56 Matching Results

Results open in a new window/tab.

Altus Dam

Caption says, "5-AL-1280. Altus Dam. Looking upstream at downstream face of Altus Dam. Water going over spillway at right."
Date: May 31, 1950
Creator: Finch, F. S.
System: The Gateway to Oklahoma History

Altus Dam

Caption says, "5-AL-1278. Altus Dam. Looking at downstream face of Altus Dam from right abutment. Water going over spillway."
Date: May 31, 1950
Creator: Finch, F. S.
System: The Gateway to Oklahoma History

Close-up of Spillway

Caption says, "5-AL-1279. Altus Dam. Close-up of spillway of Altus Dam."
Date: May 31, 1950
Creator: Finch, F. S.
System: The Gateway to Oklahoma History

Pneumatic Rolling

Caption says, "A-1076 Main Canal test section - stabilized earth lining. View showing harrowing prior to pneumatic rolling, also use of pneumatic roller in canal bottom."
Date: July 31, 1945
Creator: Bryne, W. S.
System: The Gateway to Oklahoma History

Spreading Soil-Cement

Caption says, "A-1072 Main Canal test section. Spreading soil-cement and Stabinol mixture in canal bottom."
Date: July 31, 1945
Creator: Bryne, W. S.
System: The Gateway to Oklahoma History

Rolling Bottom with Sheepsfoot Roller

Caption says, "A-1075 Main Canal test section - stabilized earth lining. View showing method of rolling bottom with sheepsfoot roller."
Date: July 31, 1945
Creator: Bryne, W. S.
System: The Gateway to Oklahoma History

Mixing Stabilizing Agents

Caption says, "A-1073 Main Canal test section. Mixing the stabilizing agents and soil in place by use of farm cultivator and disc."
Date: July 31, 1945
Creator: Bryne, W. S.
System: The Gateway to Oklahoma History

Adding Water to Bottom of Canal

Caption says, "A-1074 Main Canal test section - stabilized earth lining. View showing addition of water in the canal bottom after pre-mixing."
Date: July 31, 1945
Creator: Bryne, W. S.
System: The Gateway to Oklahoma History

Canal Outlet

Caption says, "A-889 View of completed first stage construction of canal outlet trashrack structure. Note one set of concrete stop logs in place bringing reservoir level to El. 1516."
Date: July 31, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Flood Waters

Caption says, "A-852 Flood waters over the Dam in 1935. Photographic copy of small print."
Date: March 31, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Spillway Face

Caption says, "A-849 View showing forms on spillway face of dam and on Block B of the intermediate training wall. Note flashboards on top of old dam in background."
Date: March 31, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Drawing of Model

Caption says, "A-851 Photographic copy of photograph of architect's drawing of model of Altus Dam."
Date: March 31, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Concrete Placing

Caption says, "A-850 First concrete placed in left abutment on left side of diversion channel. Masonry in foreground is upstream face of dam."
Date: March 31, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Preston McMillan with Printing Machine

Caption says, "A-568 Dirt process printing on Model 4B Printer, Chas. Bruning Company machine. Mr. Preston McMillan at printer."
Date: January 31, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Soil Laboratory

Caption says, "A-567 Soils laboratory in Bureau Garage. Mr. Boris N. Bulatkin, soils economist, at wheatstone bridge in center."
Date: January 31, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Sand Pile at Sand Pit

Caption says, "A-736 Sand Pile at sand plant showing output for month of July."
Date: July 31, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Interior of Shop

Caption says, "A-563 East section of shop at Rock Quarry."
Date: January 31, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

West End and Center of Shop

Caption says, "A-564 West and center section of shop at Rock Quarry."
Date: January 31, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Rock Crushing Plant in Operation

Rock crushing plant in operation for the Altus highway and railroad relocation project. Caption says, "A-771 General view showing rock crushing and screening plant in operation."
Date: October 31, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Intersection of Lugert Dike and Santa Fe Railroad

Caption says, "A-730 View from Lugert Butte of Lugert Dike and Santa Fe Railroad intersection."
Date: July 31, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Building of Rock Crushing Plant

Laborers working on wooden structure, the rock crushing plant, for the Altus highway and railroad relocation project. Caption says, "A-747 Progress on erection of crushing plant. Storage bunkers in foreground will be fed by conveyor belts."
Date: August 31, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Completed Rock Cut

Completed rock cut for the Altus highway and railroad relocation project. Caption says, "A-748 View of completed rock cut on A.T. & S.F. relocation, looking down grade. Cut is approximately 2,000 feet long with a maximum cut at center line of 110 feet."
Date: August 31, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Completed Rock Cut

Completed rock cut for the Altus highway and railroad relocation project. Caption says, "A-749 View of completed A.T. & S.F. Railroad rock cut from lower end. Picture taken from an entrance ramp; road bed continues in right foreground on tangent."
Date: August 31, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Main Canal Crossing

View of construction on the main canal crossing for the Altus highway and railroad relocation project. Caption says, "A-750 View of downstream end of Main Canal Crossing under relocated A.T. & S.F. Railroad. Siphon is now complete as far as necessary to permit laying of tracks and backfilling."
Date: August 31, 1942
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History