UMTRA Project Water Sampling and Analysis Plan, Durango, Colorado (open access)

UMTRA Project Water Sampling and Analysis Plan, Durango, Colorado

Surface remedial action has been completed at the Uranium Mill Tailings Remedial Action Project in Durango, Colorado. Contaminated soil and debris have been removed from the former processing site and placed in the Bodo Canyon disposal cell. Ground water at the former uranium mill/tailings site and raffinate pond area has been contaminated by the former milling operations. The ground water at the disposal site was not impacted by the former milling operations at the time of the cell`s construction. Activities for fiscal 1994 involve ground water sampling and site characterization of the disposal site.
Date: January 1, 1994
Creator: unknown
System: The UNT Digital Library