Modifications to Filling and Emptying System of Lock No. 1, Mississippi River, Minneapolis, Minnesota =: Hydraulic Model Investigation (open access)

Modifications to Filling and Emptying System of Lock No. 1, Mississippi River, Minneapolis, Minnesota =: Hydraulic Model Investigation

From abstract: The existing locks at Locks and Dam No. 1 were constructed between 1929 and 1932. Problems have been experienced with accumulation of ice and debris at the intakes, air entrapment in the culverts of the filling and emptying system, excessive turbulence in the lock chamber during filling, and hazardous conditions downstream from the locks during emptying operations.
Date: December 1979
Creator: Ables, Jackson H., Jr.
System: The UNT Digital Library
Kissimmee River Structures, Central and Southern Florida Flood Control Project: Hydraulic Model Investigation (open access)

Kissimmee River Structures, Central and Southern Florida Flood Control Project: Hydraulic Model Investigation

Abstract: Kissimmee River structures S-65E, S-65D, and S-65B were reproduced in a 1:20 scale model in order to study ways of eliminating scour of the downstream riprap blankets by means of structural modifications of operating procedures.
Date: March 1979
Creator: Turner, Herman O., Jr. & Pickering, Glenn A.
System: The UNT Digital Library