Explosives TNX Technical Division, Hanford weekly report for period ending July 25, 1944 (open access)

Explosives TNX Technical Division, Hanford weekly report for period ending July 25, 1944

Progress on finding suitable water conditions for start-up had been approached as closely as possible with our present equipment and information as to the requirements. The water composition should be attainable that is not corrosive or build up a film rapidly, and we have means available for removal of such films. Slug classification methods were analyzed from a dimensional standpoint. Analysis of current CMX data was undertaken with the objective of establishing allowable variations in pressure drop in W-tubes due to film formation. Calculations were made of the number of slugs which have jacket temperatures in excess of various values, for various loading arrangements. On July 26 the proposed loading of the discharge nozzle is to be checked on CMX tube 1 during an inspection shut-down. Evacuation procedures in the event of a catastrophe in the 100-B area were discussed with W.E. Rapp during a visit to that area on July 19, 1944. Tests for slug leaks will not be less severe with water in the autoclave than with steam, and have a considerable chance to be more decisive, especially if a wetting agent is added to the water. Calculations were made on the sensitivity to be expected from three …
Date: July 26, 1944
Creator: Worthington, H.
System: The UNT Digital Library
Specifications for the Freezing Point Method for Determination of the Amount of HF in UF₆ (open access)

Specifications for the Freezing Point Method for Determination of the Amount of HF in UF₆

From introduction: "You will find enclosed the specifications for the freezing point method for determination of the amount of HF in UF₆. The specification for cleaning new shipping containers is also included."
Date: February 26, 1944
Creator: Priest, Homer F.
System: The UNT Digital Library
Maximum Force of a Warped Rod Against a Rigid Constraint (open access)

Maximum Force of a Warped Rod Against a Rigid Constraint

Abstract. Given the maximum intrinsic curvature of a rod, the maximum force required to confine it between parallel rigid walls is computed.
Date: October 26, 1944
Creator: Martin, A. V.
System: The UNT Digital Library