Design Study of a Pebble-Bed Reactor Power Plant (open access)

Design Study of a Pebble-Bed Reactor Power Plant

Sanderson & Porter have carried out a series of studies over the last four years which indicate that the pebble-bed reactor way be an attractive way to obtain low-cost power. At the request of the Atomic Energy Commission, two design studies have been carried out on this concept at the Oak Ridge National Laboratory. The first of these a preliminary design of a 10-Mw(t) reactor experiment, the PRRE, was initiated September 10, and a report on the study was issued November 1960. The second phase of the work, a conceptual design study of a 330-Mw (e) central station, was initiated November 1, and is the subject of this report.
Date: May 11, 1961
Creator: Fraas, A. P.; Carlsmith, R. S.; Corum, J. M. & Foster, J.
System: The UNT Digital Library
Fast-Neutron and Gamma Spectrum and Dose in Beryllium Oxide (open access)

Fast-Neutron and Gamma Spectrum and Dose in Beryllium Oxide

This report follows a series of tests run to determine the shielding properties of beryllium oxide, conducted at the Battelle Lid-Tank Shielding Facility. Neutron and gamma penetrations through and behind beryllium oxide were measured.
Date: January 11, 1961
Creator: Klingensmith, Raymond W.; Jung, Richard G.; Lindgren, William A.; Epstein, Harold M. & Chastain, Joel W., Jr.
System: The UNT Digital Library
Determination of the S. S. N. M. Content of the Shipment to the Davison Chemical Company, Erwin, Tennessee, December 20, 1960 (open access)

Determination of the S. S. N. M. Content of the Shipment to the Davison Chemical Company, Erwin, Tennessee, December 20, 1960

A carrier containing 138.99 liters of solution, uranium concentration 202.04 g/liter with an isotopic concentration of 97.3% U-233, was prepared for shipment. The total uranium was 28,062 +/- 60 g (95% confidence level) and the U-233, 27,305 +/- 66 g (95% confidence level).
Date: January 11, 1961
Creator: Sadowski, G. S.
System: The UNT Digital Library
Improved Zirconium Alloys Quarterly Report: April - June 1961 (open access)

Improved Zirconium Alloys Quarterly Report: April - June 1961

Quarterly report documenting progress on a project to determine an improved zirconium alloy for service in superheated water and steam. This report describes the results of approximately 75 compositions that were prepared prior, and presently are being arc-melted and fabricated into corrosion specimens, continuing the investigations of the effect of zirconium purity and heat treatment on corrosion and resistance.
Date: July 11, 1961
Creator: Weinstein, Daniel & Holtz, F. C.
System: The UNT Digital Library
Improved Zirconium Alloys Quarterly Report: January - March 1961 (open access)

Improved Zirconium Alloys Quarterly Report: January - March 1961

The following report is one of a series of quarterly reports following the progress and development of improved zirconium alloys for service in superheated water and steam. This report covers the period between January 1 to March 31, 1961.
Date: April 11, 1961
Creator: Weinstein, Daniel & Holtz, F. C.
System: The UNT Digital Library