Resource Type

543 Matching Results

Results open in a new window/tab.

The Au Pair Program (open access)

The Au Pair Program

Legislation passed late in the 103rd Congress granted the U.S. Information Agency (USIA) authority to design and implement more rigorous rules regulating the au pair program. In 1997, the au pair program received considerable media attention as a result of the Louise Woodward court case regarding possible involvement of an au pair in the death of a child in Massachusetts. The U.S. Information Agency amended existing federal regulations for the au pair program in September 1997 to underscore the cultural exchange aspect of the program and strengthen au pair recruiting and training.
Date: January 30, 1998
Creator: Epstein, Susan B.
System: The UNT Digital Library
Investigations into the Early Life History of Naturally Spring Chinook Salmon in the Grande Ronde River Basin : Fish Research Project Oregon : Annual Progress Report Project Period 1 September 1997 to 31 August 1998. (open access)

Investigations into the Early Life History of Naturally Spring Chinook Salmon in the Grande Ronde River Basin : Fish Research Project Oregon : Annual Progress Report Project Period 1 September 1997 to 31 August 1998.

We determined migration timing and abundance of juvenile spring chinook salmon from three populations in the Grande Ronde River basin. We estimated 6,716 juvenile chinook salmon left upper rearing areas of the Grande Ronde River from July 1997 to June 1998; approximately 6% of the migrants left in summer, 29% in fall, 2% in winter, and 63% in spring. We estimated 8,763 juvenile chinook salmon left upper rearing areas of Catherine Creek from July 1997 to June 1998; approximately 12% of the migrants left in summer, 37% in fall, 21% in winter, and 29% in spring. We estimated 8,859 juvenile chinook salmon left the Grande Ronde Valley, located below the upper rearing areas in Catherine Creek and the Grande Ronde River, from October 1997 to June 1998; approximately 99% of the migrants left in spring. We estimated 15,738 juvenile chinook salmon left upper rearing areas of the Lostine River from July 1997 to April 1998; approximately 3% of the migrants left in summer, 61% in fall, 2% in winter, and 34% in spring. We estimated 22,754 juvenile spring chinook salmon left the Wallowa Valley, located below the mouth of the Lostine River, from September 1997 to April 1998; approximately 55% …
Date: January 1, 1998
Creator: Keefe, MaryLouise & Tranquilli, J. Vincent
System: The UNT Digital Library
Study of the characteristics of the charmonium 3P0 (chi0) state in the reaction p anti-p -> chi0 -> J/psi gamma -> e+- gamma (open access)

Study of the characteristics of the charmonium 3P0 (chi0) state in the reaction p anti-p -> chi0 -> J/psi gamma -> e+- gamma

None
Date: January 1, 1998
Creator: Pellicano, Paolo & U., /Turin
System: The UNT Digital Library
An Audit Report on The Implementation of House Bill 2377 and the Conversion of State-Operated Community Services to Local Control (open access)

An Audit Report on The Implementation of House Bill 2377 and the Conversion of State-Operated Community Services to Local Control

Report of the Texas State Auditor's Office related to evaluating plans for the House Bill 2377 pilot project, reviewing selected management controls at the community centers participating in the pilot, and evaluating the plans to convert the state-operated services to local control.
Date: January 1998
Creator: Texas. Office of the State Auditor.
System: The Portal to Texas History
An Audit Report on Managed Health Care at The Texas Department of Criminal Justice (open access)

An Audit Report on Managed Health Care at The Texas Department of Criminal Justice

Report of the Texas State Auditor's Office related to the implementation of a managed health care system by the Texas Department of Criminal Justice in order to control increasing costs of providing health care to inmates, and opportunities for improvement of the management controls in the prison health care system.
Date: January 1998
Creator: Texas. Office of the State Auditor.
System: The Portal to Texas History
An Audit Report on Management Controls at the Texas Water Development Board (open access)

An Audit Report on Management Controls at the Texas Water Development Board

Report of the Texas State Auditor's Office related to whether the Texas Water Development Board had established appropriate controls over policies, information, performance, and resources, specifically considering whether the Board is making progress toward goals and objectives, safeguards its assets uses them efficiently, complies with applicable laws and regulations, and maintains and reports reliable data.
Date: January 1998
Creator: Texas. Office of the State Auditor.
System: The Portal to Texas History
An Audit Report on Limited Reviews of Management Controls at the University of Texas at Austin (open access)

An Audit Report on Limited Reviews of Management Controls at the University of Texas at Austin

Report of the Texas State Auditor's Office related to a high-level assessment of key management control systems within The University of Texas at Austin, conducted to identify opportunities for improvement and determine established strengths.
Date: January 1998
Creator: Texas. Office of the State Auditor.
System: The Portal to Texas History
An Audit Report on Management Controls at Prairie View A&M University (open access)

An Audit Report on Management Controls at Prairie View A&M University

Report of the Texas State Auditor's Office related to several opportunities for Prairie View A&M University's (University) management to improve aspects of policy development and implementation; the management of personnel, revenues, and expenditures; and the accuracy and usefulness of data and performance information.
Date: January 1998
Creator: Texas. Office of the State Auditor.
System: The Portal to Texas History
An Audit Report on Petroleum Violation Escrow Funds Contract Administration at the State Energy Conservation Office of the General Services Commission (open access)

An Audit Report on Petroleum Violation Escrow Funds Contract Administration at the State Energy Conservation Office of the General Services Commission

Report of the Texas State Auditor's Office related to opportunities for the State Energy Conservation Office (Energy Office) of the General Services Commission to improve fiscal management of the LoanSTAR Revolving Loan Program to ensure that it meets statutory requirements, and to improve some of its contract administration practices.
Date: January 1998
Creator: Texas. Office of the State Auditor.
System: The Portal to Texas History
Spent nuclear fuel project product specification (open access)

Spent nuclear fuel project product specification

Product specifications are limits and controls established for each significant parameter that potentially affects safety and/or quality of the Spent Nuclear Fuel (SNF) packaged for transport to dry storage. The product specifications in this document cover the spent fuel packaged in MultiCanister Overpacks (MCOs) to be transported throughout the SNF Project. The SNF includes N Reactor fuel and single-pass reactor fuel. The FRS removes the SNF from the storage canisters, cleans it, and places it into baskets. The MCO loading system places the baskets into MCO/Cask assembly packages. These packages are then transferred to the Cold Vacuum Drying (CVD) Facility. After drying at the CVD Facility, the MCO cask packages are transferred to the Canister Storage Building (CSB), where the MCOs are removed from the casks, staged, inspected, sealed (by welding), and stored until a suitable permanent disposal option is implemented. The key criteria necessary to achieve these goals are documented in this specification.
Date: January 30, 1998
Creator: Pajunen, A. L.
System: The UNT Digital Library
TWRS retrieval and storage mission, immobilized low-activity waste disposal plan (open access)

TWRS retrieval and storage mission, immobilized low-activity waste disposal plan

The TWRS mission is to store, treat, and immobilize highly radioactive Hanford waste (current and future tank waste and the encapsulated cesium and strontium) in a safe, environmentally sound, and cost-effective manner (TWRS JMN Justification for mission need). The mission includes retrieval, pretreatment, immobilization, interim storage and disposal, and tank closure. As part of this mission, DOE has established the TWRS Office to manage all Hanford Site tank waste activities. The TWRS program has identified the need to store, treat, immobilize, and dispose of the highly radioactive Hanford Site tank waste and encapsulated cesium and strontium materials in an environmentally sound, safe, and cost-effective manner. To support environmental remediation and restoration at the Hanford Site a two-phase approach to using private contractors to treat and immobilize the low-activity and high-level waste currently stored in underground tanks is planned. The request for proposals (RFP) for the first phase of waste treatment and immobilization was issued in February 1996 (Wagoner 1996) and initial contracts for two private contractor teams led by British Nuclear Fuels Ltd. and Lockheed-Martin Advanced Environmental Services were signed in September 1996. Phase 1 is a proof-of-concept and commercial demonstration effort to demonstrate the technical and business feasibility of …
Date: January 7, 1998
Creator: Shade, J. W.
System: The UNT Digital Library
Tank waste remediation system retrieval and disposal mission key enabling assumptions (open access)

Tank waste remediation system retrieval and disposal mission key enabling assumptions

An overall systems approach has been applied to develop action plans to support the retrieval and immobilization waste disposal mission. The review concluded that the systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed. An analysis of the programmatic, management and technical activities necessary to declare Readiness to Proceed with execution of the mission demonstrates that the system, people, and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and immobilized waste disposal mission requirements and evaluating the readiness of the TWRS contractor to supply waste feed to the private contractors in June 2002. The Phase 1 feed delivery requirements from the Private Contractor Request for Proposals were reviewed, transfer piping routes were mapped on it, existing systems were evaluated, and upgrade requirements were defined. Technical Basis Reviews were completed to define work scope in greater detail, cost estimates and associated year by year financial analyses were completed. Personnel training, qualifications, management systems and procedures were reviewed and shown to be in place and ready to support the Phase 1B mission. Key assumptions and risks that could negatively …
Date: January 9, 1998
Creator: Baldwin, J. H.
System: The UNT Digital Library
Statement of work for services provided by the waste sampling and characterization facility for the effluent and environmental monitoring program during calendar year 1998 (open access)

Statement of work for services provided by the waste sampling and characterization facility for the effluent and environmental monitoring program during calendar year 1998

This document defines the services the Waste Sampling and Characterization Facility (WSCF) shall provide the Effluent and Environmental Monitoring Program (EEM) throughout the calendar year for analysis. The purpose of the EEM Program is to monitor liquid and gaseous effluents, and the environment immediately around the facilities which may contain radioactive and hazardous materials. Monitoring data are collected, evaluated, and reported to determine their degree of compliance with applicable federal and state regulations and permits. The Appendix identifies the samples EEM plans to submit for analysis in CY-1998. Analysis of effluent (liquid and air discharges) and environmental (air, liquid, animal, and vegetative) samples is required using standard laboratory procedures, in accordance with regulatory and control requirements cited in Quality Assurance Program Plan for Radionuclide Airborne Emissions Monitoring (especially Appendix G) (WHC 1995a), Effluent Monitoring Quality Assurance Project Plan for Radionuclide Airborne Emissions Data (WHC 1995b), Near-Facility Environmental Monitoring Quality Assurance Project Plan (WMNW 1997), and Hanford Analytical Services Quality Assurance Requirements Documents (DOE 1996). Should changes to this document be necessary, WSCF or the Waste Management Federal Services, Inc. (WMH) Air and Water Services (AWS) Organization may amend it at any time with a jointly approved internal memo.
Date: January 29, 1998
Creator: Greager, E. M.
System: The UNT Digital Library
Test report for run-in acceptance testing of Project W-151 300 HP mixing pumps (open access)

Test report for run-in acceptance testing of Project W-151 300 HP mixing pumps

This report documents the results of a performance demonstration and operational checkout of three 300 HP mixer pumps in accordance with WHC-SD-WI51-TS-001 ``Mixer Pump Test Specification for Project W-151`` and Statement of Work 8K520-EMN-95-004 ``Mixer Pump Performance Demonstration at MASF`` in the 400 Area Maintenance and Storage Facility (MASF) building. Testing of the pumps was performed by Fast Flux Test Facility (FFTF) Engineering and funded by the Tank Waste Remediation System (TWRS) Project W-151. Testing began with the first pump on 04-01-95 and ended with the third pump on 11-01-96. Prior to testing, the MASF was modified and prepared to meet the pump testing requirements set forth by the Test Specification and the Statement of Work.
Date: January 29, 1998
Creator: Berglin, B. G.
System: The UNT Digital Library
Tank 241-SX-105 rotary mode core sampling and analysis plan (open access)

Tank 241-SX-105 rotary mode core sampling and analysis plan

This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for rotary mode core samples from tank 241-SX-105 (SX-105). It is written in accordance with Tank Safety Screening Data Quality Objective (Dukelow et al. 1995) and Memorandum of Understanding for the Organic Complexant Safety Issue Data Requirements (Schreiber 1997a). Vapor screening issues apply as well, but are outside the scope of this SAP. A physical profile prediction based on waste fill history and previous sampling information is provided in Appendix A. Prior to core sampling, the dome space (below the riser) shall be measured for the presence of flammable gases. The measurement shall be taken from within the dome space and the data reported as a percentage of the lower flammability limit (LFL). The results shall be transmitted to the tank coordinator within ten working days of the sampling event (Schreiber 1997b). If the results are above 25 percent of the LFL when analyzing by gas chromatography/mass spectrometry or gas-specific monitoring gauges or above 10% of the LFL when analyzing with a combustible gas meter, the necessity for recurring sampling for flammable gas concentration and the frequency of such sampling will …
Date: January 27, 1998
Creator: Simpson, B. C.
System: The UNT Digital Library
Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization (open access)

Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

This Management Assessment of Tank Waste Remediation System (TWRS) Contractor Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on-line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive …
Date: January 9, 1998
Creator: Honeyman, J. O.
System: The UNT Digital Library
Tank waste remediation system retrieval and disposal mission readiness-to-proceed memorandum (open access)

Tank waste remediation system retrieval and disposal mission readiness-to-proceed memorandum

This memorandum provides a summary of PHMC (Project Hanford Management Contract) team work scope for the Phase 1 TWRS Retrieval and Disposal Mission, a declaration of readiness-to proceed, a summary of the PHMC readiness evaluation process, summary results of a structured independent appraisal and financial analysis including information associated with assumptions, risks, and recommendations and, a summary of program plans for the PHMC team`s component of the Phase 1 Mission.
Date: January 9, 1998
Creator: Jordan, K. N.
System: The UNT Digital Library
Tank waste remediation system retrieval and disposal mission readiness-to-proceed guidance and requirements to deliverables crosswalk (open access)

Tank waste remediation system retrieval and disposal mission readiness-to-proceed guidance and requirements to deliverables crosswalk

Before RL can authorize proceeding with Phase 1B, the PHMC team must demonstrate its readiness to retrieve and deliver the waste to the private contractors and to receive and dispose of the products and byproducts returned from the treatment. The PHMC team has organized their plans for providing these vitrification-support services into the Retrieval and Disposal Mission within the Tank Waste Remediation System (TWRS) Program.
Date: January 9, 1998
Creator: Hall, C. E.
System: The UNT Digital Library
Tank waste remediation system retrieval and disposal mission phase 1 financial analysis (open access)

Tank waste remediation system retrieval and disposal mission phase 1 financial analysis

The purpose of the Tank Waste Remediation System (TWRS) Retrieval and Disposal Mission Phase 1 Financial Analysis is to provide a quantitative and qualitative cost and schedule risk analysis of HNF-1946, Tank Waste Remediation System Retrieval and Disposal Mission Initial Updated Baseline (Swita et al. 1998). The Updated Baseline (Section 3.0) is compared to the current TWRS Project Multi-Year Work Plan (MYWP) for fiscal year (FY) 1998 and target budgets for FY 1999 through FY 2011 (Section 4.1). The analysis then evaluates the executability of HNF-1946 (Sections 4.2 through 4.5) and recommends a path forward for risk mitigation (Sections 4.6, 4.7, and 5.0). A sound systems engineering approach was applied to understand and analyze the Phase 1B Retrieval and Disposal mission. Program and Level 1 Logics were decomposed to Level 8 of the Work Breakdown Structure (WBS) where logic was detailed, scope was defined, detail durations and estimates prepared, and resource loaded schedules developed. Technical Basis Review (TBR) packages were prepared which include this information and, in addition, defined the enabling assumptions for each task, and the risks associated with performance. This process is discussed in Section 2.1. Detailed reviews at the subactivity within the Level 1 Logic TBR levels …
Date: January 9, 1998
Creator: Wells, M. W.
System: The UNT Digital Library
Calibration grooming and alignment for LDUA High Resolution Stereoscopic Video Camera System (HRSVS) (open access)

Calibration grooming and alignment for LDUA High Resolution Stereoscopic Video Camera System (HRSVS)

The High Resolution Stereoscopic Video Camera System (HRSVS) was designed by the Savannah River Technology Center (SRTC) to provide routine and troubleshooting views of tank interiors during characterization and remediation phases of underground storage tank (UST) processing. The HRSVS is a dual color camera system designed to provide stereo viewing of the interior of the tanks including the tank wall in a Class 1, Division 1, flammable atmosphere. The HRSVS was designed with a modular philosophy for easy maintenance and configuration modifications. During operation of the system with the LDUA, the control of the camera system will be performed by the LDUA supervisory data acquisition system (SDAS). Video and control status 1458 will be displayed on monitors within the LDUA control center. All control functions are accessible from the front panel of the control box located within the Operations Control Trailer (OCT). The LDUA will provide all positioning functions within the waste tank for the end effector. Various electronic measurement instruments will be used to perform CG and A activities. The instruments may include a digital volt meter, oscilloscope, signal generator, and other electronic repair equipment. None of these instruments will need to be calibrated beyond what comes from the …
Date: January 27, 1998
Creator: Pardini, A. F.
System: The UNT Digital Library
Computer code selection criteria for flow and transport code(s) to be used in undisturbed vadose zone calculations for TWRS environmental analyses (open access)

Computer code selection criteria for flow and transport code(s) to be used in undisturbed vadose zone calculations for TWRS environmental analyses

The Tank Waste Remediation System (TWRS) is responsible for the safe storage, retrieval, and disposal of waste currently being held in 177 underground tanks at the Hanford Site. In order to successfully carry out its mission, TWRS must perform environmental analyses describing the consequences of tank contents leaking from tanks and associated facilities during the storage, retrieval, or closure periods and immobilized low-activity tank waste contaminants leaving disposal facilities. Because of the large size of the facilities and the great depth of the dry zone (known as the vadose zone) underneath the facilities, sophisticated computer codes are needed to model the transport of the tank contents or contaminants. This document presents the code selection criteria for those vadose zone analyses (a subset of the above analyses) where the hydraulic properties of the vadose zone are constant in time the geochemical behavior of the contaminant-soil interaction can be described by simple models, and the geologic or engineered structures are complicated enough to require a two-or three dimensional model. Thus, simple analyses would not need to use the fairly sophisticated codes which would meet the selection criteria in this document. Similarly, those analyses which involve complex chemical modeling (such as those analyses …
Date: January 26, 1998
Creator: Mann, F. M.
System: The UNT Digital Library
Tank waste remediation system mission analysis report (open access)

Tank waste remediation system mission analysis report

This document describes and analyzes the technical requirements that the Tank Waste Remediation System (TWRS) must satisfy for the mission. This document further defines the technical requirements that TWRS must satisfy to supply feed to the private contractors` facilities and to store or dispose the immobilized waste following processing in these facilities. This document uses a two phased approach to the analysis to reflect the two-phased nature of the mission.
Date: January 9, 1998
Creator: Acree, C. D.
System: The UNT Digital Library
Defense Export Loan Guarantee Program (DELG) (open access)

Defense Export Loan Guarantee Program (DELG)

This report provides an overview of the Defense Export Loan Guarantee Program (DELG) which became operational on November 8, 1996. It discusses the major features of the program, which is aimed at assisting prospective foreign purchasers of U.S. defense equipment finance those purchase through private sector loans.
Date: January 26, 1998
Creator: Grimmett, Richard F.
System: The UNT Digital Library
Thermal Safety of the Current Buses inthe Chimney of the D0 Solenoid (open access)

Thermal Safety of the Current Buses inthe Chimney of the D0 Solenoid

The thermal and electrical behaviour of the current buses in the chimney of the D0 solenoid during upset conditions is modeled to guide the selection of trip levels for magnet protection circuits which discharge the magnet if abnormal conditions are detected. The current buses in the chimney are designed to operate safely without likelihood of loss of superconductivity as long as normal cooling conditions are maintained. Helium liquid level probes, helium flow instrumentation, and thermometry all are provided to certify that proper cooling conditions exist in the subcooler and chimney at all times. Rising temperatures in any portion of the system, excessive voltage drops on the vapor cooled leads, or decreasing liquid level in the subcooler or flow rate in the system, will each cause the fast discharge system to be triggered. Postulated failures of the helium flow system, somehow undetected by any and all of the aforementioned instrumentation, can in principal eventually lead to loss of superconductivity in the buses. Quenching in one bus will rapidly lead to quenching in the other. Potential taps on the buses and magnet coil halves connected to voltage-detection bridges external to the system provide at least dually redundant signals which will unambiguously trigger …
Date: January 20, 1998
Creator: Smith, R. P.
System: The UNT Digital Library