Resource Type

States

[Summary of affiliate survey results] (open access)

[Summary of affiliate survey results]

A 27-page survey by the AIDS ARMS Network, Inc. on its affiliates and how they served local populations which were living with HIV/AIDS.
Date: August 28, 1989
Creator: AIDS ARMS Network, Inc.
System: The UNT Digital Library
[Report to Charles Batchelor by B. J. Martin] (open access)

[Report to Charles Batchelor by B. J. Martin]

Carbon copy of a report by B. J. Martin to Charles Batchelor. Hargis states that he agreed to interview with Alvin V. Oser, Executive Assistant District Attorney of New Orleans, Louisiana.
Date: August 13, 1968
Creator: Dallas (Tex.). Police Department.
System: The Portal to Texas History
[Report to Charles Batchelor from B. W. Hargis] (open access)

[Report to Charles Batchelor from B. W. Hargis]

Carbon copy of a report by B. W. Hargis to Charles Batchelor. Hargis states that he agreed to interview with Alvin V. Oser, Executive Assistant District Attorney of New Orleans, Louisiana.
Date: August 12, 1968
Creator: Dallas (Tex.). Police Department.
System: The Portal to Texas History
Green Line Before and After Study Plan (Revised) (open access)

Green Line Before and After Study Plan (Revised)

This document represents a proposed outline for conducting a Before and After Study of the DART Green Line, a major extension of DART's light rail transit (LRT) system. Such studies track the costs and impacts of the extension of Red Line service into the North Central Corridor and analyze the accuracy of forecasts made during project planning. As the Green Line initially began as two separate planning corridors, the Northwest Corridor and the Southeast Corridor, this planned study replaced original planned studies of the two corridors.
Date: August 24, 2012
Creator: Dallas Area Rapid Transit
System: The Portal to Texas History
South Oak Cliff Corridor: Final Environmental Impact Statement (open access)

South Oak Cliff Corridor: Final Environmental Impact Statement

This environmental report was prepared to assess the potential environmental impacts, as well as mitigating measures, of the locally preferred alternative (LPA) design for the South Oak Cliff Corridor light rail transit (LRT) line. These anticipated consequences are also compared against those of alternative designs and of a baseline "no-build alternative." The document also addresses concerns raised during the 45-day public comment period following the release of an earlier environmental assessment.
Date: August 1991
Creator: Dallas Area Rapid Transit
System: The Portal to Texas History
[Financial report: Aug 1988 Lesbian/Gay Political Coalition] (open access)

[Financial report: Aug 1988 Lesbian/Gay Political Coalition]

Financial report of the LGPC as of August 1988. Includes handwritten notes on back side titled "Lesbian Political Agenda."
Date: August 31, 1988
Creator: Lesbian/Gay Political Coalition
System: The UNT Digital Library
South Oak Cliff Corridor Blue Line Extension (SOC-3): Preliminary Engineering/Environmental Assessment - 5% Design Report (open access)

South Oak Cliff Corridor Blue Line Extension (SOC-3): Preliminary Engineering/Environmental Assessment - 5% Design Report

This document analyzes the engineering feasibility of a planned Light Rail Transit (LRT) extension from Ledbetter Station to the UNT Dallas campus. It would be used to help DART from a baseline budget for the prefect. It also outlined environmental considerations.
Date: August 2012
Creator: URS Corporation
System: The Portal to Texas History