Resource Type

Environmental impact assessment: chemical explosive fracturing project, Petroleum Technology Corporation/Sutton County, Texas (open access)

Environmental impact assessment: chemical explosive fracturing project, Petroleum Technology Corporation/Sutton County, Texas

A proposed two-well stimulation test to be carried out in Sutton County, Texas is described. Work will be performed in the lenticular tight sand formation of the Val Verde-Kerr Basin to demonstrate the technical and economic feasibility of chemical explosive fracturing as a method of increasing gas deliverability in that formation. The purpose of the project's experimental design, which calls for the testing of two separate wells using different techniques, would be to obtain the maximum amount of information relating to the most effective method of stimulating this particular reservoir. Results will permit the direct comparison of the different completion techniques. Also the testing of more than one well in a given area will allow for the collection of complementary data with regards to the characteristics of the reservoir and the experimental results from the explosive stimulation. The environmental effects of the project are assessed. (JRD)
Date: July 14, 1975
Creator: Tonnessen, Kathy A.
System: The UNT Digital Library
Environmental impact assessment: chemical explosive fracturing project, Petroleum Technology Corporation/Sutton County, Texas (open access)

Environmental impact assessment: chemical explosive fracturing project, Petroleum Technology Corporation/Sutton County, Texas

The Nevada Operations Office of the Energy Research and Development Administration (ERDA) has contracted with Petroleum Technology Corporation (PTC) to perform a gas stimulation program by chemical explosive fracturing (CEF) in the Canyon sands of the Val Verde - Kerr Basin of Sutton County, Texas. This lenticular tight sand deposit, underlying much of southwestern Texas, contains large volumes of natural gas. To date this formation has yielded only marginal amounts of gas because of its low porosity and permeability. The semi-arid environment of the Aldwell/Sawyer field is characterized by dry arroyos and xeric vegetation. Population is sparse and sheep ranching is the primary occupation. Because of the existence of previously drilled oil and gas wells, road and pipeline construction will be minimal. Impacts from this two well project are expected to be minimal and be confined to temporary surface disruption and increased erosion at the well site.
Date: July 14, 1977
Creator: Tonnessen, Kathy A.
System: The UNT Digital Library
G. M. Koelemay well No. 1, Jefferson County, Texas. Volume I. Completion and testing: testing geopressured geothermal reservoirs in existing wells. Final report (open access)

G. M. Koelemay well No. 1, Jefferson County, Texas. Volume I. Completion and testing: testing geopressured geothermal reservoirs in existing wells. Final report

The acquisition, completion, and testing of a geopressured-geothermal well are described. The following are covered: geology; petrophysics; re-entry and completion operations - test well; drilling and completion operations - disposal well; test objectives; surface testing facilities; pre-test operations; test sequence; test results and analysis; and return of wells and location to operator. (MHR)
Date: January 1, 1980
Creator: unknown
System: The UNT Digital Library
G. M. Koelemay well No. 1, Jefferson County, Texas. Volume II. Well test data: testing geopressured geothermal reservoirs in existing wells. Final report (open access)

G. M. Koelemay well No. 1, Jefferson County, Texas. Volume II. Well test data: testing geopressured geothermal reservoirs in existing wells. Final report

The following are included in the appendices: field test data, combined and edited raw data, time/pressure data, sample log, reservoir fluid study, gas data, sample collection and analysis procedure, scale monitoring and water analysis, sand detector and strip charts, and Horner-type plot data. (MHR)
Date: January 1, 1980
Creator: unknown
System: The UNT Digital Library
Site selection and preliminary evaluation of potential solar-industrial-process-heat applications for federal buildings in Texas (open access)

Site selection and preliminary evaluation of potential solar-industrial-process-heat applications for federal buildings in Texas

The potential for solr process heat applications for federal buildings in Texas is assessed. The three sites considered are Reese Air Force Base, Lubbock; Fort Bliss, El Paso; and Dyess Air Force Base, Abilene. The application at Lubbock is an electroplating and descaling facility for aircraft maintenance. The one at El Paso is a laundry facility. The Abilene system would use solar heat to preheat boiler feedwater makeup for the base hospital boiler plant. The Lubbock site is found to be the most appropriate one for a demonstration plant, with the Abilene site as an alternate. The processes at each site are described. A preliminary evaluation of the potential contribution by solar energy to the electroplating facility at Reese AFB is included. (LEW)
Date: September 30, 1980
Creator: Branz, Michael A.
System: The UNT Digital Library
Evaluation of geopressured brine injectability: Department of Energy, Pleasant Bayou No. 2 well, Brazoria County, Texas (open access)

Evaluation of geopressured brine injectability: Department of Energy, Pleasant Bayou No. 2 well, Brazoria County, Texas

A field evaluation of geopressured brine injectability was completed during September 22 to 25, 1980 at the DOE, Brazoria test site in Texas. Membrane filters, with pore sizes of 0.4-..mu..m and 10.0-..mu..m, were used as the basis for obtaining suspended solids data and for developing performance-life estimates of typical spent brine injection wells. Field measurements were made at 130/sup 0/C and line pressures up to 3800 psig. Scale inhibited (phosphonate-polyacrylate threshold-type, carbonate scale inhibitor), prefiltered-scale-inhibited, and untreated brine were evaluated. Test results indicated that raw brine was highly injectable, while scale-inhibited brine had extremely low quality. The poor injectability of scale-inhibited brine resulted from partial precipitation of the scale inhibitor.
Date: October 28, 1980
Creator: Owen, L. B.; Blair, C. K.; Harrar, J. E. & Netherton, R.
System: The UNT Digital Library
1978 Houston-Galveston and Texas Gulf Coast vertical-control surveys (open access)

1978 Houston-Galveston and Texas Gulf Coast vertical-control surveys

Comparisons between leveling surveys of different epochs are used to determine vertical displacement of permanent bench marks. Displacement of bench marks usually represents the movement of the surrounding area. In this report, the 1978 Houston-Galveston and Texas Gulf Coast releveling surveys are compared to the 1963, 1973, and 1976 releveling results. The changes in elevations of bench marks common to two or more epochs are tabulated and plotted in Appendix A. From these differences, contour maps were prepared for the 1963 to 1978 and 1973 to 1978 epochs in the 2/sup 0/ x 2/sup 0/ area of maximum subsidence. Annual subsidence rates computed for the 1973 to 1978 period are about 25% less in the maximum subsidence area than the rates computed for the 1963 to 1973 period.
Date: November 1, 1980
Creator: Balazs, E. I.
System: The UNT Digital Library
Calderas and mineralization: volcanic geology and mineralization in the Chinati caldera complex, Trans-Pecos Texas (open access)

Calderas and mineralization: volcanic geology and mineralization in the Chinati caldera complex, Trans-Pecos Texas

This report describes preliminary results of an ongoing study of the volcanic stratigraphy, caldera activity, and known and potential mineralization of the Chinati Mountains area of Trans-Pecos Texas. Many ore deposits are spatially associated with calderas and other volcanic centers. A genetic relationship between calderas and base and precious metal mineralization has been proposed by some and denied by others. Steven and others have demonstrated that calderas provide an important setting for mineralization in the San Juan volcanic field of Colorado. Mineralization is not found in all calderas but is apparently restricted to calderas that had complex, postsubsidence igneous activity. A comparison of volcanic setting, volcanic history, caldera evolution, and evidence of mineralization in Trans-Pecos to those of the San Juan volcanic field, a major mineral producer, indicates that Trans-Pecos Texas also could be an important mineralized region. The Chianti caldera complex in Trans-Pecos Texas contains at least two calderas that have had considerable postsubsidence activity and that display large areas of hydrothermal alteration and mineralization. Abundant prospects in Trans-Pecos and numerous producing mines immediately south of the Trans-Pecos volcanic field in Mexico are additional evidence that ore-grade deposits could occur in Texas.
Date: January 1, 1981
Creator: Duex, T. W. & Henry, C. D.
System: The UNT Digital Library
Testing geopressured geothermal reservoirs in existing wells: Pauline Kraft Well No. 1, Nueces County, Texas. Final report (open access)

Testing geopressured geothermal reservoirs in existing wells: Pauline Kraft Well No. 1, Nueces County, Texas. Final report

The Pauline Kraft Well No. 1 was originally drilled to a depth of 13,001 feet and abandoned as a dry hole. The well was re-entered in an effort to obtain a source of GEO/sup 2/ energy for a proposed gasohol manufacturing plant. The well was tested through a 5-inch by 2-3/8 inch annulus. The geological section tested was the Frio-Anderson sand of Mid-Oligocene age. The interval tested was from 12,750 to 12,860 feet. A saltwater disposal well was drilled on the site and completed in a Micocene sand section. The disposal interval was perforated from 4710 to 4770 feet and from 4500 to 4542 feet. The test well failed to produce water at substantial rates. Initial production was 34 BWPD. A large acid stimulation treatment increased productivity to 132 BWPD, which was still far from an acceptable rate. During the acid treatment, a failure of the 5-inch production casing occurred. The poor production rates are attributed to a reservoir with very low permeability and possible formation damage. The casing failure is related to increased tensile strain resulting from cooling of the casing by acid and from the high surface injection pressure. The location of the casing failure is now known …
Date: January 1, 1981
Creator: unknown
System: The UNT Digital Library
Testing geopressured geothermal reservoirs in existing wells. Saldana well No. 2, Zapata County, Texas. Volume I. Completion and testing. Final report (open access)

Testing geopressured geothermal reservoirs in existing wells. Saldana well No. 2, Zapata County, Texas. Volume I. Completion and testing. Final report

The Saldana Well No. 2, approximately 35 miles Southeast of the city of Laredo, Texas, was the sixth successful test of a geopressured-geothermal aquifer under the DOE Wells of Opportunity Program. The well was tested through the annulus between 7-inch casing and 2-3/8 inch tubing. The interval tested was from 9745 to 9820 feet. The geological section was the 1st Hinnant Sand, an upper member of the Wilcox Group. Produced water was injected into the Saldana Well No. 1, which was also acquired from Riddle Oil Company and converted to a disposal well. A Miocene salt water sand was perforated from 3005 to 3100 feet for disposal. One pressure drawdown flow test and one pressure buildup test were conducted during a 10-day period. A total of 9328 barrels of water was produced. The highest sustained flow rate was 1950 BWPD.
Date: October 7, 1981
Creator: unknown
System: The UNT Digital Library
20-kW Solar Photovoltaic Flat-Panel Power System for an Uninterruptible Power-System Load in El Paso, Texas. Phase Ii. System Fabrication. Final Report October 1, 1979-May 31, 1981 (open access)

20-kW Solar Photovoltaic Flat-Panel Power System for an Uninterruptible Power-System Load in El Paso, Texas. Phase Ii. System Fabrication. Final Report October 1, 1979-May 31, 1981

The system plans, construction, integration and test, and performance evaluation are discussed for the photovoltaic power supply at the Newman Power Station in El Paso, Texas. The system consists of 64 parallel-connected panels, each panel containing nine series-connected photovoltaic modules. The system is connected, through power monitoring equipment, to an existing DC bus that supplies uninterruptible power to a computer that controls the power generating equipment. The site is described and possible environmental hazards are assessed. Site preparation and the installation of the photovoltaic panels, electrical cabling, and instrumentation subsystems are described. System testing includes initial system checkout, module performance test, control system test. A training program for operators and maintenance personnel is briefly described, including visual aids. Performance data collection and analysis are described, and actual data are compared with a computer simulation. System drawings are included. (LEW)
Date: December 1, 1981
Creator: Risser, V.V.
System: The UNT Digital Library
Field project to obtain pressure core, wireline log, and production test data for evaluation of CO/sub 2/ flooding potential. Texas Pacific Bennett Ranch Unit well No. 310, Wasson (San Andres) Field, Yoakum County, Texas (open access)

Field project to obtain pressure core, wireline log, and production test data for evaluation of CO/sub 2/ flooding potential. Texas Pacific Bennett Ranch Unit well No. 310, Wasson (San Andres) Field, Yoakum County, Texas

The coring, logging and testing of Bennett Ranch Unit well No. 310 was a cooperative effort between Texas Pacific, owner of the well, and Gruy Federal, Inc. The requirements of the contract, which are summarized in Enclosure 1, Appendix A, include drilling and coring activities. The pressure-coring and associated logging and testing programs in selected wells are intended to provide data on in-situ oil saturation, porosity and permeability distribution, and other data needed for resource characterization of fields and reservoirs in which CO/sub 2/ injection might have a high probability of success. This report presents detailed information on the first such project. This project demonstrates the usefulness of integrating pressure core, log and production data to realistically evaluate a reservoir for carbon dioxide flood. The engineering of tests and analysis of such experimental data requires original thinking, but the reliability of the results is higher than data derived from conventional tests.
Date: January 1, 1982
Creator: Swift, Terry E.; Goodrich, John H.; Kumar, Raj M.; McCoy, R. L.; Wilhelm, Miles H.; Glascock, M. R. et al.
System: The UNT Digital Library
Texas: basic data for thermal springs and wells as recorded in GEOTHERM (open access)

Texas: basic data for thermal springs and wells as recorded in GEOTHERM

This compilation identities all locations of potential source of geothermal fluids in Texas available as of December 1981. 7 refs. (ACR)
Date: July 1, 1983
Creator: Bliss, J. D.
System: The UNT Digital Library
First order leveling: Pleasant Bayou geothermal test site, Brazoria County, Texas (open access)

First order leveling: Pleasant Bayou geothermal test site, Brazoria County, Texas

First order leveling to be conducted as part of an environmental monitoring program for a geopressured test well was reported. 39.43 kilometers of first order levels were run to NGS specifications. Twelve Class B type bench marks were set to NGS specifications. The adjusted elevation of bench mark C-1209 was used as a starting elevation and is based on a supplementary adjustment of April 6, 1979 by NGS. The closure for the loop around the well site is -0.65 millimeters. The distance around the loop is 1.29 kilometers, the allowable error of closure was 4.54 millimeters. The initial leveling of this well was performed in 1977. A thorough search for their monumentation was conducted. No monuments were found due to the lack of adequate monument descriptions. Therefore, an elevation comparison summary for this report is only available along the NGS lines outside the well area. The first order level tie to line No. 101 (BMA-1208) was +3.37 millimeters in 17.21 kilometers. The allowable error of closure was 12.44 millimeters.
Date: October 1, 1984
Creator: unknown
System: The UNT Digital Library
Environmental assessment: Deaf Smith County site, Texas, Volume I (open access)

Environmental assessment: Deaf Smith County site, Texas, Volume I

In February 1983, the US Department of Energy (DOE) identified a location in Deaf Smith County, Texas, as one of nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Deaf Smith County site and the eight other potentially sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. The Deaf Smith County site is in the Permian Basin, which is one of five distinct geohydrologic settings considered for the first repository. On the basis of the evaluations reported in this EA, the DOE has found that the Deaf Smith County site is not disqualified under the guidelines. On the basis of these findings, the DOE is nominating the Deaf Smith County site as one of the five sites suitable for characterization. 591 refs., 147 figs., 173 tabs.
Date: May 1986
Creator: unknown
System: The UNT Digital Library
Environmental assessment, Deaf Smith County site, Texas Volume II (open access)

Environmental assessment, Deaf Smith County site, Texas Volume II

The Nuclear Waste Policy Act of 1982 (42 USC sections 10101-10226) requires the environmental assessment of a proposed site to include a statement of the basis for nominating a site as suitable for characterization. Volume 2 provides a detailed statement evaluating the site suitability of the Deaf Smith County Site under DOE siting guidelines, as well as a comparison of the Deaf Smith County Site to the other sites under consideration. The evaluation of the Deaf Smith County Site is based on the impacts associated with the reference repository design, but the evaluation will not change if based on the Mission Plan repository concept. The second part of this document compares the Deaf Smith County Site to Davis Canyon, Hanford, Richton Dome and Yucca Mountain. This comparison is required under DOE guidelines and is not intended to directly support subsequent recommendation of three sites for characterization as candidate sites. 259 refs., 29 figs., 66 refs. (MHB)
Date: May 1986
Creator: unknown
System: The UNT Digital Library
Environmental assessment: Deaf Smith County site, Texas Volume III (open access)

Environmental assessment: Deaf Smith County site, Texas Volume III

In February 1983, the US Department of Energy (DOE) identified a location in Deaf Smith County, Texas, as one of the nine potentially acceptable sites for mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Deaf Smith County site and eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. The Deaf Smith County site is in the Permian Basin, which is one of five distinct geohydrologic settings considered for the first repository. On the basis of the evaluations reported in this EA, the DOE has found that the Deaf Smith County site is not disqualified under the guidelines.
Date: May 1986
Creator: unknown
System: The UNT Digital Library
Environmental assessment overview, Deaf Smith County site, Texas (open access)

Environmental assessment overview, Deaf Smith County site, Texas

In February 1983, the US Department of Energy (DOE) identified a location in Deaf Smith County, Texas, as one of nine potentially acceptable sites for mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Deaf Smith County site and eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. The Deaf Smith County site is in the Permian Basin, which is one of five distinct geohydrologic settings considered for the first repository. On the basis of the evaluations reported in this EA, the DOE has found that the Deaf Smith County site is not disqualified under the guidelines. On the basis of these findings, the DOE is nominating the Deaf Smith County site as one of five sites suitable for characterization. 3 figs.
Date: May 1986
Creator: unknown
System: The UNT Digital Library
Consultation draft: Site characterization plan overview, Deaf Smith County Site, Texas: Nuclear Waste Policy Act (Section 113) (open access)

Consultation draft: Site characterization plan overview, Deaf Smith County Site, Texas: Nuclear Waste Policy Act (Section 113)

The Department of Energy (DOE) is preparing a site characterization plan for the candidate site in Deaf Smith County, Texas. The DOE has provided, for information and review, a consultation draft of the plan to the State of Texas and the US Nuclear Regulatory Commission. The site characterization plan is a lengthy document that describes in considerable detail the program that will be conducted to characterize the geologic, hydrologic, and other conditions relevant to the suitability of the site for a repository. The overview presented here consists of brief summaries of important topics covered in the consultation draft of the site characterization plan; it is not a substitute for the site characterization plan. The arrangement of the overview is similar to that of the plan itself, with brief descriptions of the repository system - the site, the repository, and the waste package - preceding the discussion of the characterization program to be carried out at the Deaf Smith County site. It is intended primarily for the management staff of organizations involved in the DOE's repository program or other persons who might wish to understand the general scope of the site-characterization program, the activities to be conducted, and the facilities to …
Date: January 1, 1988
Creator: unknown
System: The UNT Digital Library
Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Falls City, Texas: Final Report (open access)

Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Falls City, Texas: Final Report

The uranium processing site near Falls City, Texas, was one of 24 inactive uranium mill sites designated to be remediated by the U.S. Department of Energy (DOE) under Title I of the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the U.S. Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the U.S. Environmental Protection Agency (EPA). The RAP, which includes this summary remedial action selection report (RAS), serves a two-fold purpose. First, it describes the activities proposed by the DOE to accomplish long-term stabilization and control of the residual radioactive materials at the inactive uranium processing site near Falls City, Texas. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Texas, and the NRC, becomes Appendix B of the Cooperative Agreement between the DOE and the State of Texas.
Date: September 1, 1992
Creator: unknown
System: The UNT Digital Library
An aerial radiological survey of the Superconducting Super Collider Laboratory and surrounding area, Waxahachie, Texas. Date of survey: July--August 1991 (open access)

An aerial radiological survey of the Superconducting Super Collider Laboratory and surrounding area, Waxahachie, Texas. Date of survey: July--August 1991

An aerial radiological survey was conducted over the Superconducting Super Collider Laboratory (SSCL) site from July 22 through August 20,1991. Parallel lines were flown at intervals of 305 meters over a 1,036-square-kilometer (400-square-mile) area surrounding Waxahachie, Texas. The 70,000 terrestrial gamma energy spectra obtained were reduced to an exposure rate contour map overlaid on a United States Geological Survey (USGS) map of the area. The mean terrestrial exposure rate measured was 5.4 {mu}R/h at 1 meter above ground level. Comparison to ground-based measurements shows good agreement. No anomalous or man-made isotopes were detected.
Date: February 1, 1993
Creator: Fritzsche, A. E.
System: The UNT Digital Library
Texas Experimental Tokamak (open access)

Texas Experimental Tokamak

This progress report covers the period from November 1, 1990 to April 30, 1993. During that period, TEXT was operated as a circular tokamak with a material limiter. It was devoted to the study of basic plasma physics, in particular to study of fluctuations, turbulence, and transport. The purpose is to operate and maintain TEXT Upgrade as a complete facility for applied tokamak physics, specifically to conduct a research program under the following main headings: (1) to elucidate the mechanisms of working gas, impurity, and thermal transport in tokamaks, in particular to understand the role of turbulence; (2) to study physics of the edge plasma, in particular the turbulence; (3) to study the physics or resonant magnetic fields (ergodic magnetic divertors, intra island pumping); and (4) to study the physics of electron cyclotron heating (ECRH). Results of studies in each of these areas are reported.
Date: April 1, 1993
Creator: Wootton, A.J.
System: The UNT Digital Library
An Evaluation of Meteorologic Data Differences Between the Pantex Plant and Amarillo, Texas (open access)

An Evaluation of Meteorologic Data Differences Between the Pantex Plant and Amarillo, Texas

Meteorologic data from the Pantex Plant and from the nearby National Weather Service (NWS) station at the Amarillo, Texas, International Airport were evaluated to determine if the NWS data adequately represented meteorologic conditions at the Pantex Plant. Annual site environmental dose calculations for the Pantex Plant have previously used the NWS data; information from this data comparison helped determine if future environmental dose calculations should use site-specific Pantex meteorologic data. The meteorologic data evaluated were wind speed, wind direction, and atmospheric stability class. Atmospheric stability class data were compared for years 1990 and 1991 and found to be very similar. Stability class designations were identical and one class different in 63% and 30%, respectively, of the paired hourly data. An unexpected finding was the preponderance of Class D stability, which occurred approximately 62% of the time in both data sets. The overall effect of meteorological differences between the two locations was evaluated by performing environmental dose assessments using the GENII dose assessment computer code. Acute and chronic releases of {sup 3}H and {sup 239}Pu were evaluated. Results using the NWS Amarillo meteorologic data were approximately one-half of those generated using Pantex meteorologic data. The two-fold difference in dose results is …
Date: June 1, 1993
Creator: Snyder, S. F.
System: The UNT Digital Library
UMTRA Project Water Sampling and Analysis Plan, Falls City, Texas (open access)

UMTRA Project Water Sampling and Analysis Plan, Falls City, Texas

Surface remedial action will be completed at the Falls City, Texas, Uranium Mill Tailings Remedial Action Project site in the spring of 1994. Results of water sampling activity from 1989 to 1993 indicate that ground water contamination occurs primarily in the Deweesville/Conquista aquifer (the uppermost aquifer) and that the contamination migrates along four distinct contaminant plumes. Contaminated ground water from some wells in these regions has significantly elevated levels of aluminum, arsenic, cadmium, manganese, molybdenum, selenium, sulfate, and uranium. Contamination in the Dilworth aquifer was identified in monitor well 977 and in monitor well 833 at the southern edge of former tailings pile 4. There is no evidence that surface water quality in Tordilla and Scared Dog Creeks is impacted by tailings seepage. The following water sampling activities are planned for calendar year 1994: (1) Ground water sampling from 15 monitor wells to monitor the migration of the four major contaminant plumes within the Deweesville/Conquista aquifer. (2) Ground water sampling from five monitor wells to monitor contaminated and background ground water quality conditions in the Dilworth aquifer. Because of disposal cell construction activities, all plume monitor wells screened in the Dilworth aquifer were abandoned. No surface water locations are proposed …
Date: February 1, 1994
Creator: unknown
System: The UNT Digital Library