117 Matching Results

Results open in a new window/tab.

Panoramic View of Lugert Dam

Caption says, "A-52 Altus Project. Panoramic view No. 3 taken from top of mountain south of Lugert Dam showing area from east side of Lake Altus, town of Lugert, Santa Fe Railroad, and Oklahoma State Highway No. 283 to north end of mountain south of Lugert Butte and Lugert Dike area."
Date: February 4, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Panoramic View of Lugert Dam

Caption says, "A-53 Altus Project: Panoramic view No. 4 taken from top of mountain south of Lugert Dam showing area from mountain south of Lugert Butte to Rock Quarry on the south slope of Rattlesnake Mountain. Power line and telephone line to Rock Quarry shown in center of photograph."
Date: February 4, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Panoramic View of Lugert Dam

Caption says, "A-50 Altus Project. Panoramic view No. 1 from top of mountain south of Lugert Dam looking north showing area from Quartz Mountain Park, Sand Pit, CCC Camp to Lugert Dam. About four inches of water was flowing over the crest at the time the photograph was taken."
Date: February 4, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Panoramic View of Lugert Dam

Caption says, "A-51 Altus Project. Panoramic view No. 2 taken from top of mountain south of Lugert Dam showing area from Lugert Dam, the Narrows, to east side of Lake Altus. About four inches of water was flowing over the crest at the time the photograph was taken."
Date: February 4, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Proposed Lines

Caption says, "A-54 Altus Project. Photograph showing "B" proposed tunnel line, "S" proposed siphon line and "A" proposed tunnel line. "A" line was first proposed line through a high saddle south of the river. The tunnel line will pass under the North Fork of the Red River. Core drilling outfit is on Station 101 00 drill hole # 31, which was drilled 245 feet to approximate tunnel grade. No hard rock was reached when investigation was suspended."
Date: February 5, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Proposed Lines

Caption says, "A-55 Altus Project. Photograph taken from the ridge south of the North Fork of the Red River looking north between proposed tunnel lines "A" & "B" and siphon line "S"."
Date: February 5, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Panorama 1 of 11

Caption says, "A-569 North over Altus Project reservoir from Hicks Mountain. Panorama No. 1 of 11."
Date: February 2, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Panorama 2 of 11

Caption says, "Lake Altus and Vicinity, Dike, East - No. A-570 East Dike, sections A, B, C, and D, from Hicks Mountain. Panorama No. 2 of 11."
Date: February 2, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Panorama 2 of 11

Caption says, "A-570 East Dike, sections A, B, C, and D, from Hicks Mountain. Panorama No. 2 of 11."
Date: February 2, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Panorama 3 of 11

Caption says, "A-571 East Dike, sections A and B from Hicks Mountain. Panorama No. 3 of 11."
Date: February 2, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Panorama 4 of 11

Caption says, "A-572 Downstream area and drainage system of Lugert Dike. Panorama No. 4 of 11 from Hicks Mountain."
Date: February 2, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Panorama 5 of 11

Caption says, "Lake Altus and Vicinity, Dike, Lugert - No. A-573 Lugert Dike and upstream area from Hicks Mountain. Panorama No. 5 of 11."
Date: February 2, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Panorama 5 of 11

Caption says, "A-573 Lugert Dike and upstream area from Hicks Mountain. Panorama No. 5 of 11."
Date: February 2, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Panorama 6 of 11

Caption says, "A-574 Field office to Santa Fe Railroad cut from Hicks Mountain. Panorama No. 6 of 11."
Date: February 2, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Panorama 7 of 11

Caption says, "A-575 Santa Fe Railroad cut to North Dike from Hicks Mountain. Panorama No. 7 of 11."
Date: February 2, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Panorama 8 of 11

Caption says, "A-576 North Dike and Bureau Camp from Hicks Mountain. Panorama No. 8 of 11."
Date: February 2, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Panorama 8 of 11

Caption says, "Lake Altus and Vicinity, Dike, North - No. A-576 North Dike and Bureau Camp from Hicks Mountain. Panorama No. 8 of 11."
Date: February 2, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Panorama 9 of 11

Caption says, "A-577 Lookout Mountain in foreground from Hicks Mountain. Panorama No. 9 of 11. "
Date: February 2, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Panorama 10 of 11

Caption says, "A-578 Lakeside Addition from top of Hicks Mountain. Panorama No. 10 of 11."
Date: February 2, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Panorama 11 of 11

Caption says, "A-579 West side of Altus Project Reservoir from top of Hicks Mountain. Panorama No. 11 of 11."
Date: February 2, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Scale model of Altus Dam

Completed scale model of the dam. Caption says, "A-580 Final Design 1:60 scale model. The circular gates can be raised and lowered. All nine of them are raised in the picture. The right side of the dam has a spillway which is not controlled by the gates. A bridge will be built across the top, and will rest on pier in center of right hand side and on the piers between the gates. Original picture by Robert R. Edge, Hyd. Lab., Denver, Colo."
Date: February 2, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Dump Truck Moving Dirt

Caption says, "A-581 Euclid truck spreading embankment material on Highway No. 9 relocation, Station 594."
Date: February 4, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Laborers with a Jackhammer

Laborers working on the Altus highway and railroad relocation project. Caption says, "A-584 Jackhammer crew drilling area for blasting. Highway 44relocation, Station 66."
Date: February 4, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Powder Crew

Laborers working on the Altus highway and railroad relocation project. Caption says, "A-583 Powder crew loading holes on Highway 44 relocation, Station 64. Loaded and wired holes in foreground."
Date: February 4, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History