Preliminary Studies of Scavenging Systems Related to Radioactive Fallout : Summary Report, April 1, 1959 to April 29, 1960 (open access)

Preliminary Studies of Scavenging Systems Related to Radioactive Fallout : Summary Report, April 1, 1959 to April 29, 1960

This is the summary report on the ARF Project C 127, entitled "Preliminary Studies Related to Radioactive Fallout", covering the period from April 1, 1959, to April 29, 1960.
Date: April 29, 1960
Creator: Rosinski, John & Stockham, John D.
System: The UNT Digital Library
Magnetic Properties of Insulators : Quarterly Report No. 1 Covering the Period from February 15, 1961 to May 15, 1961 (open access)

Magnetic Properties of Insulators : Quarterly Report No. 1 Covering the Period from February 15, 1961 to May 15, 1961

"The magnetic properties of color centers were studied to obtain information regarding electron traps in insulators. Experiments designed to determine the equation governing the recovery of resonance after saturation were carried out. Relatively large samples were prepared by the method of additive coloration. KCl and RbCl crystals were used. Resonance saturation as a function of concentration was investigated and no significant dependence found. Measurements of the unsaturated susceptibility were made at liquid nitrogen and liquid helium temperatures. The bleaching of the F-center to form the B-band produced a different resonance. The equipment for observing the saturation and recovery of a portion of the resonance at 4 deg K is described. A theoretical examination was made of the interaction between the vibration of the ions around a negative-ion vacancy in an alkali halide and an electron trapped at that site. (M.C.G.)."
Date: May 29, 1961
Creator: Markham, Jordan J.
System: The UNT Digital Library
Design Studies on Cesium-137 as a Source for High Level Gamma Irradiators: Quarterly Progress Report Number 2, September - December 1959 (open access)

Design Studies on Cesium-137 as a Source for High Level Gamma Irradiators: Quarterly Progress Report Number 2, September - December 1959

Quarterly progress report describing work related to a study of radiation physics problems involved in the design of high-level cesium-137 gamma sources. It outlines work completed and ongoing goals for the project.
Date: February 29, 1960
Creator: Voyvodic, L.
System: The UNT Digital Library