certain conditions, including GAO review. This study addresses whether the fiscal year 2005 plan satisfies these conditions, describes the status of DHS's efforts to implement prior GAO recommendations for improving ACE management, and provides observations about the plan and DHS's management of the program."
Date: March 14, 2005
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Defense Acquisitions: Improved Business Case Is Needed for Future Combat System's Successful Outcome (open access)

Defense Acquisitions: Improved Business Case Is Needed for Future Combat System's Successful Outcome

A letter report issued by the Government Accountability Office with an abstract that begins "The Department of Defense (DOD) anticipates that the Future Combat System (FCS) will modernize the U.S. Army's ability to move, shoot, and communicate on the battlefield. It is an impressive concept that is the product of holistic, non-traditional thinking. The Army describes FCS as one of the most complex weapon acquisition programs ever executed because it involves developing and integrating a family of 18 systems and an information network. Army leadership started the program early as part of its effort to change Army culture and believes that the program risks are manageable. GAO is required by law to review the program annually. In this report, GAO analyzes FCS's acquisition business case and assesses requirements stability, technology maturity, soundness of the acquisition strategy, and reasonableness and affordability of program costs."
Date: March 14, 2006
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Pesticides: Improvements Needed to Ensure the Safety of Farmworkers and Their Children (open access)

Pesticides: Improvements Needed to Ensure the Safety of Farmworkers and Their Children

A letter report issued by the General Accounting Office with an abstract that begins "Pursuant to a congressional request, GAO provided information on issues related to the safety of children who may be exposed to pesticides in agricultural settings, focusing on: (1) what federal requirements govern the safe use of pesticides, particularly as they relate to protecting children in agricultural settings; (2) what information is available on the acute and chronic effects of agricultural pesticide exposure, particularly on children; and (3) what the Environmental Protection Agency (EPA) has done to ensure that its Worker Protection Standard considers the needs of children and is being adequately implemented and enforced."
Date: March 14, 2000
Creator: United States. General Accounting Office.
System: The UNT Digital Library
Freedom of Information Act: Agencies Are Making Progress in Reducing Backlog, but Additional Guidance Is Needed (open access)

Freedom of Information Act: Agencies Are Making Progress in Reducing Backlog, but Additional Guidance Is Needed

A letter report issued by the Government Accountability Office with an abstract that begins "Under the Freedom of Information Act (FOIA), federal agencies must generally provide access to their information, enabling the public to learn about government operations and decisions. To help ensure proper implementation, the act requires that agencies report annually to the Attorney General on their processing of FOIA requests. For fiscal year 2006, agencies were also to report on their progress in implementing plans to improve FOIA operations, as directed by a December 2005 Executive Order. A major goal of the order was reducing backlogs of overdue FOIA requests (the statute requires an agency to respond to requests within 20 or, in some cases, 30 working days with a determination on whether it will provide records). For this study, GAO was asked, among other things, to determine trends in FOIA processing and agencies' progress in addressing backlogs of overdue FOIA requests since implementing their improvement plans. To do so, GAO analyzed 21 agencies' annual reports and additional statistics."
Date: March 14, 2008
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Defense Acquisitions: Progress Made in Fielding Missile Defense, but Program Is Short of Meeting Goals (open access)

Defense Acquisitions: Progress Made in Fielding Missile Defense, but Program Is Short of Meeting Goals

A letter report issued by the Government Accountability Office with an abstract that begins "By law, GAO annually assesses the Missile Defense Agency's (MDA) progress in developing and fielding a Ballistic Missile Defense System (BMDS). Funded at $8 billion to nearly $10 billion per year, it is the largest research and development program in the Department of Defense (DOD). The program has been managed in 2-year increments, known as blocks. Block 2006, the second BMDS block, was completed in December 2007. GAO assessed MDA's progress in (1) meeting Block 2006 goals for fielding assets, completing work within estimated cost, conducting tests, and demonstrating the performance of the overall system in the field, and (2) making managerial improvements to transparency, accountability, and oversight. In conducting the assessment, GAO reviewed the assets fielded; contractor cost, schedule, and performance; and tests completed during 2007. GAO also reviewed pertinent sections of the U.S. Code, acquisition policy, and the charter of a new missile defense board."
Date: March 14, 2008
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Defense Acquisitions: Termination Costs Are Generally Not a Compelling Reason to Continue Programs or Contracts That Otherwise Warrant Ending (open access)

Defense Acquisitions: Termination Costs Are Generally Not a Compelling Reason to Continue Programs or Contracts That Otherwise Warrant Ending

A letter report issued by the Government Accountability Office with an abstract that begins "The nation's long-term fiscal imbalances will likely make DOD's $1.6 trillion planned investment in new weapon systems unsustainable. Thus, it is critical that DOD retains the flexibility to end programs and contracts when necessary and appropriate. Although the federal government generally has the legal right to terminate contracts for convenience, defense stakeholders have sometimes expressed concerns that it will cost more to terminate a contract than to complete it. To address this perception, GAO examined (1) how expected contract termination costs and other factors affect DOD decisions on whether to end programs and contracts; (2) the circumstances under which it would cost more to terminate a contract for convenience than to complete it; and (3) the options DOD has for retaining value or reducing costs, when DOD ends programs or contracts. To do this, GAO examined DOD data on terminated contracts over $100 million; reviewed laws, regulations, and guidance; and met with key DOD officials."
Date: March 14, 2008
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Traffic Safety: Grants Generally Address Key Safety Issues, Despite State Eligibility and Management Difficulties (open access)

Traffic Safety: Grants Generally Address Key Safety Issues, Despite State Eligibility and Management Difficulties

A letter report issued by the Government Accountability Office with an abstract that begins "In 2005, the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) included authorizations of nearly $2.2 billion for safety incentive grant programs to assist states in their efforts to reduce traffic fatalities. Administered by the Department of Transportation's (DOT) National Highway Traffic Safety Administration (NHTSA), five of these programs provide incentive grants to states to implement legislation governing the use of safety belts and child safety seats, and promote activities to reduce alcohol-impaired driving, improve motorcycle training and awareness, and improve traffic safety information systems. To help Congress prepare for the reauthorization of the surface transportation programs in 2009, this report provides information on (1) NHTSA's status in awarding and overseeing states' use of these five grants programs, (2) activities states have conducted using the grants and issues they have faced in applying for and implementing the grants, and (3) how NHTSA plans to evaluate the results of the grant programs and implications for reauthorizing the programs. To conduct this work, GAO interviewed DOT and state officials, analyzed safety reports from 50 states, and analyzed grant data from DOT and 7 selected …
Date: March 14, 2008
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Joint Strike Fighter: Management of the Technology Transfer Process (open access)

Joint Strike Fighter: Management of the Technology Transfer Process

A letter report issued by the Government Accountability Office with an abstract that begins "The Joint Strike Fighter (JSF) program is the Department of Defense's (DOD) largest international cooperative effort to develop and produce a major weapon system. Due to the breadth of international participation, the number of export authorizations needed to share information with partner governments, solicit bids from suppliers, and execute contracts is expected to far exceed past transfers of advanced military technology. In July 2003, GAO reported that managing these transfers and partner expectations while avoiding delays has been a key challenge and recommended that industrial planning tools be developed and used to anticipate time frames for national disclosure and technology transfer decisions. This report examines DOD's response to this recommendation and identifies the practices DOD is using to expedite license processing and avoid program delays."
Date: March 14, 2006
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Petroleum Refining: Industry's Outlook Depends on Market Changes and Key Environmental Regulations (open access)

Petroleum Refining: Industry's Outlook Depends on Market Changes and Key Environmental Regulations

A letter report issued by the Government Accountability Office with an abstract that begins "Stakeholders GAO contacted and information reviewed by GAO identified the following three major changes that have recently affected the domestic petroleum refining industry:"
Date: March 14, 2014
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Nuclear Power Plants: Efforts Made to Upgrade Security, but the Nuclear Regulatory Commission's Design Basis Threat Process Should Be Improved (open access)

Nuclear Power Plants: Efforts Made to Upgrade Security, but the Nuclear Regulatory Commission's Design Basis Threat Process Should Be Improved

A letter report issued by the Government Accountability Office with an abstract that begins "The nation's commercial nuclear power plants are potential targets for terrorists seeking to cause the release of radioactive material. The Nuclear Regulatory Commission (NRC), an independent agency headed by five commissioners, is responsible for regulating and overseeing security at the plants. In April 2003, in response to the terrorist attacks of September 11, 2001, NRC revised the design basis threat (DBT), which describes the threat that plants must be prepared to defend against in terms of the number of attackers and their training, weapons, and tactics. NRC has also restructured its program for testing security at the plants through force-on-force inspections, which consist of mock terrorist attacks. GAO was asked to review (1) the process NRC used to revise the DBT for nuclear power plants, (2) the actions nuclear power plants have taken to enhance security in response to the revised DBT, and (3) NRC's progress in strengthening the conduct of force-on-force inspections at the plants."
Date: March 14, 2006
Creator: United States. Government Accountability Office.
System: The UNT Digital Library