NOx Control Options and Integration for US Coal Fired Boilers Quarterly Progress Report: January-March 2005 (open access)

NOx Control Options and Integration for US Coal Fired Boilers Quarterly Progress Report: January-March 2005

This is the nineteenth Quarterly Technical Report for DOE Cooperative Agreement No: DEFC26-00NT40753. The goal of the project is to develop cost effective analysis tools and techniques for demonstrating and evaluating low NO{sub x} control strategies and their possible impact on boiler performance for boilers firing US coals. The Electric Power Research Institute (EPRI) is providing co-funding for this program. Refurbished corrosion probes were installed at Plant Gavin and operated for approximately 1,300 hours. This quarterly report includes further results from the BYU catalyst characterization lab and the in-situ lab, and includes the first results from a model suitable for comprehensive simulation codes for describing catalyst performance. The SCR slipstream reactor at Plant Gadsden operated for approximately 100 hours during the quarter because of ash blockage in the inlet probe.
Date: March 31, 2005
Creator: Bockelie, Mike; Davis, Kevin; Senior, Connie; Shino, Darren; Swenson, Dave; Baxter, Larry et al.
System: The UNT Digital Library