Capacity survey -- Separations Division (open access)

Capacity survey -- Separations Division

Recent tentative production forecasts indicate that as much as 96.6 Kg plutonium, associated with 190 tons uranium, may be produced each month. The ability of the Separations facilities to process these materials is herein summarized. The Redox Production Plant capacity has been reasonably predicted at about 112 tons uranium per month; this rate assumes only that critical mass control is achieved by the limitation of the possible volume accumulation at any point, and that the product concentration step has been modified to permit the greater capacity. At 600 MWD/T (522 g/t) then, the 112 tons uranium per month capacity limits the plutonium output of the plant to 58.5 Kg per month at 80% operating efficiency. The remaining 38 Kg plutonium per month may be processed in the B and T BiPO{sub 4} plants at an operating efficiency of 89.5%; if this operating efficiency cannot be realized, the postulated production rate may be met by either an increased Redox efficiency or by accepting an increased plutonium waste loss of 1% on some portion of the BiPO{sub 4} production.
Date: June 28, 1951
Creator: Frame, J. M. & Tomlinson, R. E.
System: The UNT Digital Library
Expansion of Hanford Works facilities (open access)

Expansion of Hanford Works facilities

This report discusses the feasibility of designing and building two 100 Areas at the Coyote Rapids site on the Columbia River. It incorporates the individual studies prepared by the Power and Mechanical Division-HDC-2241, Reactor Division-HDC-2239, Project Engineering Division-HDC-2244, Principal Engineer and HDC-2242, and the Engineering and Construction Services Division-HDC-2243, each outlining the proposed course of action and requirements for that facet of the contemplated work in which they are primarily interested.
Date: June 28, 1951
Creator: Parker, J. S.
System: The UNT Digital Library