Counties
Year
Results:
1 - 2 of
2
Geologic and Well-Construction Data for the H-8 Borehole Complex Near the Proposed Waste Isolation Pilot Plant Site, Southeastern New Mexico
From introduction: The U.S. Geological Survey is participating in this evaluation by developing information on the ground-water hydrology of the region, obtaining geologic borehole data, and conducting hydrologic tests in boreholes on and near the WIPP site. This report provides well-construction information and lithologic data about the Rustler and Salado Formations and the top of the salt interval within the Salado Formation at the H-8 borehole complex.
Date:
1982
Creator:
Wells, J. G. & Drellack, S. L., Jr.
System:
The UNT Digital Library
Geologic and Well-Construction Data for the H-9 Borehole Complex Near the Proposed Waste Isolation Pilot Plant Site, Southeastern New Mexico
From introduction: The U.S. Geological Survey is participating in this evaluation by developing information on the ground-water hydrology of the region, obtaining geologic borehole data, and conducting hydrologic tests in boreholes on and near the WIPP site. This report provides well-construction information and lithologic data about the Rustler and Salado Formations and the top of the salt interval within the Salado Formation at the H-9 borehole complex.
Date:
1982
Creator:
Drellack, S. L., Jr. & Wells, J. G.
System:
The UNT Digital Library