Month

Masonry

Caption says, "A-881 View of the complete masonry section of the right training wall taken from the right abutment prior to placing earth and rock backfill."
Date: July 13, 1943
Creator: Bryne, W. S.
System: The Gateway to Oklahoma History

Masonry

Caption says, "A-882 View of completed masonry section of right training wall taken from the spillway side of the wall."
Date: July 13, 1943
Creator: Bryne, W. S.
System: The Gateway to Oklahoma History

Concrete Placing

Caption says, "A-880 Forms and reinforcing steel in place for first concrete placement in canal outlet trashrack structure."
Date: July 13, 1943
Creator: Bryne, W. S.
System: The Gateway to Oklahoma History

Delivering Buckets of Concrete

Caption says, "A-879 13 c.y. Euclid delivering two 2-c.y. buckets of concrete to crane for placing in left abutment of dam."
Date: July 13, 1943
Creator: Bryne, W. S.
System: The Gateway to Oklahoma History

Ozark Canal

Caption says, "5-AL-992. Specifications No. 1447. View of finished canal looking upstream from Station 191-00 on the Ozark Canal."
Date: July 13, 1948
Creator: Anstead, R. W.
System: The Gateway to Oklahoma History

Mixer

Caption says, "5-AL-994. Specifications No. 1899. View of 16-s mixer with a 12-20 Con-vay-it Conveyor attached. Also completed dry-rock paving at the outlet end of a box siphon, Station 168-86 on the Altus 21.7 lateral."
Date: July 13, 1948
Creator: Anstead, R. W.
System: The Gateway to Oklahoma History

Concrete Placing

Caption says, "5-AL-993. Specifications No. 1987. View of concrete placing operations, 3.5 x 3.5 box siphon at Station 55-90 on the Ozark lateral."
Date: July 13, 1948
Creator: Anstead, R. W.
System: The Gateway to Oklahoma History