Masonry
Caption says, "A-886 Placing granite masonry on the left abutment prior to placing concrete."
Date:
July 27, 1943
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Altus City Water Line
Caption says, "A-854 Making final connection on Altus City water line to be included in new dam. Old wood stave line may be seen in foreground."
Date:
April 27, 1943
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Concrete Placing
Caption says, "A-855 Concrete in spillway section at Elevation 1488.5 showing blockout for river outlets and completed Block B of intermediate training wall."
Date:
April 27, 1943
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Progress Picture
Caption says, "A-887 General view of progress on dam taken from access road on left abutment. Note forms in place for piers in canal outlet trashrack structure."
Date:
July 27, 1943
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History
Concrete Placing
Caption says, "A-856 Concrete in spillway portion of dam at Elevation 1488.5 taken from high on left abutment. Note sumps for cleanup water."
Date:
April 27, 1943
Creator:
Breitenstein, Frank C.
System:
The Gateway to Oklahoma History