5 Matching Results
Results open in a new window/tab.
Results:
1 - 5 of
5
Aggregate Stock Pile
Depicts the aggregate stock pile area for the Altus project. Caption says, "A-787 View of aggregate stock pile area. Note Euclid bottom dump truck unloading 3" - 6" size of aggregate from crushing and screening plant and small dump truck unloading #4 - 3/4" size aggregate from sand plant."
Date:
November 25, 1942
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Closeup of Sand Plant Layout
Close up view of the sand plant for the Altus Project. Caption says, "A-782 Close-up view of sand plant. A portion of the processed sand stockpile is visible in the foreground."
Date:
November 25, 1942
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Rock Crushing Plant in Operation
Rock crushing plant in operation for the Altus highway and railroad relocation project. Caption says, "A-786 View of crushing and screening plant showing belt conveyor arrangement and loading bunkers. Note Euclid bottom dump truck loading 1 1/2" - 3" size aggregate."
Date:
November 25, 1942
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Rock Crushing Plant in Operation
Rock crushing plant in operation for the Altus highway and railroad relocation project. Caption says, "A-785 View of crushing and screening plant showing chain feeder, trommel screens and primary gyratory grusher. Primary vibrating screen may be seen below trommel screen."
Date:
November 25, 1942
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Sand Plant Layout
Sand plant layout for the Altus project. Caption says, "A-781 General view of sand plant layout. The processed sand stockpile may be seen at the left and the raw sand feeding operations at the right."
Date:
November 25, 1942
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History